Bedienungsanleitung Trane CCAF

40 Seiten 1.52 mb
Download

Zur Seite of 40

Summary
  • Trane CCAF - page 1

    Scroll Liquid Chillers Model CGWF and CCAF 20 to 60 T ons (60 Hz) 17 to 50 T ons (50 Hz) W ater -Cooled and Condenserless CG-PRC012-EN January 2004 Built For the Industrial and Commercial Markets ...

  • Trane CCAF - page 2

    CG-PRC012-EN © 2004 American Standard Inc. All rights reserved. Introduction More Than Just Another “Improved” Chiller — Advanced Design — Better Reliability — Superior Efficiency — New CH530 Controls — Better A vailability — Easier T o Install and Operate The T rane 20-60 T on Scroll Liquid Chiller Design The T rane scroll compres ...

  • Trane CCAF - page 3

    3 CG-PRC012-EN Contents Introduction Features and Benefits W orld Class Efficiency and Reliability Options Controls Application Considerations Model Number General Data Selection Procedure Performance Data Full Load Performance Part Load Performance Adjustment Factors Pressure Drops Electrical Data and Connections T ypical Wiring Diagram Field Layo ...

  • Trane CCAF - page 4

    CG-PRC012-EN 4 The standard ARI rating condition (54/44°F and 85°F/3.0 gpm per ton) and IPL V are ARI certified. All other ratings, including the following, are outside the scope of the certification program and are excluded: • Glycol. • 50 Hz. • Condenserless models CCAF . W ater Chiller Systems Business Unit Features and Benefits Packed S ...

  • Trane CCAF - page 5

    5 CG-PRC012-EN Leading in Efficiency and Reliability with State-Of-The-Art Scroll Compressor T echnology Efficiency The energy efficiency of the scroll chiller results in energy costs lower than any other comparable chiller . Full load efficiencies are improved beyond reciprocating chillers, but part load efficiencies are simply unmatched by any ot ...

  • Trane CCAF - page 6

    CG-PRC012-EN 6 T rane Scroll Compressor — Maximum Efficiency with Enhanced Reliability General The scroll compressor has two scrolls. The top scroll is fixed and the bottom scroll orbits. Each scroll has walls in a spiral shape that intermesh. Inlet-First Orbit As the bottom scroll orbits, two refrigerant gas pockets are formed and enclosed. Comp ...

  • Trane CCAF - page 7

    7 CG-PRC012-EN Options Hot Gas Bypass: Hot gas bypass option allows unit operation below the minimum step of unit unloading. The regulator valve, along with all associated refrigerant piping and electrical wiring, are factory installed and tested on one refrigeration circuit. Unit does not start in hot gas bypass mode. If the unit operates in bypas ...

  • Trane CCAF - page 8

    CG-PRC012-EN 8 Controls Human Interfaces The T rane water-cooled 20-60 ton scroll CGWF chiller offers an easy-to-use operator interface panel, the DynaView . DynaView is an LCD touchscreen display that is navigated by file tabs. This is an advanced interface that allows the user to access any important information concerning setpoints, active tempe ...

  • Trane CCAF - page 9

    9 CG-PRC012-EN Controls Easy Interface to A Generic Building Management System Controlling the scroll CGWF chiller with building management systems is state- of-the-art, yet simple with either the LonT alk Communications Interface for Chillers (LCI-C) or Generic Building Management System Hardwire Points. Simple Interface with Other Control Systems ...

  • Trane CCAF - page 10

    CG-PRC012-EN 10 Controls T racer Summit controls — Interface With The T rane Integrated Comfor t System (ICS) T rane Chiller Plant Control The T racer Summit Chiller Plant Building Management System with Chiller Plant Control provides building automation and energy management functions through stand-alone control. The Chiller Plant Control is cap ...

  • Trane CCAF - page 11

    11 CG-PRC012-EN Controls Keeping Operators Informed A crucial part of efficiently running a chiller plant is assuring that the operations staff is instantly aware of what is happening in the plant. Graphics showing schematics of chillers, piping, pumps, and towers clearly depict the chiller plant system, enabling building operators to easily monito ...

  • Trane CCAF - page 12

    CG-PRC012-EN 12 Unit Location Units should be installed indoors where exposure to rain or water splash is minimal. A level foundation or flooring must be provided which will support at least 150 percent of the operating weight of the unit. The chiller foundation must be rigid to reduce vibration transmission to a minimum. Use of vibration isolators ...

  • Trane CCAF - page 13

    13 CG-PRC012-EN Model Number Description Digits 01, 02, 03, – Chiller series CGWF = W ater cooled scroll chiller CCAF = Scroll compressor chiller (condenserless) Digits 04, – Development sequence Digits 05, 06, 07 – Unit nominal tonnage 020 = 20 Nominal tons 025 = 25 Nominal tons 030 = 30 Nominal tons 040 = 40 Nominal tons 050 = 50 Nominal to ...

  • Trane CCAF - page 14

    CG-PRC012-EN 14 T able GD-1. General data — CGWF water-cooled chiller Size 20 25 30 40 50 60 Compressor Quantity (1) 2 2 2 2/2 2/2 2/2 Nominal Size (tons) (2) 10/10 10/1 5 15/15 10-10/10 -10 10 -15/10- 15 15-15 /15-15 Steps of Unloading (% ) 100,50 100,60 100,50 100,75,50,25 100,80,60,30 100,75,50,25 Evaporator W ater Storage (gall ons) 12 11 16 ...

  • Trane CCAF - page 15

    15 CG-PRC012-EN Selection Procedures The chiller capacity tables on the following pages cover the most frequently encountered leaving water temperatures. For temperature drops other than 10°F [5.6°C], refer to T able SP-1, Performance Adjustment Factors, shown below . Additional chiller selections and performance information can be obtained throu ...

  • Trane CCAF - page 16

    CG-PRC012-EN 16 T able PD-1. 60 Hz CGWF performance data in English units Evapo rator Enter ing Condenser Water T emperature (F) Leaving Water Unit 75 80 85 90 95 T emperature (F) Size T ons kW E ER T ons kW E ER T ons kW E ER T ons kW EE R T ons kW EER 20 19.2 13.8 16.7 19.0 14.5 15.7 18.6 15.4 14.6 18.1 16.1 13.5 17.7 17.1 12.4 25 23.8 17.2 16.5 ...

  • Trane CCAF - page 17

    17 CG-PRC012-EN T able PD-2. 60 Hz CGWF performance data in Metric units Evapo rator Entering Condenser Water T emperature (C) Leaving Water Unit 25 30 35 T emperature (C) Size kWo kWi COP kWo k Wi C OP kW o k Wi COP 20 70.4 14.2 5.0 67.7 15.5 4.4 64.7 17.1 3.8 25 87.1 17.7 4.9 83.5 19.4 4.3 79.8 21.8 3.7 6 30 104.0 21.2 4.9 99.6 23.2 4.3 95.1 25.6 ...

  • Trane CCAF - page 18

    CG-PRC012-EN 18 T able PD-3. 50 Hz CGWF performance data in English units Evapo rator Enter ing Condenser Water T emperature (F) Leaving Wate Unit 75 80 85 90 95 T emperature (F) Size T ons kW E ER T ons kW E ER T ons kW E ER T ons kW EE R T ons kW EER 20 19.2 13.8 16.7 19.0 14.5 15.7 18.6 15.4 14.6 18.1 16.1 13.5 17.7 17.1 12.4 20 16.8 11.1 18.1 1 ...

  • Trane CCAF - page 19

    19 CG-PRC012-EN T able PD-4. 50 Hz CGWF performance data in Metric units Evapo rator Entering Condenser Water T emperature (C) Leaving Water Unit 25 30 35 T emperature (C) Size kWo kWi COP kWo kWi COP kWo kWi CO P 20 70.4 14.2 5.0 67.7 15.5 4.4 64.7 17.1 3.8 20 59.4 11.4 5.2 57.0 12.6 4.5 54.5 14.0 3.9 25 73.4 14.2 5.2 70.5 15.7 4.5 67.5 17.3 3.9 6 ...

  • Trane CCAF - page 20

    CG-PRC012-EN 20 T able PD-7. 60 Hz CCAF performance data in English units Evapo rator Entering Condenser Air T emperature (F) Leaving Water Unit Condenser 85 95 105 115 T emperature (F) Size Si ze T ons kW EER T ons kW EER T ons kW EER T ons kW EER 20 CAUC-C20 19.4 19.5 11.8 18.4 21.6 10.1 17.3 23.9 8.6 16.1 26.6 7.2 20 CAUC-C25 19.7 18.6 12.6 18.7 ...

  • Trane CCAF - page 21

    21 CG-PRC012-EN T able PD-8. 60 Hz CCAF performance data in English units Evapo rator Entering Condenser Air T emperature (F) Leaving Water Unit Condenser 85 95 105 115 T emperature (F) Size Siz e T ons kW EER T o ns kW EER T ons kW EER T on s kW EER 20 CAUC-C20 21.3 20.1 12.6 20.2 22.2 10.8 19.0 24.6 9.2 17.7 27.3 7.7 20 CAUC-C25 21.7 19.1 13.5 20 ...

  • Trane CCAF - page 22

    CG-PRC012-EN 22 T able PD-9. 60 Hz CCAF performance data in Metric units Evapo rator Entering Condenser Air T emperature (C) Leaving Water Unit Condenser 30 35 40 45 T emperature (C) Size Size k Wo k Wi COP kWo kWi COP kWo kW i CO P kWo kWi COP 20 CAUC-C20 69.4 19.8 3.5 66.2 21.7 3.0 62.5 23.8 2.6 58.7 26.2 2.2 20 CAUC-C25 70.7 18.9 3.7 67.3 20.7 3 ...

  • Trane CCAF - page 23

    23 CG-PRC012-EN T able PD-5. Part-load per formance for CGWF 20-60 ton – 60 Hz in English units Unit Size 100% IPL V T ons 19.9 20 kW 15.2 20.3 EER 15.5 T ons 24.5 25 kW 19.0 20.5 EER 15.4 T ons 29.2 30 kW 22.8 20.3 EER 15.3 T ons 39.4 40 kW 30.1 20.7 EER 15.6 T ons 48.6 50 kW 37.6 19.6 EER 15.4 T ons 59.4 60 kW 46.5 19.8 EER 15.2 Notes: 1. IPL V ...

  • Trane CCAF - page 24

    CG-PRC012-EN 24 Figure P AF-1. Ethylene glycol performance adjustment factors Figure P AF-2. Propylene glycol performance adjustment factors Adjustment Factors Performance Data ...

  • Trane CCAF - page 25

    25 CG-PRC012-EN T able P AF-1. Pressure drop correction factor Leaving W at er Percent of Ethylene Glycol T emperature 0 10 20 30 40 50 0 NA NA NA NA 1.50 1.60 10 NA NA NA 1.38 1.46 1.55 20 NA NA 1.26 1.34 1.42 1.51 30 NA 1.15 1.22 1.30 1.38 1.47 40 1.00 1.12 1.19 1.26 1.34 1.42 50 1.00 1.09 1.16 1.23 1.31 1.39 60 1.00 1.05 1.09 1.12 1.16 1.21 T ab ...

  • Trane CCAF - page 26

    CG-PRC012-EN 26 Performance Data Chart PD-1. CGWF evaporator Chart PD-2. CGWF condenser Pressure Drops ...

  • Trane CCAF - page 27

    27 CG-PRC012-EN Electrical Data and Connections T able E-1. Electrical data for CGWF water-cooled chillers Unit W iring D ata Compressor Controls Unit Rated Minimum Maximum Recommended RLA LRA Size V oltage Circuit Ampaci ty Fuse Size Dual Element Fuse Size Quantity Each Each kW 208-230/60 77 110 100 34 251 0.16 380/60 38 50 50 2-10 17 142 0.16 20 ...

  • Trane CCAF - page 28

    CG-PRC012-EN 28 Electrical Data and Connections T ypical Wiring Diagram ...

  • Trane CCAF - page 29

    29 CG-PRC012-EN Electrical Data and Connections T ypical Wiring Diagram ...

  • Trane CCAF - page 30

    CG-PRC012-EN 30 Electrical Data and Connections Field Layout ...

  • Trane CCAF - page 31

    31 CG-PRC012-EN Electrical Data and Connections Field Layout ...

  • Trane CCAF - page 32

    CG-PRC012-EN 32 Dimensional Data Size A B C D E F G H 20 T on 2 " 8 1/2" 4 '-8" 1'-3 3/8" 4 1/8" 8 5/8" 5 5/8" 2' 7 3/8" (51) (216) (1423) (391) (105) (218) (143) (797) 25 T on 2 " 8 1/2" 4 '-8" 1'-3 3/8" 4 1/8" 8 5/8" 5 5/8" 2' 7 3/8" (51) ...

  • Trane CCAF - page 33

    33 CG-PRC012-EN CGWF 40-50 T o n Size A B C D E 40 T o n 2 1/2" 1'-3 3/4" 6'-5 1/2" 1'-4 1/4" 4 3/8" (64) (400) (1968) (413) (111) 50 T o n 3" 1'-3 1/2" 6'-5" 1'-6 1/8" 2 1/2" (76) (394) (1956) (480) (64) Notes: 1. Dimensions in ( ) are in millimeters. 2. Dimensional to ...

  • Trane CCAF - page 34

    CG-PRC012-EN 34 CGWF 60 T o n Dimensional Data ...

  • Trane CCAF - page 35

    35 CG-PRC012-EN English Dimensions Unit Size A B C D E F 20 T o n 8 1/2” 3’-11 1/2” 2” 2’-0” 1’-3 1/2” 3’-3 ” 25 T o n 8 1/2” 3’-11 1/2” 2” 1’-11 3/4” 1’-3 1/2” 3’ -10” 30 T on 7 3/4” 3’-10 3/4” 2 1/2” 2’-1 7/8” 1’-5 3/8” 3’-10 ” Metric Dimensions (mm) Unit Size A B C D E F 20 T on 216 120 ...

  • Trane CCAF - page 36

    CG-PRC012-EN 36 English Dimensions Unit Size A B C D E F 40 T o n 5’-1 3/4” 1’-3 3/4” 1’-11 1/4” 2 1/2” 3’- 5” 1’-4 1/4” 50 T o n 5’-1 1/2” 1’-3 1/2” 2’-1 1/8” 3” 3 ’-10” 1’-6 1/8” 60 T o n 5’-1 1/2” 1’-3 1/2” 2’-0 7/8” 3” 3 ’-10” 1’-6 1/8” Metric Dimensions (mm) Unit Size A B C D E ...

  • Trane CCAF - page 37

    37 CG-PRC012-EN T able W-1. Weights, CGWF chillers Unit 20 25 30 40 50 60 Oper ating W t. (pounds) 1694 1757 2249 2746 2977 3905 (kilogram) 768 797 1020 1246 1350 1771 Ship ping W t. (pounds) 1522 1600 2014 2366 2626 3376 (kilogram) 690 726 914 1073 1191 1531 T able W-2. Weights, CCAF compressor chillers Unit 20 25 30 40 50 60 Oper ating W t. (poun ...

  • Trane CCAF - page 38

    CG-PRC012-EN 38 General All scroll chillers are factory tested and monitored for power and control operation (CGWF only). CGWF units ship with a full operating charge of refrigerant and oil. CCAF units ship with a full operating charge of oil. Exposed surfaces are painted with an air -dry beige primer -finisher prior to shipment. Compressor -Motor ...

  • Trane CCAF - page 39

    39 CG-PRC012-EN Mechanical Specifications DynaView Panel Factory-mounted to the control panel door , the operator interface has an LCD touch-screen display for operator input and information output. This interface provides access to the following information: evaporator report, condenser report, compressor report, ASHRAE Guideline 3 report, main, c ...

  • Trane CCAF - page 40

    T rane has a policy of continuous product and product data improvement and reserves the right to change design and specifications without notice. Literature Order Number File Number Supersedes Stocking Location T rane A business of American Standard Companies www .trane.com For more information contact your local sales office or e-mail us at comfor ...

Produzent Trane Kategorie Refrigerator

Dokumente, die wir vom Produzenten des Geräts Trane CCAF erhalten, können wir in mehrere Gruppen teilen. Unteranderem in:
- technische Zeichnungen Trane
- Bedienungsanleitungen CCAF
- Produktkarten Trane
- Informationsbroschüren
- oder Energieetiketten Trane CCAF
Jede von ihnen ist wichtig, jedoch finden wir die wichtigsten Informationen für den Nutzer des Geräts in der Bedienungsanleitung Trane CCAF.

Die Dokumentengruppe, die als Bedienungsanleitungen bezeichnet wird, wird ebenfalls in detaillierte Arten geteilt, solche wie: Montageanleitungen Trane CCAF, Wartungsanleitungen, Kurzanleitungen oder Benutzeranleitungen Trane CCAF. Abhängig vom Bedarf, sollten Sie das Dokument finden, das Sie brauchen. In unserem Service können Sie sich die populärste Bedienungsanleitung des Produkts Trane CCAF ansehen.

Ähnliche Bedienungsanleitungen

Die komplette Bedienungsanleitung des Geräts Trane CCAF, wie sollte sie aussehen?
Die Bedienungsanleitung, auch bezeichnet als Benutzerhandbuch, oder einfach nur „Anleitung”, ist ein technisches Dokument, das dem Benutzer bei der Nutzung von Trane CCAF hilfreich sein soll. Die Bedienungsanleitungen werden in der Regel von technischen Schriftstellern geschrieben, aber in einer Sprache, die für alle Nutzer von Trane CCAF verständlich ist.

Eine gänzliche Bedienungsanleitung von Trane sollte einige Grundelemente enthalten. Ein Teil von ihnen ist nicht so wichtig, wie z.B.: die Titelseite oder Autorenseiten. Die restlichen von ihnen jedoch, sollten Informationen liefern, die für den Nutzer von enormer Wichtigkeit sind.

1. Einführung und Hinweise, wie man sich in einer Bedienungsanleitung von Trane CCAF bewegt - Am Anfang jeder Bedienungsanleitung sollten wir Hinweise bezüglich der Nutzungsart eines bestimmten Ratgebers finden. In ihr sollten sich Informationen über die Lokalisierung des Inhaltsverzeichnisses von Trane CCAF befinden, FAQ oder über oft auftretende Probleme – also Stellen, die von den Benutzern in jeder Bedienungsanleitung am meisten gesucht werden
2. Inhaltsverzeichnis - Index aller Ratschläge bezüglich Trane CCAF, die wir im aktuellen Dokument finden
3. Ratschläge zur Nutzung der Grundfunktionen des Geräts Trane CCAF - die uns die ersten Schritte während der Nutzung von Trane CCAF erleichtern sollten
4. Troubleshooting - geordneter Tätigkeitslauf, der uns bei der Diagnose und als nächstes bei der Lösung wichtiger Probleme mit Trane CCAF hilft
5. FAQ - häufig gestellte Fragen
6. Kontaktdaten Informationen darüber, wo man Kontakt zum Produzenten / Service von Trane CCAF im bestimmten Land suchen kann, wenn es nicht gelingt, das Problem selbst zu lösen.

Haben Sie eine Frage bezüglich Trane CCAF?

Nutzen Sie das untere Formular

Wenn Sie mit Hilfe der gefundenen Bedienungsanleitung Ihr Problem mit Trane CCAF nicht gelöst haben, stellen Sie eine Frage, indem Sie das untere Formular nutzen. Wenn einer der Nutzer ein ähnliches Problem mit Trane CCAF hatte, ist es möglich, dass er mit Ihnen die Lösung teilen möchte.

Text vom Bild übertragen

Kommentare (0)