Manual de instrucciones Amana ACV9

40 de páginas 0.99 mb
Descargar

Pasar a la página of 40

Summary
  • Amana ACV9 - page 1

    © 2004-2006 Goodman Compa ny , L.P . Installer: Affix all manuals adjacent to the unit. I NST ALLA TION I NSTRUCTIONS AMV9/ACV9 T WO -S T AGE V ARIABLE S PEED GAS - FIRED W ARM AIR FURNACE IO-253H *NOTE: Please contact your distributor or our website for the applicable product data book referred to in this manual. A TTENTION INST ALLING PERSONNEL ...

  • Amana ACV9 - page 2

    2 T able of Content s I. Component Identification ............................................................................................................................................... 5 II. Safety ..................................................................................................................... ......................... ...

  • Amana ACV9 - page 3

    3 XIV . St artup Procedure & Adjustment ............................................................................................ ................................. 2 8 H EA T A NTICIP A TOR S ETTING ............................................................................................................................... .2 8 D RAIN T RA ...

  • Amana ACV9 - page 4

    4 WARN ING I F THE INFORMATION IN THESE INSTRUCTI O NS IS NOT FOLLOWED EX ACTLY, A FIRE OR EXPLOSION MAY RESULT CAUSIN G PROPERTY DAMAGE , P ERS ONAL INJURY OR LOSS OF LIFE. – D O NOT STORE OR USE GASOLINE OR OTHER FLAMMA BLE VAPORS AND LIQUIDS IN THE VICI NITY OF THIS O R ANY OTHER APPLIANCE . – WHAT TO DO IF YOU SM ELL GA S : • D O NO T TRY ...

  • Amana ACV9 - page 5

    5 I. CO I. CO I. CO I. CO I. CO MPO MPO MPO MPO MPO NENT ID NENT ID NENT ID NENT ID NENT ID ENTIFI ENTIFI ENTIFI ENTIFI ENTIFI C C C C C A A A A A TI TI TI TI TI O O O O O N N N N N 1 T wo-S tage Gas V alve 2 Gas Line Entrance (Alternate) 3 Pressure Switch(es) 4 Gas Manifold 5 Combustion Air Intake Connection 6 Hot Surface Igniter 7 Rollout Limit 8 ...

  • Amana ACV9 - page 6

    6 If you come in contact with an ungrounded object, repeat step 2 before touching control or wires. 4 . Discharge your body to ground before removing a new control from it s cont ainer . Follow step s 1 through 3 if installing the control on a furnace. Return any old or new controls to their containers before touching any ungrounded object. III. PR ...

  • Amana ACV9 - page 7

    7 IV IV IV IV IV . LOC . LOC . LOC . LOC . LOC A A A A A TI TI TI TI TI O O O O O N REQUIREMENTS & CO N REQUIREMENTS & CO N REQUIREMENTS & CO N REQUIREMENTS & CO N REQUIREMENTS & CO NSID NSID NSID NSID NSID ERA ERA ERA ERA ERA TI TI TI TI TI O O O O O NS NS NS NS NS G ENERAL WARN ING T O PRE VE NT POSS IBLE EQ UIPM ENT DAM A G E ...

  • Amana ACV9 - page 8

    8 construction, the clearance between the door and door frame is usually adequate to satisfy this ventilation requirement. F URNACE S USPENSION If suspending the furnace from rafters or joists, use 3/8" threaded rod and 2”x2”x1/8” angle iron as shown below . The length of rod will depend on the application and the clearances necessary . ...

  • Amana ACV9 - page 9

    9 ANSI Z223.1 (Section 5.3), or CSA B149 Installation Codes (Sec- tions 7.2, 7.3, or 7.4), or applicable provisions of the local building codes for determining the combustion air requirements for the appliances. Most homes will require outside air be supplied to the furnace area by means of ventilation grilles or ducts connecting directly to the ou ...

  • Amana ACV9 - page 10

    10 Fur n ac e Water Heater Outlet Air C himney or Gas Vent N OTE : Th e inlet and outlet air o pen i n gs must eac h have a free are a of not less than on e sq uare inch per 40 00 B TU o f th e total i n put ra t ing of al l equip me nt in the enclos ure. Inle t air duct [end s 1 f t (300 m m) above floor] V entilation louvers (eac h end o f atti c ...

  • Amana ACV9 - page 11

    11 5. When directly communicating with the outdoors, the single open- ing shall have a minimum free area of 1 square inch per 3,000 BTU per hour of total input rating of all equipment in the enclo- sure. 5.3.4 Specially Engineered Installations: The requirements of 5.3.3 shall not necessarily govern when special engi- neering, approved by the autho ...

  • Amana ACV9 - page 12

    12 AIR DIS CHA RGE AI R DISC HARGE AI R DIS CHA RGE Bo tto m Return Duct Co nnec t ion Bottom Retu rn Duct C onn e ction Bottom Return Duct C onn e ction Sid e Return Du ct Conn ection Sid e Return Duct Co nnection UPFLO W UPRIG HT UPFLO W HOR I ZONT AL RIG HT AI R DI SC HARGE UPFL OW HOR IZ ONTAL LEF T AIR DI S CHA RGE ALTERNA T E FLUE AND COMB US ...

  • Amana ACV9 - page 13

    13 located in this section for specific details on termination construc- tion. • All terminations (flue and/or intake) must be located at least 12 inches above ground level or the anticipated snow level. • V ent terminations (non-direct and direct vent) must terminate at least 3 feet above any forced air inlet located within 10 feet. NOTE: This ...

  • Amana ACV9 - page 14

    14 S TANDARD F URNACE C ONNECTIONS It is the responsibility of the installer to ensure that the piping connections to the furnace are secure, airtight, and adequately supported. As shipped, attachment “couplings” for vent/flue and combustion air intake pipe connections are provided on the furnace’s top cover (upflow) or basepan (counterflow). ...

  • Amana ACV9 - page 15

    15 coupling to the cabinet using the screws removed in step 1 or with field-supplied 3/8” #8 self drilling screws. WARNING T HE RUBBER ELBOW IS NOT DESIGNED TO SUPPORAT A LOAD. W HEN THE RUBBER E LBOW IS MOUNTED E XTERNALL Y TO THE FURNACE CABI NET, EXTREME CARE MUST BE TAKEN TO ADEQ UATE LY SUPPORT FIELD-SU PPLIED VENT/FLUE PIPING, AS DAMAGE CAN ...

  • Amana ACV9 - page 16

    16 123456 78 45,000 2 71 68 65 62 59 56 53 50 2 4 94 64 34 03 73 4 3 12 8 3 7 16 86 56 25 95 6 5 35 0 90,000 3 7 16 86 5 6 25 95 65 35 0 115,000 3 4 94 64 3 4 03 73 43 12 8 123456 78 2 6 15 85 55 24 94 6 4 34 0 3 7 16 86 56 25 95 6 5 35 0 2 6 15 85 55 24 94 6 4 34 0 3 7 16 86 56 25 95 6 5 35 0 UPFLOW Non-Direct Vent (Sin gle Pipe) Maximum Allowabl ...

  • Amana ACV9 - page 17

    17 12" MI N . TO ROOF OR HI GHE ST ANTICIPATED SNO W LEVEL 90º MEDIUM RADIUS ELBOWS Alternate Vertical Termination (Single Pipe) MIN . 12" FROM WALL 12" T O GROUND OR HI GHEST AN TICIP ATED SNOW LEVEL WA LL INSIDE OU TSIDE TE E or 90° EL BOW TURNED DOW N COUPL ING ELB OW O R CO UPL ING Horizontal Termination (Single Pipe) VENT/FLU ...

  • Amana ACV9 - page 18

    18 Horizontal terminations should be as shown in the following fig- ure. Refer to Section IX, Vent/Flue Pipe and Combustion Pipe - T ermination Location for location restrictions. A 2 3/8 inch diameter wall penetration is required for 2” diameter pipe while a 3 1/2 inch diameter hole is required for 3” diameter pipe. T o secure the pipe passing ...

  • Amana ACV9 - page 19

    19 accordance with all local codes and the instructions in the follow- ing sections. Follow the bullets listed below when installing the drain system. Refer to the following sections for specific details concerning fur- nace drain trap installation and drain hose hook ups. • The drain trap supplied with the furnace must be used. • The drain lin ...

  • Amana ACV9 - page 20

    20 “right-side only” drain hoses to be connected as follows. Refer to Section IX, Vent/Flue Pipe and Combustion Air Pipe for details on alternate vent/flue pipe connection. 1. Remove the rubber plug from the front cover right-side drain port. Save for use in step 3. 2. Secure Hose A to front cover drain port with a red hose clamp. Route hose to ...

  • Amana ACV9 - page 21

    21 LE FT S I D E PA NEL FR ON T C OV E R DRAI N P ORT SI DE P ANEL GR O MM E T HOLE S DRAI N T RAP T UB E(S ) 2 G REEN HOS E CLA M PS (3 P LACES) HOSE A HOSE B INDU CED DR AF T BLO WE R DRAI N P ORT FR O NT CO VER PRESSU RE TA P RED HOS E CLAMP Horizontal Connections - Left Side Down (Upflow Shown, Counterflow Similar) 4. Remove the rubber cap from ...

  • Amana ACV9 - page 22

    22 * * * ** * * * * STANDARD JUNCTI ON BO X LOCATIO N ALTERNAT E JUNCTI ON BO X LOCATIO N Junction Box Relocation WARN ING T O AVOID THE RISK O F INJUR Y, ELECTRICA L S HOCK OR DEATH, THE FURNACE MUST BE ELECTRICALLY GROUNDED IN AC CORDANCE WITH LOCAL CODES OR, IN THEIR ABSENCE, WITH THE LATEST E D ITIO N OF THE N ATIONAL E LECTRIC C ODE. T o ensur ...

  • Amana ACV9 - page 23

    23 tion. This lower blower speed enhances dehumidification of the conditioned air as it passes through the AC coil. For proper func- tion, a dehumidistat applied to this furnace must operate on 24 V AC and utilize a switch which opens on humidity rise. T o install/connect a dehumidistat: 1. Turn OFF power to furnace. 2. Secure the dehumidistat neut ...

  • Amana ACV9 - page 24

    24 Inlet gas supply pressures must be maintained within the ranges specified below . The supply pressure must be constant and avail- able with all other household gas fired appliances operating. The minimum gas supply pressure must be maintained to prevent unreliable ignition. The maximum must not be exceeded to pre- vent unit overfiring. Propane G ...

  • Amana ACV9 - page 25

    25 CAUTION E DGES O F SHEET ME TAL HOLES MAY BE S HARP. U S E G LOV ES A P R ECAUTION WHEN REMOVING HOLE PLUGS. D IRECT /S TANDARD I NLET P IPING When gas piping enters directly to the gas valve through the stan- dard inlet hole, the installer must supply straight pipe with a ground joint union to reach the exterior of the furnace. The rigid pipe m ...

  • Amana ACV9 - page 26

    26 Sizi ng Betwe en Si ngle or S econd S tag e Regul a tor and Appli ance * Maximum Propane Capacities Listed are Based on 1/2" W.C. pressure drop at 11" W. C. setting. Capacities in 1,000 B TU/hour. Pipe or Nomi nal Pipe Si z e Tubi ng Tubi ng Siz e , O. D. Ty pe L S c h edul e 4 0 Length , 3/8 " 1/2" 5/8" 3/4" 7/8&qu ...

  • Amana ACV9 - page 27

    27 CUT FOUR CO RNERS AFTER REMOVING SHEET META L CUT USING TIN SNIPS PRE SS O UT BY HAN D SCRIBE LINES OUTLINING DUCT FLANGES Duct Flange Cut Outs When the furnace is used in connection with a cooling unit, the furnace should be installed in parallel with or on the upstream side of the cooling unit to avoid condensation in the heating element. With ...

  • Amana ACV9 - page 28

    28 FILTE R AIR FLOW CENTRAL RETURN GRILLE FI LTE R SIDE RETURN EXTERNAL FILTER RACK KIT (EITHER S IDE) FI L T ER FILTER A IR F LOW FILTE R ACCES S DOOR CENT RAL RET URN GRILLE RETURN DUCT F I LT ER FILTE R SUP PORT BRACKET (PROVI DED) Possible Upright Upflow Possible Upright Counterflow Filter Locations NOTE: Internal filter retention is not provid ...

  • Amana ACV9 - page 29

    29 1. Turn OFF gas to furnace at the manual gas shutoff valve external to the furnace. 2. Connect a calibrated water manometer (or appropriate gas pressure gauge) at either the gas valve inlet pressure boss or the gas piping drip leg. Gas Li ne Gas Shut off Valv e Ga s Lin e To Furnace Dri p Leg C ap W ith F itt in g Mano me ter H os e Ma nom eter ...

  • Amana ACV9 - page 30

    30 Installation’s seconds per cubic foot: 34 sec/ ft 3 Conversion Factor (hours to seconds): 3600 sec/hr Input = (Htg. value x 3600) ÷ seconds per cubic foot Input = (1,000 BTU/ft 3 x 3600 sec/hr) ÷ 34 sec/ ft 3 Input = 106,000 BTU/hr Minor changes to the input rate may be accomplished through manifold pressure adjustments at the gas valve. Ref ...

  • Amana ACV9 - page 31

    31 O F F O F F 87 4 3 2 1 O F F O N 43 2 1 O N O F F 43 2 1 O N O N 43 2 1 Cooling Spee d Tap A Cooling Spee d Tap B Cooling Spee d Tap C Cooling Spee d Tap D * Coolin g Speed T aps ( * indicat es factory setting) O F F O F F 87 4 3 21 O F F O N 87 4 3 21 O N O F F 87 4 3 21 O N O N 87 4 3 21 Heati ng Spee d Tap A Heati ng Spee d Tap B Heati ng Spe ...

  • Amana ACV9 - page 32

    32 motor to reset and recognize new speed selection. Turn on power to furnace. V erify selected CFM by counting the green CFM LED blinks. In general lower heating speeds will: reduce electrical consump- tion, lower operating sound levels of the blower , and increase the outlet air temperature delivered to the home. The speeds avail- able allow the ...

  • Amana ACV9 - page 33

    33 • Circulator blower is energized on the appropriate cool speed at the level and time determined by the selected ramping profile. Electronic air cleaner terminals are energized with circulator blower . • Furnace circulator blower and outdoor cooling unit run their appropriate speed, integrated control module monitors safety circuits continuou ...

  • Amana ACV9 - page 34

    34 step 2 before touching control or wires. 4 . Discharge your body to ground before removing a new control from it s cont ainer . Follow step s 1 through 3 if installing the control on a furnace. Return any old or new controls to their containers before touching any ungrounded object. D IAGNOSTIC C HART WARN ING T O AVOID ELECTRICAL SHOCK, INJ URY ...

  • Amana ACV9 - page 35

    35 C ONDENSATE T RAP AND D RAIN S YSTEM (Q UALIFIED S ERVICER O NLY ) Annually inspect the drain tubes, drain trap, and field-supplied drain line for proper condensate drainage. Check drain system for hose connection tightness, blockage, and leaks. Clean or repair as necessary . F LAME S ENSOR (Q UALIFIED S ERVICER O NLY ) Under some conditions, th ...

  • Amana ACV9 - page 36

    36 Rollout Limit Switch Heat Exchanger Primary Limit Switch Recuperator Coil Auxiliary Limit Switch Coil Front Cover Pressure Switch Integrated Control Module Induced Draft Blower Transformer Door Switch ...

  • Amana ACV9 - page 37

    37 1 Integrated control module will automatically attempt to reset from lockout after one hour . TR TR TR TR TR OUBLESH OUBLESH OUBLESH OUBLESH OUBLESH OO OO OO OO OO TIN TIN TIN TIN TIN G CHAR G CHAR G CHAR G CHAR G CHAR T T T T T • Furnace lockout due to an excessive number of ignition “retries” (3 total) 1 . • Locate and correct gas inte ...

  • Amana ACV9 - page 38

    38 • Inspect pressure switch hose. Repair , if necessary . • Inspect flue and/or inlet air piping for blockage, proper length, elbows, and termina- tion. Check drain system. Correct as necessary . • Correct pressure switch setpoint or contact motion. • Tighten or correct wiring connection. Fault Description(s) Symptoms of Abnormal Operation ...

  • Amana ACV9 - page 39

    39 WIRIN WIRIN WIRIN WIRIN WIRIN G DIAGRA G DIAGRA G DIAGRA G DIAGRA G DIAGRA M M M M M DEHUM W A R N I N G : D I S C O N N E C T P R O P E R L Y P O L A R I Z E D S E R V I C I N G . W I R I N G T O U N I T M U S T B E A N D G R O U N D E D . P O W E R B E F O R E D I S C O N N E C T P O W E R M U S T B E P R O P E R L Y B E F O R E S E R V I C I ...

  • Amana ACV9 - page 40

    40 © 2004-2006 Goodman Compa ny , L.P . 2550 North Loop West, Suite 400 Houston, TX 77092 www .amana-hac.com ® is a trademark of Maytag Corporation and is used under license to Goodman Company , L.P . All rights reserved. ...

Fabricante Amana Categoría Furnace

Los documentos del dispositivo Amana ACV9 que obtenemos del fabricante se pueden dividir en varios grupos. Entre ellos están::
- dibujos técnicos Amana
- manuales de instrucciones ACV9
- hojas de producto Amana
- folletos informativos
- o etiquetas energéticas Amana ACV9
Todos son importantes, pero lo más importante desde el punto de vista del usuario de un dispositivo lo encontraremos en el manual de instrucciones Amana ACV9.

Un conjunto de documentos determinado como manual de instrucciones se divide también en tipos más detallados, tales como: instrucciones de montaje Amana ACV9, instrucciones de servicio, instrucciones cortas o instrucciones de usuario Amana ACV9. Dependiendo de la situación debes buscar el documento que necesitas. En nuestra página puedes consultar el manual de instrucciones más popular del producto Amana ACV9.

Manuales de instrucciones parecidos

El manual de instrucciones del dispositivo Amana ACV9, ¿cómo debería ser?
El manual de instrucciones, también determinado como el manual de usuario o simplemente instrucciones, es un documento técnico que tiene como objetivo ayudar a los usuarios a utilizar Amana ACV9. Las instrucciones normalmente las realiza un escritor técnico pero en un lenguaje comprensible para todos los usuarios de Amana ACV9.

El manual de instrucciones completo de Amana debe contener unos elementos básicos. Una parte de ellos es menos importante, como por ejemplo: la portada / la página principal o las páginas de autor. Sin embargo, lo demás debe facilitarnos la información más importante desde el punto de vista del usuario.

1. Introducción y pistas sobre cómo orientarse con el manual Amana ACV9 - Al principio de cada manual se deben encontrar las indicaciones acerca de la manera de usar un manual de instrucciones. Debe contener información sobre dónde encontrar el índice Amana ACV9, preguntas frecuentes o problemas más comunes – son los apartados más buscados por los usuarios de cada manual de instrucciones.
2. Índice - listados de todos los consejos acerca de Amana ACV9 que encontraremos en el documento
3. Consejos de uso de las funciones básicas del dispositivo Amana ACV9 - que deben facilitarnos los primeros pasos durante el uso de Amana ACV9
4. Troubleshooting - una secuencia sistematizada de acciones que nos ayudará a diagnosticar los problemas más importantes con Amana ACV9
5. FAQ - las preguntas frecuentes
6. Datos de contacto Información acerca de cómo encontrar los datos de contacto del fabricante / servicio de Amana ACV9 en cada país si no somos capaces de solucionar el problema por nuestra cuenta.

¿Tienes una pregunta acerca de Amana ACV9?

Utiliza el formulario que se encuentra abajo

Si con la ayuda del manual de instrucciones encontrado no has podido solucionar tu problema con Amana ACV9, haz una pregunta utilizando el formulario que se encuentra abajo. Si alguno de los usuarios ha tenido un problema parecido con Amana ACV9 probablemente compartirá una forma de solucionarlo.

Copia el texto de la imagen

Comentarios (0)