Manual Pelco IPS-RDPE-2

20 pages 1.3 mb
Download

Go to site of 20

Summary
  • Pelco IPS-RDPE-2 - page 1

    IPS-RDPE-2 Remote Data Port INSTALLATION/OPERATION C2473M-C (8/06) ...

  • Pelco IPS-RDPE-2 - page 2

    ...

  • Pelco IPS-RDPE-2 - page 3

    C2473M-C (8/06) 3 Contents Important Safe ty Instruct ions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ...

  • Pelco IPS-RDPE-2 - page 4

    4 C2473M-C (8/06) Important Safety Instructions Prior to installation an d use of this product, the following warnings shou ld be obser ved. 1. Installation and servicin g should be done only by qu alified service personnel and conform to all local codes. 2. Use only re placement parts r ecommended by Pelco . 3. Use stainless steel ha rdware to fas ...

  • Pelco IPS-RDPE-2 - page 5

    C2473M-C (8/06) 5 Description Pelco’ s IPS-RDPE-2 dat a port box is an on-sit e service too l designed f or Spectra III ™ SE, Spectra III, Esprit ® , and ExSit e ™ Series positioning systems. The d ata port b ox gives on -site acc ess for setu p and testi ng of the p ositioning system. The IPS-RDPE-2 can be used to locally view vide o and co ...

  • Pelco IPS-RDPE-2 - page 6

    6 C2473M-C (8/06) Mounting Instructions W ALL MOUNTING 1. Open the lid of the IPS-RDPE-2 box. Install two 3/4-inch (1.9 1 cm) conduit fittings (not supp lied). Close the lid of the IPS- RDPE-2 box. 2. Determin e the mounting lo cation for the IPS-RDP E-2. 3. Use the IPS- RDPE-2 box as a template and ma rk the four fastener positions on the mounting ...

  • Pelco IPS-RDPE-2 - page 7

    C2473M-C (8/06) 7 POLE MOUNTING 1. Install the P A402 mount adap ter . Refer t o the instruct ions supplie d with the ad apter . 2. Open the lid of the IPS-RDPE-2 box. Install two 3/4-inch (1.9 1 cm) conduit fittings (not supp lied). Close the lid of the IPS- RDPE-2 box. 3. Attach the IPS-RDPE -2 to the P A402, and secure with the hardware supplied ...

  • Pelco IPS-RDPE-2 - page 8

    8 C2473M-C (8/06) Cable/Wire Requirements and Connector Locations Refer to Figure 3 for a layou t of the data port box connector s. It is important to connec t all four communication wires from the IPS-RDPE-2 to the Spectra III dome system or ExSite system. It will not be possible to perform softwa re and lang uage file up loads if th e transmit an ...

  • Pelco IPS-RDPE-2 - page 9

    C2473M-C (8/06) 9 Wiring Diagrams The IPS-RDPE-2 is design ed to work in both coaxia l cable and un shi elded twisted pair (UTP) vide o transmis sion s ystems. Installa tion configurat ions include the fo llowing: • Coaxitron Controller with Co ax Video • Coaxitron Controller wit h UTP Vi deo (Passive Receiver Only) • RS-422 (D or P) Protocol ...

  • Pelco IPS-RDPE-2 - page 10

    10 C2473M-C (8/06) Figure 5. Coaxitron Controller with UTP Video – Passive Receiver Only NOTES: • Input po wer for the IPS-RDPE-2 is 24 VAC only . The max imum wire gau ge allowed fo r power inpu t and outp ut is 12 AWG. • The maximu m wire gauge allowed for U TP is 16 AWG. • Refer to the manual su pplied with t he position ing system for w ...

  • Pelco IPS-RDPE-2 - page 11

    C2473M-C (8/06) 11 Figure 6. RS-422 (D or P Protocol) Controller with Coax Video – Point-to-Point Configuration NOTES: • Input po wer for the IPS-RDPE-2 is 24 VAC only . The max imum wire gau ge allowed fo r power inpu t and outp ut is 12 AWG. • The maximum wire gaug e allowed for two-wire communication is 16 A WG. • Refer to the manual su ...

  • Pelco IPS-RDPE-2 - page 12

    12 C2473M-C (8/06) Figure 7. RS-422 (D or P Protocol) Controller with Coax Video – Home Run Configuration NOTES: • Input po wer for the IPS-RDPE-2 is 24 VAC only . The max imum wire gau ge allowed fo r power inpu t and outp ut is 12 AWG. • The maximum wire gaug e allowed for two-wire communication is 16 A WG. • Refer to the manual su pplied ...

  • Pelco IPS-RDPE-2 - page 13

    C2473M-C (8/06) 13 Figure 8. RS-422 (D or P Protocol) Controller with Coax Video – Daisy-Chain Configuration NOTES: • Input po wer for the IPS-RDPE-2 is 24 VAC only . The max imum wire gau ge allowed fo r power inpu t and outp ut is 12 AWG. • The maximum wire gaug e allowed for two-wire communication is 16 A WG. • Refer to the manual su ppl ...

  • Pelco IPS-RDPE-2 - page 14

    14 C2473M-C (8/06) Figure 9. RS-422 (D or P Protocol) Controller with UTP Video – Point-to-Point Configuration NOTES: • Input po wer for the IPS-RDPE-2 is 24 VAC only . The max imum wire gau ge allowed fo r power inpu t and outp ut is 12 AWG. • The maximu m wire gauge allowed for U TP is 16 AWG. • Refer to the manual supplied with the back ...

  • Pelco IPS-RDPE-2 - page 15

    C2473M-C (8/06) 15 Figure 10. RS-422 (D or P Protocol) Controller wit h UTP Video – Home Run Configuration NOTES: • Input po wer for the IPS-RDPE-2 is 24 VAC only . The max imum wire gau ge allowed fo r power inpu t and outp ut is 12 AWG. • The maximu m wire gauge allowed for U TP is 16 AWG. • Refer to the manual su pplied with t he positio ...

  • Pelco IPS-RDPE-2 - page 16

    16 C2473M-C (8/06) Figure 11. RS-422 (D or P Protocol) Controller wit h UTP Vid eo – Daisy-Chain Configuration NOTES: • Input po wer for the IPS-RDPE-2 is 24 VAC only . The max imum wire gau ge allowed fo r power inpu t and outp ut is 12 AWG. • The maximu m wire gauge allowed for U TP is 16 AWG. • Refer to the manual su pplied with t he pos ...

  • Pelco IPS-RDPE-2 - page 17

    C2473M-C (8/06) 17 Operation T o view video, control pan /tilt/zoom, or upload rev ised operat ing software a nd language files to a p ositioning s ystem, do the f ollowing: 1. Open th e door of t he IPS-RDPE-2. Opening the door will auto matically disconne ct the controller at the head-e nd and trigger an audible alert at the IPS-RD PE-2 site . NO ...

  • Pelco IPS-RDPE-2 - page 18

    18 C2473M-C (8/06) Specifications ELECTRICAL Input V oltage 24 V AC Power Consumpt ion 1 V A Does not inc lude power required fo r position ing system MECHANICAL Construction Aluminum Finish Gray polyester powder coat Cable Entry T wo hole plugs will accommodate 3/4-inch (1.91 cm) conduit fittin gs (not supplied) Mount Meth od Four 0.375- inch (0.9 ...

  • Pelco IPS-RDPE-2 - page 19

    The materials used in the manufacture of this docume nt and it s components are compliant to the requirements of Directive 2002/9 5/EC. This equipment contains elec trical or electronic components that must be recy cled properly to comply with Directive 2002/96/EC of the European Union regarding the disposal of waste electrica l and electronic equi ...

  • Pelco IPS-RDPE-2 - page 20

    W orldwide Headquarters 3500 Pelco W ay Clovis, California 93612 USA USA & Canada T el: 800/289-9100 Fax: 800/289-9150 International T el: 1-559/292-1981 Fax: 1-559/348-1120 www .pelco.com ISO 9001 United States | Canada | United Kingdom | The Netherlands | Singapore | Spain | Scandinavia | France | Middle East ...

Manufacturer Pelco Category Marine GPS System

Documents that we receive from a manufacturer of a Pelco IPS-RDPE-2 can be divided into several groups. They are, among others:
- Pelco technical drawings
- IPS-RDPE-2 manuals
- Pelco product data sheets
- information booklets
- or energy labels Pelco IPS-RDPE-2
All of them are important, but the most important information from the point of view of use of the device are in the user manual Pelco IPS-RDPE-2.

A group of documents referred to as user manuals is also divided into more specific types, such as: Installation manuals Pelco IPS-RDPE-2, service manual, brief instructions and user manuals Pelco IPS-RDPE-2. Depending on your needs, you should look for the document you need. In our website you can view the most popular manual of the product Pelco IPS-RDPE-2.

Similar manuals

A complete manual for the device Pelco IPS-RDPE-2, how should it look like?
A manual, also referred to as a user manual, or simply "instructions" is a technical document designed to assist in the use Pelco IPS-RDPE-2 by users. Manuals are usually written by a technical writer, but in a language understandable to all users of Pelco IPS-RDPE-2.

A complete Pelco manual, should contain several basic components. Some of them are less important, such as: cover / title page or copyright page. However, the remaining part should provide us with information that is important from the point of view of the user.

1. Preface and tips on how to use the manual Pelco IPS-RDPE-2 - At the beginning of each manual we should find clues about how to use the guidelines. It should include information about the location of the Contents of the Pelco IPS-RDPE-2, FAQ or common problems, i.e. places that are most often searched by users in each manual
2. Contents - index of all tips concerning the Pelco IPS-RDPE-2, that we can find in the current document
3. Tips how to use the basic functions of the device Pelco IPS-RDPE-2 - which should help us in our first steps of using Pelco IPS-RDPE-2
4. Troubleshooting - systematic sequence of activities that will help us diagnose and subsequently solve the most important problems with Pelco IPS-RDPE-2
5. FAQ - Frequently Asked Questions
6. Contact detailsInformation about where to look for contact to the manufacturer/service of Pelco IPS-RDPE-2 in a specific country, if it was not possible to solve the problem on our own.

Do you have a question concerning Pelco IPS-RDPE-2?

Use the form below

If you did not solve your problem by using a manual Pelco IPS-RDPE-2, ask a question using the form below. If a user had a similar problem with Pelco IPS-RDPE-2 it is likely that he will want to share the way to solve it.

Copy the text from the picture

Comments (0)