APC ACRD101の取扱説明書

56ページ 0.68 mb
ダウンロード

ページに移動 of 56

Summary
  • APC ACRD101 - page 1

    Operation and Maintenance InRow ® RD 10kW Air Cooled ACRD100 ACRD101 ...

  • APC ACRD101 - page 2

    This manual is available in English on the enclosed CD. Dieses Handbuch ist in Deutsch auf der beiliegenden CD -ROM verfügbar . Deze handleiding staat in het Nede rlands op de bijgevoegde cd. Este manual está disponible en español en el CD-ROM adjunto. Ce manuel est disponible en français sur le CD-ROM ci-inclus. Questo manuale è disponibile i ...

  • APC ACRD101 - page 3

    American Power Conversion Legal Disclaimer The information presented in this manual is not warranted by the American Power Conversion Corporation to be authoritative, erro r free, or complete. This publicatio n is not meant to be a substitute for a detailed operational and site specific development plan. Theref ore, American Power Conversion Corpor ...

  • APC ACRD101 - page 4

    ...

  • APC ACRD101 - page 5

    Content s InRow RD 10 kW Air Cooled Operation and Maintenance i General Information .................. ...................................... 1 Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 Symbols used in this manual . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 Cross-referen ...

  • APC ACRD101 - page 6

    ii InRow RD 10 kW Ai r Cooled Operation and Maintenance Contacts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17 View the state of input and output contacts . . . . . . . . . . . . . . . . 17 Edit the normal state of input and output contacts . . . . . . . . . . 17 Cooling Group Configuration . . . . ...

  • APC ACRD101 - page 7

    InRow RD 10 kW Air Cooled Operation and Maintenance iii Network Management Card ...... ................... ................. 32 Quick Configuration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32 Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32 TCP/IP c onfiguratio n meth ...

  • APC ACRD101 - page 8

    ...

  • APC ACRD101 - page 9

    1 InRow RD 10 kW Air Cooled Operatio n and Maintenance General Information Overview Note the definitions for the icons here and be observant for them throughout th is manual. They are intended to call attention to potentia l hazards and important information. Symbols used in this manual Electrical Hazard: Indicates an electrical hazard which, if no ...

  • APC ACRD101 - page 10

    InRow RD 10 kW Air Cooled Opera tion and Maintenan ce 2 Safety Read and adhere to the following important safety considerations wh en working with this cooling unit. Note: All work must be performed by American Power Conversion (APC ® ) authorized personnel only . Caution: Keep your ha nds, clothing, and jewelr y away from moving parts. Check the ...

  • APC ACRD101 - page 11

    3 InRow RD 10 kW Air Cooled Operatio n and Maintenance Commissioning W arning: APC authorized personne l must perform the following procedures. Electrical Hazard: Perform Lockout/T agout procedure s on the cooling unit before servicing the cooling un it. Failure to remove power before servicing this equipment could result in serious injury or death ...

  • APC ACRD101 - page 12

    InRow RD 10 kW Air Cooled Opera tion and Maintenan ce 4 Electrical inspection checklist The electrical inspection verifies th at all electrical connections are secure and correct and that the cooling unit is properly grounded. Electrical Hazard: A ll electrical wiring must comply with local and national codes and regulations. Electrical Hazard: The ...

  • APC ACRD101 - page 13

    5 InRow RD 10 kW Air Cooled Operatio n and Maintenance Mechanical inspection checklist The mechanical inspection verifie s that all mechanical compone nts an d connections are secure and tight and ready for start-up and system charging. The insp ection ensures that field piping is properly installed to promote oil return to the compressor . W arnin ...

  • APC ACRD101 - page 14

    InRow RD 10 kW Air Cooled Opera tion and Maintenan ce 6 User interface inspection chec klist The user interface inspection verifi es tha t the sensors and internal co mmunications links of the cooling unit are installed properly . St art-up inspection checkl ist The start-up inspection ensures that the cooling unit is operating properly after the i ...

  • APC ACRD101 - page 15

    7 InRow RD 10 kW Air Cooled Operatio n and Maintenance Charging With Refrigerant Calculating R410A charge Use the following table and formula wh en calculating the total R410A charge. Note: All refrigerant pipes must be straight ACR to have 39 bar (565 psig) or above MWP . Equivalent length of 1/2 in OD discharge line pipe sh ould be kept less than ...

  • APC ACRD101 - page 16

    InRow RD 10 kW Air Cooled Opera tion and Maintenan ce 8 Quantity of R410A in 1/2 in OD liquid line: (area) x (length in ft) x (density): 0.0010554 (ft 2 ) x L (ft) x 61.0 (lbm/ft 3 ) Density of liquid R410A at 40.6 ° C (105 ° F) and 260 psig: 0.98 g/cm 3 (61. 0 lbm/ft 3 ) Cross sectional area for 1/2 in OD pipe is 0.0010554 ft 2 . Liquid line cha ...

  • APC ACRD101 - page 17

    9 InRow RD 10 kW Air Cooled Operatio n and Maintenance Charging the equipment Caution: This procedure i s to be done by APC-trained personnel only . R410A is a blend refrigerant. When chargin g equipment with blend refrigerants, only liqu id refrigerant must be ch arged. Caution: Char ging with other than liquid R41 0 A refrigerant may damage the s ...

  • APC ACRD101 - page 18

    InRow RD 10 kW Air Cooled Opera tion and Maintenan ce 10 Compressor Oil Charge Caution: This procedure is to be done by APC-trained personnel only . Y ou may need to ad d oil to air -cooled equipment, depending on the condenser size and the lengths of tube running between the equipment and the condenser . Caution: Do not charge the compressor with ...

  • APC ACRD101 - page 19

    11 InRow RD 10 kW Air Cooled Op eration and Maintenanc e 2. Prepare to add oil: a. Use a new , seale d oil can and a manual oil pu mp. The pump hose must be sized for 1/4 in flare fittings and must include a valve depressor at its end, which will open the valve on the Schrader service port of the compressor . b. At a minimum, use a quality POE oil ...

  • APC ACRD101 - page 20

    InRow RD 10 kW Air Cooled Opera tion and Maintenan ce 12 Operation Display Interface Item Function  Critical Al arm LED (red) When lit, a critical alarm condition exists and requires immediate attention.  W arning Alarm LED (yellow) When lit, a wa rning alarm condition exists. Failure t o correct this condition coul d cause a critical alarm. ...

  • APC ACRD101 - page 21

    13 InRow RD 10 kW Air Cooled Op eration and Maintenanc e Using the Display Interface Every time power is applied to th e cooling unit, the display interf ace initializes, caus ing the LEDs to cycle and the alarm-tone to activate. Scrolling st atus screens After start-up, the interface displays the firmware revision number on the display interface. ...

  • APC ACRD101 - page 22

    InRow RD 10 kW Air Cooled Opera tion and Maintenan ce 14 Navigating the main menu Selector arrow . Press the up or down arrow key to move the selector arrow  to a main menu option. Press the E NTER key to view the selected sub-menu screen. In the example shown below , the selector arrow points to the Set Date and T ime setting. T o select that i ...

  • APC ACRD101 - page 23

    15 InRow RD 10 kW Air Cooled Op eration and Maintenanc e Using the Path statement Select the main- and sub-menu options specified in t h e path statement to view or configure a setting. The path statement lists the main- and sub-menu items you select to navigate to the item to view or modify . The parts of the path statement are defined below: Path ...

  • APC ACRD101 - page 24

    InRow RD 10 kW Air Cooled Opera tion and Maintenan ce 16 Stop the cooling unit Path: Main > On/S tandby Press the E NTER key to change the setting to S tandby . The cooling unit enters the standby mode. Electrical Hazard: The Standby option does not remove p o wer from the cooling unit. Y ou must disconnect power at the mains to remove power fro ...

  • APC ACRD101 - page 25

    17 InRow RD 10 kW Air Cooled Op eration and Maintenanc e Cont act s View the st ate of input and output cont acts Path: Main > Configure Unit > Discrete I/O Each cooling unit supports a user-defined input c ontact and a user -def ined output contact. Each contact monitors a sensor and responds to changes in the state of the sensor (open or cl ...

  • APC ACRD101 - page 26

    InRow RD 10 kW Air Cooled Opera tion and Maintenan ce 18 Ty p e . Set the rack deployment strategy for th e cooling units of this coolin g group: • Spot: The cooling unit is us ed as a stand-alone unit. • In-Row : Air flow is not ducted. Hot-aisle air is cooled and the cooled-air supp ly is shared by all loads in the row . • RACS (Rack Air Co ...

  • APC ACRD101 - page 27

    19 InRow RD 10 kW Air Cooled Op eration and Maintenanc e Control the Environment The primary function of the cooling unit is to captur e the h eat generated by IT equipment and neutralize it before it mixes with the room. Th e control strategies employed by the cooling unit depend upon the deployment strategy of the cooling group. In an InRow envir ...

  • APC ACRD101 - page 28

    InRow RD 10 kW Air Cooled Opera tion and Maintenan ce 20 PID settings Path: Main > Set Group PID The Proportional plus In tegral plus Derivative (PID) loop controls th e output of the fans. Caution: This procedure is to be performed by APC authorized personnel only . Improperly set PID controls could resu lt in e quipment d amage. There are two ...

  • APC ACRD101 - page 29

    21 InRow RD 10 kW Air Cooled Op eration and Maintenanc e T une the PID loop T une the PID loop to optimize the performance of the coolin g group. Caution: This procedure must be performed by APC authorized pers onnel only . The PID loop must be tuned after the equipment in the room is installed and ru nning. The loop should be tuned periodically to ...

  • APC ACRD101 - page 30

    InRow RD 10 kW Air Cooled Opera tion and Maintenan ce 22 Run hours The cooling unit records the number of hours each of its components has operat ed. When a compon ent is replaced, use the Reset Run Hours option to reset the run hours for the displayed component to zero. Path: Main > Vi ew Run Hours • Air Filter – Reset Run Hours Note: Repla ...

  • APC ACRD101 - page 31

    23 InRow RD 10 kW Air Cooled Op eration and Maintenanc e Display Settings Set display interface settings incl uding the time and date, units of measure, passwords, and time-out settings. Y ou can also adjust the contrast, key click, beeper volume, and beep-on-alarm settings. Password and time-out Path: Main > Set Password Note: The default user ...

  • APC ACRD101 - page 32

    InRow RD 10 kW Air Cooled Opera tion and Maintenan ce 24 Adjust display settings Path: Main > Configure Display Contrast. Adjust the visibility of the screen text. Lowe r numbered settings provid e darker text; higher numbers provide lighte r text. Settings range from 0 – 7. Key Click. Set to ON or OFF will enable or disable an audible to ne t ...

  • APC ACRD101 - page 33

    25 InRow RD 10 kW Air Cooled Op eration and Maintenanc e Network Configuration The cooling unit is shippe d with a Network Man agement Card th at enables the cooling unit to be managed over a network. Configure the network se ttings for the Network Mana gement Card for this cooling unit from the display interfa ce. The management card allo ws remot ...

  • APC ACRD101 - page 34

    InRow RD 10 kW Air Cooled Opera tion and Maintenan ce 26 V iew St atus Readings The display interface has several optio ns for viewing the status of the coo ling unit, the cooling group to which the cooling unit belongs, an d the enviro nment being controlled. The status readings for the cooling unit are available under the Vi e w U n i t Sta t u s ...

  • APC ACRD101 - page 35

    27 InRow RD 10 kW Air Cooled Op eration and Maintenanc e Cooling group st atus Path: Main > Vi ew Group St atus V iew information abou t the cooling group. Cool Output. The combined output of the cool ing group. Cool Demand. The cooling output required to meet the cu rrent heat load of the conditioned space. Cool Setpt. The temperature you set t ...

  • APC ACRD101 - page 36

    InRow RD 10 kW Air Cooled Opera tion and Maintenan ce 28 Event Log The event log saves status information and a mes sage each time a change in the cooling group is detected. Alarms and events are recorded in the lo g and displayed on the active alarms screen. Status information an d system configurat ion cha nges are displayed in the event log only ...

  • APC ACRD101 - page 37

    29 InRow RD 10 kW Air Cooled Op eration and Maintenanc e Respond to Alarms When an alarm is triggered, the cooling unit alerts you through th e display interface by the following methods: • Active alarm screen entry on scrolling status screens • LED s on the front panel display • An optional audible alarm, if enabled, ev ery 30 seconds Vi ew ...

  • APC ACRD101 - page 38

    InRow RD 10 kW Air Cooled Opera tion and Maintenan ce 30 High Suction Pres (High Suction Pressure) W arning • Check the air filter and fans for obstructi ons • If the problem persists, contact APC at a number on the back cover of this manual. Fan Num Fault (Fan # Fault) W arning • A hardware failure exists. Fo r assistance, contact APC at a n ...

  • APC ACRD101 - page 39

    31 InRow RD 10 kW Air Cooled Op eration and Maintenanc e Suction Pressure Sensor Failure W arning • Make sure the sensor is connected properly . • If the problem persists, replace the sensor or contact APC at a number on the back cover of this manual. Dischrg Pressure Sensor Failure W arning • Make sure th e sensor is connected properly . • ...

  • APC ACRD101 - page 40

    InRow RD 10 kW Air Cooled Opera tion and Maintenan ce 32 Network Management Card Quick Configuration The cooling unit is shippe d with a Network Management Card th at enables the cooling unit to be managed over a network. Co nfigure the Network Mana gement Card to control this cooling unit through a network. Overview Y ou must configure the followi ...

  • APC ACRD101 - page 41

    33 InRow RD 10 kW Air Cooled Op eration and Maintenanc e APC Device IP Configuration Wizard Y ou can use the APC Device IP Configuration W i zard at a computer running Microsoft ® W indows 2000, W indows Server 2003, or W indows XP to configure a Network Management Card. Note: Most software firewalls must be temporarily disabled for the W izard to ...

  • APC ACRD101 - page 42

    InRow RD 10 kW Air Cooled Opera tion and Maintenan ce 34 BOOTP . For the Network Management Card to use a B OOTP server to configure its TCP/IP settings, it must find a properly configured RFC951-compliant BOOTP server . 1. In the BOOTP T AB file of the BOOTP serve r , enter the MAC address of the Network Management Card, th e IP address, the subne ...

  • APC ACRD101 - page 43

    35 InRow RD 10 kW Air Cooled Op eration and Maintenanc e Local access to the control console Y ou can use a computer connected to the serial port on the main board holdin g the Network Managemen t Card to access the control console. 1. Select a serial port at the local computer, and disable any service that uses that port. 2. Use the provided confi ...

  • APC ACRD101 - page 44

    InRow RD 10 kW Air Cooled Opera tion and Maintenan ce 36 1. Use Ping with a siz e of 113 bytes to assign the IP address defined by the ARP command. For the IP address defined in step 1, use on e of the following Ping commands: – W indows command format: ping 156.205.14.141 -l 113 – LINUX command format: ping 156.205.14.141 -s 113 2. Use T elnet ...

  • APC ACRD101 - page 45

    37 InRow RD 10 kW Air Cooled Op eration and Maintenanc e Access a Configured Network Management Card Overview After the Network Management Card is running on your network, you can a ccess the configured Network Management Card thro ugh the following interfaces: • W eb interface (HTTP or HTTPS protocol) • T elnet or Secure SHell (SSH) • S N M ...

  • APC ACRD101 - page 46

    InRow RD 10 kW Air Cooled Opera tion and Maintenan ce 38 T elnet and SSH Y ou can acce ss the control console through T elnet or Secure SHell (SSH), depending on which is enabled. Select the Administration tab, the Network option on the top menu bar , and then the access option under Console on the left navigation menu . By defa ult, T elnet is ena ...

  • APC ACRD101 - page 47

    39 InRow RD 10 kW Air Cooled Op eration and Maintenanc e Simple Network Manage ment Protocol (SNMP) SNMPv1 only . After you add the PowerNet ® MIB to a sta ndard SNMP MIB browser , you can u se that browser to access the Network Mana gement Card. All user names, passwords, and community names for SNMP are transferred over the network as plain text ...

  • APC ACRD101 - page 48

    InRow RD 10 kW Air Cooled Opera tion and Maintenan ce 40 Recover From a Lost Password Y ou can use a local computer (a computer that conn ects to the Network Mana gement Card through the serial port) to access the control console. 1. Select a serial port at the local computer, and disable any service that uses that port. 2. Connect the provided RS ...

  • APC ACRD101 - page 49

    41 InRow RD 10 kW Air Cooled Op eration and Maintenanc e Maintenance Monthly Preventive Maintenance Photocopy the follo wing pages and use them during the maintenance procedures. After they have been completed, save them for future reference. Prepared By: ________ ______________________ __ Model Number: ___ ____________________ _______ Serial Numbe ...

  • APC ACRD101 - page 50

    InRow RD 10 kW Air Cooled Opera tion and Maintenan ce 42 Mechanical Electrical Hazard: T u rn of f the cooling unit and disconne ct all power sources. Perform Lockout/T agout procedures before performing any electrical or mechanical service. W ear appropriate personal protective equipm ent when checking hazardous voltages.  Check the fans. All c ...

  • APC ACRD101 - page 51

    43 InRow RD 10 kW Air Cooled Op eration and Maintenanc e Quarterly Preventive Maintenance Perform all the Monthly Preventive Maintenance items and the items below . Prepared By: ________ ______________________ ___ Model Number: ___ ____________________ ________ Serial Number: ____________ ___________________ Date: _________ __________________ _____ ...

  • APC ACRD101 - page 52

    InRow RD 10 kW Air Cooled Opera tion and Maintenan ce 44 T roubleshooting Problem Possible Cause Corrective Action Controls erratic or inoperative • Inlet temperature to cooling unit is higher than rated maximum temper ature • Reduce the load or add additional cooling equipm ent. Fans fail to start • Power supplies are not operating properly ...

  • APC ACRD101 - page 53

    45 InRow RD 10 kW Air Cooled Op eration and Maintenanc e Cooling unit does not shut down on command • Drive voltage • V erify that there is a drive voltage entering the input of the cooling unit. Y ou m ay use the available +12 V or +24 V . Y ou must then also use the ground. • V erify Custom er Input Contact settings. See “Contacts” on p ...

  • APC ACRD101 - page 54

    ...

  • APC ACRD101 - page 55

    ...

  • APC ACRD101 - page 56

    11 / 2 0 0 9 990-3212A-00 1 APC W orldwide Customer Support Customer support for this or any other APC product is available at no char ge in any of the following ways: • V isit the APC W eb site to acce ss documents in the APC Knowledg e Base and to submit customer support requests. – www .apc.com (Corporate Headquarters) Connect to localized A ...

メーカー APC カテゴリー Fan

APC ACRD101のメーカーから受け取ることができるドキュメントは、いくつかのグループに分けられます。その一部は次の通りです:
- #BRANDの図面#
- ACRD101の取扱説明書
- APCの製品カード
- パンフレット
- またはAPC ACRD101の消費電力シール
それらは全部重要ですが、デバイス使用の観点から最も重要な情報は、APC ACRD101の取扱説明書に含まれています。

取扱説明書と呼ばれる文書のグループは、APC ACRD101の取り付け説明書、サービスマニュアル、簡易説明書、またはAPC ACRD101のユーザーマニュアル等、より具体的なカテゴリーに分類されます。ご必要に応じてドキュメントを検索しましょう。私たちのウェブサイトでは、APC ACRD101の製品を使用するにあたって最も人気のある説明書を閲覧できます。

関連する取扱説明書

APC ACRD101デバイスの取扱説明書はどのようなものですか?
取扱説明書は、ユーザーマニュアル又は単に「マニュアル」とも呼ばれ、ユーザーがAPC ACRD101を使用するのを助ける技術的文書のことです。説明書は通常、全てのAPC ACRD101ユーザーが容易に理解できる文章にて書かれており、その作成者はその分野の専門家です。

APCの取扱説明書には、基本的な要素が記載されているはずです。その一部は、カバー/タイトルページ、著作権ページ等、比較的重要度の低いものです。ですが、その他の部分には、ユーザーにとって重要な情報が記載されているはずです。

1. APC ACRD101の説明書の概要と使用方法。説明書にはまず、その閲覧方法に関する手引きが書かれているはずです。そこにははAPC ACRD101の目次に関する情報やよくある質問、最も一般的な問題に関する情報を見つけられるはずです。つまり、それらはユーザーが取扱説明書に最も期待する情報なのです。
2. 目次。APC ACRD101に関してこのドキュメントで見つけることができる全てのヒントの目次
3. APC ACRD101デバイスの基本機能を使うにあたってのヒント。 APC ACRD101のユーザーが使い始めるのを助けてくれるはずです。
4. トラブルシューティング。APC ACRD101に関する最も重要な問題を診断し、解決するために役立つ体系化された手続き
5. FAQ。よくある質問
6. 連絡先。一人では問題を解決できない場合に、その国におけるAPC ACRD101のメーカー/サービスへの連絡先に関する情報。

APC ACRD101についてご質問がありますか?

次のフォームを使用してください

見つけた説明書を読んでもAPC ACRD101の問題を解決できない場合、下記のフォームを使用して質問をしましょう。ユーザーのどなたかがAPC ACRD101で同様の問題を抱えていた場合、その解決方法を共有したいと考えるかもしれません。

画像のテキストを入力してください

コメント (0)