Bedienungsanleitung Enviro 1200-V Insert

32 Seiten 3.16 mb
Download

Zur Seite of 32

Summary
  • Enviro 1200-V Insert - page 1

    SHERWOOD INDUSTRIES IS AN ENVIRONMENT ALL Y RESPONSIBLE COMP ANY . THIS MANUAL IS PRINTED ON RECYCLED P APER. BY: SHERWOOD INDUSTRIES LTD O WNER ’S MANU AL PLEA SE KEEP THESE INSTRUCTIONS FOR FUTURE REFERENCE V e n i c e W o o d S t o v e Models: 1200-V & 1700-V Insert Tested & Listed By Beaverton Oregon USA OMNI-Test Laboratories, Inc, C ...

  • Enviro 1200-V Insert - page 2

    T able of Contents 2 Safety Precautions..........................................................................................3 Operating Instructions.....................................................................................4 Building Y our Fire.................................................................................5 How It W ...

  • Enviro 1200-V Insert - page 3

    3 Safety Prec autions FOR SAFE INST ALLA TION AND OPERA TION OF Y OUR “ENVIRO” WOOD ST O VE, PLEASE CAREFULL Y READ THE FOLL OWING INFORMA TION: ● Please read this entire manual before you install and use your new woodstove. Failure to follow instructions may result in property damage, bodily injury or even death. Be aware that local Codes an ...

  • Enviro 1200-V Insert - page 4

    Oper a ting Instructions FIRST START When rst installed, the chimney , rebricks and steel are cold and it usually takes sever al hours on a fairly high burn f or them to become hot and dry enough f or the sto ve to function well. W e recommend during the unit ’ s rst burn that a door and window are opened to vent the smoke and fumes crea ...

  • Enviro 1200-V Insert - page 5

    CREOSOTE - ITS FORMATION AND REMOVAL: When wood is burned slowly , it may produce tar and other vapors that, combined wi th moisture, form creosote. These vapors condense in the relatively cooler chimney ue of a slow burning re and, if ignited, make an extremely hot re. Therefore, the smoke pipe and chimney should be inspected bi- weekly d ...

  • Enviro 1200-V Insert - page 6

    6 Oper a ting Instructions d) Regulate the heat output of the stove by adjusting the air controls to allow a larger re and vice versa. A short period of experimentation with the control settings will allow you to regulate the heat output to keep your home comf ortable. Do not use a grate or elevate the re. Build wood re on the stove reb ...

  • Enviro 1200-V Insert - page 7

    7 Oper a ting Instructions g) Once the kindling has started to burn, add some smaller pieces of seasoned, dry rewood. Note: Adding large pieces at the early stages will only serve to smother the re. Continue adding small pieces of seasoned dry rewood, keeping the door slightly open until each piece starts to ignite. Remember to always open ...

  • Enviro 1200-V Insert - page 8

    8 Oper a ting Instructions 7. What is draft? Draft is the ability of the chimney to exhaust or dr aw smoke produced during the normal combustion process. T oo much draft may cause excessive temperatures in the appliance and may damage the appliance. Inadequate draft may cause backpufng or “plugging” of the chimney . There is a certain amount ...

  • Enviro 1200-V Insert - page 9

    9 Oper a ting Instructions H OW I T W ORKS : Exhaust Smoke 1 / 2 " Ceramic baffle; reflects heat down to burn the particles in the smoke. Secondary air tubes; creates a second burn on the particles in the smoke for a more efficient & cleaner burn. Convection Heat Radiant Heat Primary air; window air wash (cooler air to keep the glass clean ...

  • Enviro 1200-V Insert - page 10

    S PECIFICATIONS : Table 1: 1200-V & 1700-V General Information. Model 1200 Insert 1700 Insert Width x Depth 27” x 21” (705 mm x 546 mm) 27” x 26” (705 mm x 660 mm) Height of body 19 1 / 16 ” (484 mm) or 19 9 / 16 ” (497 mm) Fire box size (depth x width x height) 16.1” x 18.25” x 11.15” (409 mm x 464 mm x 283 mm) 20.65 ...

  • Enviro 1200-V Insert - page 11

    11 Specific a tions C LEARANCES T O C OMBUSTIBLES - 1200-V I NSERT : A Minimum clearance to an unshielded side w all 10” (254 mm) B Minimum clearance to an unshielded 8” (203 mm) mantel 21” (533 mm) C Minimum top f acing (protruding ” [19 mm]) clearance 17” (445 mm) D Minimum side facing (protruding ” [19 mm]) clearance 1” (2 ...

  • Enviro 1200-V Insert - page 12

    12 Specific a tions C LEARANCES T O C OMBUSTIBLES - 1700-V I NSERT : A Minimum clearance to an unshielded side w all 10” (254 mm) B Minimum clear ance to an unshielded 8” (203 mm) mantel 24” (610 mm) C Minimum top facing (protruding ” [19 mm]) clearance 19” (495 mm) D Minimum side f acing (protruding ” [19 mm]) clearance 1” ( ...

  • Enviro 1200-V Insert - page 13

    13 Specific a tions D IMENSIONS - 1200-V I NSERT : 34 13 / 16 " (885mm) 19 1 / 16 " (484mm) or 19 9 / 16 " (497mm) 22 5 / 16 " (566mm) 26 15 / 16 " (684mm) 20 7 / 8 " (530mm) 47 3 / 8 " (1203mm) 20 7 / 8 " (529mm) 21 9 / 16 " (548mm) 5" (127mm) 13 5 / 16 " (338mm) 20 1 / 16 " (509mm) 21 15 ...

  • Enviro 1200-V Insert - page 14

    Specific a tions D IMENSIONS - 1700-V I NSERT : 34 13 / 16 " (885mm) 19 1 / 16 " (484mm) or 19 9 / 16 " (497mm) 22 5 / 16 " (566mm) 26 15 / 16 " (684mm) 20 7 / 8 " (530mm) 47 3 / 8 " (1203mm) 20 7 / 8 " (529mm) 26 1 / 8 " (663mm) 5" (127mm) 17 7 / 16 " (453mm) 24 9 / 16 " (624mm) 26 1 / 2 ...

  • Enviro 1200-V Insert - page 15

    Inst alla tion Please read and understand these instructions before installing pedestal or ash pan and leg option. F ailure to follow these instructions carefully could cause personal injury or property damage. All screws are pre-installed on the base of the unit. R EMOVAL F ROM P ALLET : • Remo ve the bricks from the unit bef ore starting. • R ...

  • Enviro 1200-V Insert - page 16

    Inst alla tion M ASONRY F IREPLACE I NSTALLATION : Unless you are experienced, we recommend installation by your dealer or a professional installer. Install only in a masonry replace with a good-condition chimney at least 15 ft (4 .6 m) high, both of which ha ve been constructed in accordance with the building code. Refer to T ables 4 and 7 for ...

  • Enviro 1200-V Insert - page 17

    17 The ue collar is removable for installations into replaces with low openings . a) Remov e the rear two (2) secondary air tube and C-Cast Cer amic Bafes, if installed (see C-C AST C ERAMIC B AFFLE I NSTALLATION ) . Remove the secondary air tubes by placing a screwdriver (any style except at head) into one of the air holes and tapping ...

  • Enviro 1200-V Insert - page 18

    Inst alla tion Leveling Legs Figure 14: Removable ue collar in place. Figure 15: Leveling legs. S URROUND P ANEL S EALED I NSTALLATION F OR USA O NLY : Note: Though this is an allowable installation, we do not r ecommend it because of the possibilit y of poor draft, and theref ore poor stov e performance. Before starting this type of installatio ...

  • Enviro 1200-V Insert - page 19

    19 Inst alla tion I NSTALLATION U SING A B LOCK -O FF P LATE F OR USA O NLY : If this unit is to be instal led into a masonry replace or a zero-clear ance replace with a direct connection you must install a non-combustible seal-off device such as a block -off plate or damper adapter . By installing a block -off plate you seal the chimney , en ...

  • Enviro 1200-V Insert - page 20

    Inst alla tion 5. Mount the block -off plate using masonry scr ews in a masonry replace and sheet metal screws on a zero- clearance replace (screws need only be long enough to penetrate the rst layer of metal). 6. Insulate the block -off plate using high - temperature berglass insulation and furnace cement. Masonry Fireplace Mantel Damp ...

  • Enviro 1200-V Insert - page 21

    21 Inst alla tion M ODEL 1200-V B RICK P LACEMENT & T UBE L OCATIONS : COMPLETE THE STOVE AND SMOKE PIPE INSTALLATION BEFORE PLACING THESE BRICKS. When replacing bricks, use only pumas type re bricks. TOTAL BRICKS: 12 - Full size bricks 9” long x 4 .5” wide x 1.25” thick (22.9 cm long x 11.4 cm wide x 3.2 cm thick) 2 - P artial bricks ...

  • Enviro 1200-V Insert - page 22

    22 Inst alla tion M ODEL 1700-V B RICK P LACEMENT & T UBE L OCATIONS : COMPLETE THE STOVE AND SMOKE PIPE INSTALLATION BEFORE PLACING THESE BRICKS. When replacing bricks, use only pumas type re bricks. TOTAL BRICKS: 16 - Full size bricks 9” long x 4 .5” wide x 1.25” thick (22.9 cm long x 11.4 cm wide x 3.2 cm thick) 2 - P artial bricks ...

  • Enviro 1200-V Insert - page 23

    23 C-C AST C ERAMIC B AFFLE I NSTALLATION : 1. Slide the right C -Cast Ceramic Bafe in o ver the secondary air tubes at the top of the rebox. The tab must be on the top and pointing towards the center and the smooth side is to f ace down. Left Ceramic Baffle Right Ceramic Baffle Figure 23: Installation of C-Cast Ceramic Bafe. Inst alla tio ...

  • Enviro 1200-V Insert - page 24

    24 Fan White Black Black Black Fan temperature sensor Black Fan controller Power Supply Black Black Rocker Switch Manual Auto Off Black Inst alla tion Figure 24: Fireplace Insert Fan Kit Wiring Diagram. The Insert comes with the fan assembled installed in the left shroud. 1) Disconnect all electrical connections for the fan kit. 2) Remov e the four ...

  • Enviro 1200-V Insert - page 25

    Inst alla tion R EMOVAL O F F ACE : 1. Remove the cast top from the unit (lift up and forwar d) 2. Lift up and forward on the unit f ace, the entire face and surround panel will come away f rom the unit. Figure 26: Removal of Face. 25 Figure 27: Installation of Panel. I NSTALLATION O F T HE S URROUND P ANEL : 1. Loosen (but do not remov e) the four ...

  • Enviro 1200-V Insert - page 26

    R a ting L abel 26 **Alcove (Use double wall pipe) / Alcôve (Utilisant le double connecteur de mur) I Total width / Largeur totale 55” (1397 mm) Model/Modèle 1200 J Total height / Hauteur totale 78” (1981 mm) K Top of stove to ceiling / Le sommet de poêle au plafond 49” (1245 mm) L Sidewall to unit / De la paroi latérale au dispositif Sid ...

  • Enviro 1200-V Insert - page 27

    P ar ts List Reference # Description Part # 1 120F (49C) Ceramic F an T emperature Sensor EC -001 2 Insert Burner Switch EC -026 3 FPI F an Controller 115V EC -039 4 Domestic Power Cor d 115V EC -042 5 Heyco Str ain Relief EC -044 6 W ood Door Gask et EF-168 7 Glass with T ape 10-000 8 Enviro Logo Gel Decal 50-322 9 1200 & 1700 Front Secondary ...

  • Enviro 1200-V Insert - page 28

    28 P ar ts Diagr am 10 11 13 12 4 25 5 3 2 1 17 7 18 23 21 29 26 22 6 32 33 16 31 34 28 30 27 8 19 20 9 9 ITEM NO. Part # DESCRIPTION 2. 1200-V Options & Parts/QTY. 1 10-000 Glass with Tape 1 2 50-1099 1200 & 1700 Front Secondary Air Tube A 2 14 15 24 ...

  • Enviro 1200-V Insert - page 29

    29 W arr anty Sherwood Industries Ltd. is the manufacturer of the Enviro line of heating products. At Sherwood Industries, our commitment to the highest level of quality and customer service is the most important thing we do. Each Enviro stove is built on a tradition of using only the nest materials and is backed by our Exclusive Lifetime Limite ...

  • Enviro 1200-V Insert - page 30

    W arr anty 6. If the problem is not covered by the Limited Warr anty , the customer will be responsible for all repair costs, as well as all storage, shipping and the cost of remo ving and re-installing the stov e. If you are not satised with the service provided by the Enviro dealer , write to Sherwood Industries Ltd. at the address listed on t ...

  • Enviro 1200-V Insert - page 31

    31 W arr anty negligence, misuse, improper installation, alter ation or adjustment of the manuf acturer’ s settings of components, lack of proper and regular maintenance, alter ation, or act of God. 14. The Limited Warr anty does not cover damage caused to the stove while in tr ansit. If this occurs, do not operate the stove and contact your cour ...

  • Enviro 1200-V Insert - page 32

    32 Inst alla tion Da t a Sheet The following information must be recorded by the installer f or warr anty purposes and f uture ref erence. NAME OF OWNER: _________________________________________ ADDRESS: _________________________________________ _________________________________________ _________________________________________ PHONE:_____________ ...

Produzent Enviro Kategorie Stove

Dokumente, die wir vom Produzenten des Geräts Enviro 1200-V Insert erhalten, können wir in mehrere Gruppen teilen. Unteranderem in:
- technische Zeichnungen Enviro
- Bedienungsanleitungen 1200-V Insert
- Produktkarten Enviro
- Informationsbroschüren
- oder Energieetiketten Enviro 1200-V Insert
Jede von ihnen ist wichtig, jedoch finden wir die wichtigsten Informationen für den Nutzer des Geräts in der Bedienungsanleitung Enviro 1200-V Insert.

Die Dokumentengruppe, die als Bedienungsanleitungen bezeichnet wird, wird ebenfalls in detaillierte Arten geteilt, solche wie: Montageanleitungen Enviro 1200-V Insert, Wartungsanleitungen, Kurzanleitungen oder Benutzeranleitungen Enviro 1200-V Insert. Abhängig vom Bedarf, sollten Sie das Dokument finden, das Sie brauchen. In unserem Service können Sie sich die populärste Bedienungsanleitung des Produkts Enviro 1200-V Insert ansehen.

Ähnliche Bedienungsanleitungen

Die komplette Bedienungsanleitung des Geräts Enviro 1200-V Insert, wie sollte sie aussehen?
Die Bedienungsanleitung, auch bezeichnet als Benutzerhandbuch, oder einfach nur „Anleitung”, ist ein technisches Dokument, das dem Benutzer bei der Nutzung von Enviro 1200-V Insert hilfreich sein soll. Die Bedienungsanleitungen werden in der Regel von technischen Schriftstellern geschrieben, aber in einer Sprache, die für alle Nutzer von Enviro 1200-V Insert verständlich ist.

Eine gänzliche Bedienungsanleitung von Enviro sollte einige Grundelemente enthalten. Ein Teil von ihnen ist nicht so wichtig, wie z.B.: die Titelseite oder Autorenseiten. Die restlichen von ihnen jedoch, sollten Informationen liefern, die für den Nutzer von enormer Wichtigkeit sind.

1. Einführung und Hinweise, wie man sich in einer Bedienungsanleitung von Enviro 1200-V Insert bewegt - Am Anfang jeder Bedienungsanleitung sollten wir Hinweise bezüglich der Nutzungsart eines bestimmten Ratgebers finden. In ihr sollten sich Informationen über die Lokalisierung des Inhaltsverzeichnisses von Enviro 1200-V Insert befinden, FAQ oder über oft auftretende Probleme – also Stellen, die von den Benutzern in jeder Bedienungsanleitung am meisten gesucht werden
2. Inhaltsverzeichnis - Index aller Ratschläge bezüglich Enviro 1200-V Insert, die wir im aktuellen Dokument finden
3. Ratschläge zur Nutzung der Grundfunktionen des Geräts Enviro 1200-V Insert - die uns die ersten Schritte während der Nutzung von Enviro 1200-V Insert erleichtern sollten
4. Troubleshooting - geordneter Tätigkeitslauf, der uns bei der Diagnose und als nächstes bei der Lösung wichtiger Probleme mit Enviro 1200-V Insert hilft
5. FAQ - häufig gestellte Fragen
6. Kontaktdaten Informationen darüber, wo man Kontakt zum Produzenten / Service von Enviro 1200-V Insert im bestimmten Land suchen kann, wenn es nicht gelingt, das Problem selbst zu lösen.

Haben Sie eine Frage bezüglich Enviro 1200-V Insert?

Nutzen Sie das untere Formular

Wenn Sie mit Hilfe der gefundenen Bedienungsanleitung Ihr Problem mit Enviro 1200-V Insert nicht gelöst haben, stellen Sie eine Frage, indem Sie das untere Formular nutzen. Wenn einer der Nutzer ein ähnliches Problem mit Enviro 1200-V Insert hatte, ist es möglich, dass er mit Ihnen die Lösung teilen möchte.

Text vom Bild übertragen

Kommentare (0)