    EC/ECT Boilers Series Oil Installation, Operation & Maintenance Manual As an ENERGY ST AR ® Partner, PB Heat, LLC has determined that certain firing rates of this product meet the ENERGY ST AR ® guidelines for energy efficiency . ...

  • PB Heat ECT Series - page 2

    USING THIS MANUAL 1 A . INST ALLA TION CLEARANCE . . . . . . . . . . . . .1 B . SPECIAL A TTENTION BOXES . . . . . . . . . . . .1 1. PREINST ALLA TION 2 A . CLEARANCES . . . . . . . . . . . . . . . . . . . . . . . .2 B . AIR FOR COMBUSTION AND VENTILA TION . . . . . . . . . . . . . . . . . . . . . . . . .2 C. CHIMNEY / VENT AND DRAFT CONTROL . .3 D ...

  • PB Heat ECT Series - page 3

    1 A. INST ALLA TION CLEARANCE F ollow the installation instructions provided in this manual in the order shown. The order of these instructions has been set in order to provide the installer with a logical sequence of steps that will minimize potential interferences and maximize safety during boiler installation. B. SPECIAL A TTENTION BO XES Throug ...

  • PB Heat ECT Series - page 4

    2 A. CLEARANCES Unit may be installed on combustible flooring, provided the boiler is not set on carpet and a metal drip pan is placed under the appliance. Unit may be installed in a closet with the above clearances. See also Section B, Air for Combustion and V entilation. B. AIR FOR COMBUSTION AND VENTILA TION 1. Be certain adequate facilities are ...

  • PB Heat ECT Series - page 5

    3 C. CHIMNEY / VENT AND DRAFT CONTROL 1. Draft Requirement – Minimum draft r equired in the vent system is -.03" to -.05" W .C. depending on boiler model, see T able 7.1 (Section 7). This draft is necessary to provide the necessar y draft over fire of -.01" to -.02" W .C. See discussion in paragraph 5 below regarding draft. 2. ...

  • PB Heat ECT Series - page 6

    4 A. SETTING THE BOILER 1. Provide a level foundation, located as close as possible to the center of the heating system. 2. Refer to Figur e 2.2 for exploded view of boiler while checking and/or assembling parts of the boiler . 3. See clearance information in Section 1, "Pr einstallation." 4. On packaged boilers, open burner mounting plat ...

  • PB Heat ECT Series - page 7

    5 BOILER PLA CEMENT AND ASSEMBL Y Figure 2.2: Boiler Exploded View (See T able 8.1 in Section 8 for parts identification). ...

  • PB Heat ECT Series - page 8

    6 A. PRESSURE TEST BLOCK ASSEMBL Y 1. Make up cold water supply connection to the boiler . 2. Install pressur e gauge or pressure-temperatur e gauge in tapping provided. See Boiler Dimensional drawing, Figur e 7.1 (Section 7). 3. Plug all open tappings in the boiler and fill with water . Apply appro ximately thirty (30) psig pressure. Check to make ...

  • PB Heat ECT Series - page 9

    7 D . WA TER BOILER PIPING 1. Refer to the W ater Installation Sur vey and Hydronics Institute Residential Hydronic Heating Installation/Design Guide for Guidance. 2. The supply and return connections should be sized to suit the system. 3. Pipe the supply and r etur n in one of two ways as shown in Figur e 3.3: a. P ipe the supply from the top of t ...

  • PB Heat ECT Series - page 10

    8 E. T ANKLESS HEA TER OR COVERPLA TE 1. If a tankless coil is used (item 13 or 17), install as pictured. On water boilers, install in opening in front section. On steam boilers, install in opening in rear section. F or suggested piping of tankless water heaters refer to F igures 3.6 and 3.7. 2. If not using a tankless coil, cover the heater openin ...

  • PB Heat ECT Series - page 11

    9 F . CONTROLS 1. W ater Boiler Controls: Install the limit / operating control, pressur e- temperature gauge and safety r elief valve. See Figure 7.1 (Section 7) for proper location. F or installations subject to UL726, a second operating control that senses water temperature is also r equired (not provided). Use an L4080B or equivalent. Install i ...

  • PB Heat ECT Series - page 12

    10 A. GENERAL All electrical wiring shall be done in accordance with the National Electrical Code and Local Requirements. Single pole switches including those of safety controls or protective devices shall not be wired in a grounded line. B. BURNER WIRING 1. See Section 5 for mounting burner . 2 Install junction box, limit harness, and Heyco bushin ...

  • PB Heat ECT Series - page 13

    11 Figure 4.3: Steam Boiler with Probe Low W ater Cut - Off Figure 4.2: Steam Boiler with Float Low Water Cut - Off ELECTRICAL ...

  • PB Heat ECT Series - page 14

    12 ELECTRICAL Figure 4.5: Zoning with Circulators Figure 4.4: Water Boilers ...

  • PB Heat ECT Series - page 15

    13 ELECTRICAL Figure 4.6: Zoning with Zone V alves Figure 4.7: Partner with Circulator ...

  • PB Heat ECT Series - page 16

    14 BURNER SETUP & BOILER OPERA TION A. BURNER INST ALLA TION 1. The oil burner is supplied with a mounting flange fixed in position. 2. Mount the burner to the Bur ner Mounting Plate (item 3) with four (4) 5/16" studs and nuts provided. 3. Care must be taken when routing the oil lines so not to interfere with the opening and closing of the ...

  • PB Heat ECT Series - page 17

    15 BURNER SETUP & BOILER OPERA TION E. CLEAN THE BOILER (STEAM BOILERS ONL Y) 1. Clean the boiler within one week after initial start-up. Cleaning will be more effective if boiler operates a day or two to loosen sediment and impurities in system. 2. Boiler must be cleaned to remove any accumulation of oil, grease, sludge, etc. in the system. Th ...

  • PB Heat ECT Series - page 18

    16 BURNER SETUP & BOILER OPERA TION C ARLIN BURNER SPECIFIC A TIONS Boiler Model No . Firing Rate Burner Model No . Air Shutter Nozzle Size Pum p Pressure Start-up Settings Air Band Head Bar EC/ECT -03-075 .75 EZ-1HP Blank 0.60 70° B DEL³ 150 psig 0.55 0.60 - 0.65 EC/ECT -03-100 1.00 EZ-1HP Blank 0.85 70° A DEL 150 psig 0.65 0.85 - 1.00 EC/E ...

  • PB Heat ECT Series - page 19

    17 MAINTENANCE 6. MAINTENANCE W ARNING Product Saf ety Inf ormation Refractory Ceramic Fiber Product This appliance contains materials made from refractory ceramic fiber s (RCF). Airborne RCF , when inhaled, have been classified b y the International Ag ency f or Research on Cancer (IARC), as a possible carcinogen to humans. After the RCF materials ...

  • PB Heat ECT Series - page 20

    18 MAINTENANCE A. GENERAL 1. Check pipes adjacent to cold walls or in unheated spaces. Insulate and tape them if necessary to be sure they can't fr eeze up. Keeping the water moving at all times will reduce the likelihood of fr eezing. 2. If there is considerable for eign matter in the boiler water , the boiler should be shut down and allowed ...

  • PB Heat ECT Series - page 21

    19 MAINTENANCE 3. Remove any scale or soot from the combustion chamber area by vacuum cleaning or any other available means. 4. Replace flue collector and close burner mounting plate, making sure all gaskets ar e in place. 5. Replace jacket top panel. 6. Inspect venting system. G . IF A LONG SHUTDOWN IS REQUIRED 1. T o take boiler out of service if ...

  • PB Heat ECT Series - page 22

    20 BOILER DIMENSIONS & RA TINGS 7. BOILER DIMENSIONS & RA TINGS T APPING L OC A TIONS Location Size NPT W ater Steam H 3/4" N/A Low Limit Control I 3/4" Limit Control Pr essure Gauge L 1/4" T emperature- Pressur e Gauge Limit Control M 1/2" N/A Gauge Glass and Low W ater Cut-Off N 2" Optional Return Return O 3/4&quo ...

  • PB Heat ECT Series - page 23

    21 BOILER DIMENSIONS & RA TINGS T able 7.1: Boiler Ratings ✸ As an ENERG Y ST AR ® Partner , PB Heat has determined that these firing rates meet the ENERGY ST AR guidelines for energy efficiency . ✝ All chimneys are 8" x 8" x 20' e xcept those models denoted with ( ✝ ), which are 8" x 12" x 20'. 1 Burner inp ...

  • PB Heat ECT Series - page 24

    22 R E PA I R PA R T S 8. REP AIR P ARTS Repair par ts are available from your installer or by contacting PB Heat, LLC, 131 S. Church, Bally , P A 19503. Note: Remember to include boiler model number and serial number when ordering par ts. T able 8.1 Item No .* Description Repair P art Stock Code EC/ECT -03 EC/ECT -04 EC/ECT -05 EC/ECT -06 1 Block ...

  • PB Heat ECT Series - page 25

    23 NOTES ...

  • PB Heat ECT Series - page 26

    24 NOTES ...

  • PB Heat ECT Series - page 27

    EC/ECT Boilers Series Oil Installation, Operation & Maintenance Manual TO THE INST ALLER: This manual is the property of the owner and must be affixed near the boiler for future reference. TO THE OWNER: This boiler should be inspected annually by a Qualified Service Agency. EC8000 R24 (2/08-5M) Pri nte d i n U.S.A . ©2008 Name: Address: Phone: ...

Produzent PB Heat Kategorie Boiler

Dokumente, die wir vom Produzenten des Geräts PB Heat ECT Series erhalten, können wir in mehrere Gruppen teilen. Unteranderem in:
- technische Zeichnungen PB Heat
- Bedienungsanleitungen ECT Series
- Produktkarten PB Heat
- Informationsbroschüren
- oder Energieetiketten PB Heat ECT Series
Jede von ihnen ist wichtig, jedoch finden wir die wichtigsten Informationen für den Nutzer des Geräts in der Bedienungsanleitung PB Heat ECT Series.

Die Dokumentengruppe, die als Bedienungsanleitungen bezeichnet wird, wird ebenfalls in detaillierte Arten geteilt, solche wie: Montageanleitungen PB Heat ECT Series, Wartungsanleitungen, Kurzanleitungen oder Benutzeranleitungen PB Heat ECT Series. Abhängig vom Bedarf, sollten Sie das Dokument finden, das Sie brauchen. In unserem Service können Sie sich die populärste Bedienungsanleitung des Produkts PB Heat ECT Series ansehen.

Ähnliche Bedienungsanleitungen

Die komplette Bedienungsanleitung des Geräts PB Heat ECT Series, wie sollte sie aussehen?
Die Bedienungsanleitung, auch bezeichnet als Benutzerhandbuch, oder einfach nur „Anleitung”, ist ein technisches Dokument, das dem Benutzer bei der Nutzung von PB Heat ECT Series hilfreich sein soll. Die Bedienungsanleitungen werden in der Regel von technischen Schriftstellern geschrieben, aber in einer Sprache, die für alle Nutzer von PB Heat ECT Series verständlich ist.

Eine gänzliche Bedienungsanleitung von PB Heat sollte einige Grundelemente enthalten. Ein Teil von ihnen ist nicht so wichtig, wie z.B.: die Titelseite oder Autorenseiten. Die restlichen von ihnen jedoch, sollten Informationen liefern, die für den Nutzer von enormer Wichtigkeit sind.

1. Einführung und Hinweise, wie man sich in einer Bedienungsanleitung von PB Heat ECT Series bewegt - Am Anfang jeder Bedienungsanleitung sollten wir Hinweise bezüglich der Nutzungsart eines bestimmten Ratgebers finden. In ihr sollten sich Informationen über die Lokalisierung des Inhaltsverzeichnisses von PB Heat ECT Series befinden, FAQ oder über oft auftretende Probleme – also Stellen, die von den Benutzern in jeder Bedienungsanleitung am meisten gesucht werden
2. Inhaltsverzeichnis - Index aller Ratschläge bezüglich PB Heat ECT Series, die wir im aktuellen Dokument finden
3. Ratschläge zur Nutzung der Grundfunktionen des Geräts PB Heat ECT Series - die uns die ersten Schritte während der Nutzung von PB Heat ECT Series erleichtern sollten
4. Troubleshooting - geordneter Tätigkeitslauf, der uns bei der Diagnose und als nächstes bei der Lösung wichtiger Probleme mit PB Heat ECT Series hilft
5. FAQ - häufig gestellte Fragen
6. Kontaktdaten Informationen darüber, wo man Kontakt zum Produzenten / Service von PB Heat ECT Series im bestimmten Land suchen kann, wenn es nicht gelingt, das Problem selbst zu lösen.

Haben Sie eine Frage bezüglich PB Heat ECT Series?

Nutzen Sie das untere Formular

Wenn Sie mit Hilfe der gefundenen Bedienungsanleitung Ihr Problem mit PB Heat ECT Series nicht gelöst haben, stellen Sie eine Frage, indem Sie das untere Formular nutzen. Wenn einer der Nutzer ein ähnliches Problem mit PB Heat ECT Series hatte, ist es möglich, dass er mit Ihnen die Lösung teilen möchte.

Text vom Bild übertragen

Kommentare (0)