Bedienungsanleitung Bunn CDBC-TSR

32 Seiten 1.22 mb
Download

Zur Seite of 32

Summary
  • Bunn CDBC-TSR - page 1

    BUNN-O-MA TIC CORPORA TION POST OFFICE BOX 3227 SPRINGFIELD, ILLINOIS 62708-3227 PHONE: (217) 529-6601 FAX: (217) 529-6644 www .bunnomatic.com OPERA TING & SER VICE MANU AL BU N N ® CEZ-APS, CDBC-APS, CEZ-TS, CDBC-TS, CEZ-TSR, CDBC-TSR BUNN M A N U F A C T U R E D B Y B U N N - O - M A T I C C O R P O R A T I O N S P R I N G F I E L D , I L L ...

  • Bunn CDBC-TSR - page 2

    Page 2 INTRODUCTION This equipment will automatically brew a half-gallon batch of coffee into an awaiting server at the press of a button. A hot water faucet may be included for allied beverage use. Most functions of the brewer are digitally controlled. It is only for indoor use on a sturdy counter or shelf. CONTENTS Introduction & Warranty ... ...

  • Bunn CDBC-TSR - page 3

    Page 3 USER NOTICES Carefully read and follow all notices in this manual and on the equipment. All labels on the equipment should be kept in good condition. Replace any unreadable or damaged labels. ...

  • Bunn CDBC-TSR - page 4

    Page 4 ELECTRICAL REQUIREMENTS CAUTION - The brewer must be disconnected from the power source until specified in Initial Set-Up. Model 15 has an attached cordset and requires 2-wire grounded service rated 120 volts ac, 15 amp, single phase, 60 Hz. Model 35 requires 3-wire, grounded service rated 120/208 or 120/240 volts ac, 20 amp, single phase, 6 ...

  • Bunn CDBC-TSR - page 5

    Page 5 OPERA TING CONTROLS Model CEZ-APS/TS/TSR ON/OFF SWITCH Placing the "ON/OFF" switch in the "ON" upper position enables the brew circuit, and energizes the tank refill circuit. Placing the switch in the "OFF" lower position stops tank refilling and brewing. Stop- ping a brew cycle after it has been started will no ...

  • Bunn CDBC-TSR - page 6

    Page 6 INITIAL SET -UP 1. Insert an empty funnel into the funnel rails. 2. Place an empty server under the funnel. 3. Connect the brewer to the power source. 4. Model CDBC-APS/TS/TSR – Press the "ON/OFF" switch (indicator glowing). Model CEZ-APS/TS/TSR – Place the "ON/OFF" switch in the "ON" upper position. 5. Wate ...

  • Bunn CDBC-TSR - page 7

    Page 7 CEZ-APS/TS/TSR ADJUSTMENTS & OPTIONAL SETTINGS ...

  • Bunn CDBC-TSR - page 8

    Page 8 CDBC-APS/TS/TSR ADJUSTMENTS & OPTIONAL SETTINGS Setting Brew Temperature The brewer is factory set to brew at 200 ° F(95 ° C). To change this setting, press and hold the "HIDDEN" switch beneath the "®". The word "TEMP" above the "ON/OFF" switch will glow to correspond with the temporary function ...

  • Bunn CDBC-TSR - page 9

    Page 9 TROUBLESHOOTING A troubleshooting guide is provided to suggest probable causes and remedies for the most likely problems encountered. If the problem remains after exhausting the troubleshooting steps, contact the Bunn-O-Matic Technical Service Department. • Inspection, testing, and repair of electrical equipment should be performed only by ...

  • Bunn CDBC-TSR - page 10

    Page 10 Will not fill or refill PROBABLE CAUSE REMEDY PROBLEM 1. Power off to brewer (CDBC- APS/TS/TSR & CEZ-APS/TS/TSR) 2. Water shut off (CDBC-APS/TS/ TSR & CEZ-APS/TS/TSR) 3. Display flashing (CDBC-APS/ TS/TSR) or ready light flashing (CEZ-APS/TS/TSR) 4. ON/OFF Switch (CDBC-APS/TS/ TSR & CEZ-APS/TS/TSR) 5. Lime build up on Probe (CDB ...

  • Bunn CDBC-TSR - page 11

    Page 11 TROUBLESHOOTING (cont.) Fill or refill does not shut "OFF" (ON/OFF Switch "ON") Fill or refill does not shut "OFF" (ON/OFF Switch "OFF") PROBABLE CAUSE REMEDY PROBLEM 1. Lime build up on probe (CDBC- APS/TS/TSR & CEZ-APS/TS/TSR) 2a. Water Level Probe Sensing System (CDBC-APS/TS/TSR) 2b. Water Leve ...

  • Bunn CDBC-TSR - page 12

    Page 12 TROUBLESHOOTING (cont.) PROBLEM PROBABLE CAUSE REMEDY HEATING CIRCUIT 1. Display flashing (CDBC-APS/ TS/TSR) or ready light flashing (CEZ-APS/TS/TSR) 2. Water not touching tempera- ture probe 3a. Dry Plug In Probe Sensing System (CDBC-APS/TS/TSR) 3b. Dry Plug In Probe Sensing System (CEZ-APS/TS/TSR) Brewer has shut down due to malfunction ( ...

  • Bunn CDBC-TSR - page 13

    Page 13 TROUBLESHOOTING (cont.) PROBLEM PROBABLE CAUSE REMEDY Water does not heat to proper temperature (cont.) IMPORTANT: Make sure no tem- perature tests are taken before the ready light is "ON". Tank tempera- ture must be stabilized before read- ings are taken. Spitting or excessive steaming 4a. Temperature Probe (CDBC- APS/TS/TSR) 4b. ...

  • Bunn CDBC-TSR - page 14

    Page 14 TROUBLESHOOTING (cont.) PROBLEM PROBABLE CAUSE REMEDY Spitting or excessive steaming (cont.) Brewer is making unusual noises 2a. Temperature Probe (CDBC- APS/TS/TSR) 2b. Temperature Probe (CEZ-APS/ TS/TSR) 3. Control Board (CDBC & CEZ) 1. Plumbing lines 2. Water supply 3. Lime build up A) Remove the probe from the grommet and submerge i ...

  • Bunn CDBC-TSR - page 15

    Page 15 TROUBLESHOOTING (cont.) PROBLEM PROBABLE CAUSE REMEDY BREWING CIRCUIT Brew cycle will not start 1. Display flashing (CDBC-APS/ TS/TSR) or ready light flashing (CEZ-APS/TS/TSR) 2. No water 3. No power or incorrect voltage to the brewer 4. ON/OFF switch not in the "ON" position 5. Low water temperature (Brew lockout is enabled) 6. W ...

  • Bunn CDBC-TSR - page 16

    Page 16 TROUBLESHOOTING (cont.) PROBLEM PROBABLE CAUSE REMEDY BREWING CIRCUIT (cont.) If the start switch (CEZ-APS/TS/ TSR) or switch panel (CDBC-APS/ TS/TSR) is operating properly, proceed as follows. Attach a volt- meter to the terminals of the dis- pense valve solenoid. Connect the brewer to the power source. Turn on the brewer and press the BRE ...

  • Bunn CDBC-TSR - page 17

    Page 17 TROUBLESHOOTING (cont.) PROBLEM PROBABLE CAUSE REMEDY BREWING CIRCUIT (cont.) Dripping from sprayhead Weak beverage 1. Lime build up 2. Dispense valve 1. Sprayhead 2. Water temperature 3. Filter type 4. Coffee grind 5. Funnel loading Inspect the tank assembly for ex- cessive lime deposits. Delime as required. Remove the dispense valve and c ...

  • Bunn CDBC-TSR - page 18

    Page 18 TROUBLESHOOTING (cont.) PROBLEM PROBABLE CAUSE REMEDY BREWING CIRCUIT (cont.) Dry coffee grounds remain in the funnel 1. Sprayhead 2. Funnel loading Make sure sprayhead is present and holes are clear and unob- structed. There should be six sepa- rate streams of water coming out of the sprayhead. The BUNN ® paper filter must be centered in ...

  • Bunn CDBC-TSR - page 19

    Page 19 DIAGNOSTICS Intermittent flashing of the READY indicator (Model CEZ) or the bank of temperature indicators (Model CDBC) indicates that a fault exists. Count the number of flashes between pauses and use this chart as a guide to investigating the fault. FLASHES CAUSE THINGS TO CHECK 1 Dry Plug - In Fault - Water Pressure Sheath of temperature ...

  • Bunn CDBC-TSR - page 20

    Page 20 BUNN M A N U F A C T U R E D B Y B U N N - O - M A T IC C O R P O R A T IO N S P R I N G F I E L D , I L L I N O I S , U . S . A . M O D E L S / N V O L T S A . C . A M P W A T T S P H A S E W I R E H E R T Z C O V E R E D U N D E R O N E O R M O R E O F T H E F O L L O W I N G P A T E N T S : O N E O R M O R E O T H E R P A T E N T S M A Y ...

  • Bunn CDBC-TSR - page 21

    Page 21 BUNN M A N U F A C T U R E D B Y B U N N - O - M A T I C C O R P O R A T I O N S P R IN G F IE L D , I L L I N O I S , U .S . A . M O D E L S / N V O L T S A . C . A M P W A T T S P H A S E W I R E H E R T Z C O V E R E D U N D E R O N E O R M O R E O F T H E F O L L O W I N G P A T E N T S : O N E O R M O R E O T H E R P A T E N T S M A Y ...

  • Bunn CDBC-TSR - page 22

    Page 22 TRM2 J1 J2 J3 J4 J5 J6 J7 TRM1 C A U T IO N : W A R M E R S A N D S U R F A C E S A R E H O T SERVICE (cont.) CONTROL BOARD - Model CEZ-APS/TS/TSR Location: The Control Board is located inside the trunk behind the front access panel. Test Procedures: The test procedures for the control board will vary depending upon the problems experienced ...

  • Bunn CDBC-TSR - page 23

    Page 23 BUNN MANUFACTURED BY BUNN-O-MATIC CORPORATION SPRINGFIELD, ILLINOIS, U.S.A. MODEL S/N VOLTS A.C. AMP WATTS PHASE WIRE HERTZ COVERED UNDER ONE OR MOREOF THE FOLLOWING PATENTS : ONE OR MORE OTHER PATENTS MAY BE PENDING SERVICE (cont.) SWITCH PANEL - Model CDBC-APS/TS/TSR Location: The Switch Panel is located in the front of the hood. Test Pro ...

  • Bunn CDBC-TSR - page 24

    Page 24 BUNN MANUFACTURED BY BUNN-O-MATIC CORPORATION SPRINGFIELD, ILLINOIS, U.S.A. MODEL S/N VOLTS A.C. AMP WATTS PHASE WIRE HERTZ COVERED UNDER ONE OR MOREOF THE FOLLOWING PATENTS : ONE OR MORE OTHER PATENTS MAY BE PENDING D IS C O N N E C T F R O M P O W E R S O U R C E B E F O R E R E M O V A L O F A N Y P A N E L O R R E P L A C E M E N T O F ...

  • Bunn CDBC-TSR - page 25

    Page 25 BUNN M ANUFACTURED BY BUNN -O-MATIC CORPORATION SPRINGFIELD, ILLINOIS, U.S.A. MODE L S/N VO LTS A.C. AMP W ATT S PHA SE W IRE HERTZ CO VERED UNDER ONE O R MOREOF THE FO LLOW ING PATENTS : ONE OR M ORE OTHER PA TENTS M AY BE PENDING D IS C O N N E C T F R O M P O W E R S O U R C E B E F O R E R E M O V A L O F A N Y P A N E L O R R E P L A C ...

  • Bunn CDBC-TSR - page 26

    Page 26 B U N N M A N U F A C T U R E D B Y B U N N - O - M A T I C C O R P O R A T I O N S P R I N G F I E L D , I L L I N O I S , U . S . A . M O D E L S / N V O L T S A . C . A M P W A T T S P H A S E W I R E H E R T Z C O V E R E D U N D E R O N E O R M O R E O F T H E F O L L O W I N G P A T E N T S : O N E O R M O R E O T H E R P A T E N T S ...

  • Bunn CDBC-TSR - page 27

    Page 27 B U N N M A N U F A C T U R E D B Y B U N N - O - M A T I C C O R P O R A T I O N S P R I N G F I E L D , I L L I N O I S , U . S . A . M O D E L S / N V O L T S A . C . A M P W A T T S P H A S E W I R E H E R T Z C O V E R E D U N D E R O N E O R M O R E O F T H E F O L L O W I N G P A T E N T S : O N E O R M O R E O T H E R P A T E N T S ...

  • Bunn CDBC-TSR - page 28

    Page 28 Location: The tank heater is located inside the tank and secured to the tank bottom. Test Procedures: 1. Disconnect the brewer from the power supply. 2. With a voltmeter, check the voltage across the white or red wire from the terminal block and the black wire from the control board. Connect the brewer to the power source. The indication mu ...

  • Bunn CDBC-TSR - page 29

    Page 29 P1856 SERVICE (cont.) TANK HEATER (Cont.) BLK to Control Board WHI or RED to Terminal Block FIG. 14 TANK HEATER WIRING 29253 071599 17. Install tank assembly onto mounting brackets and secure in place with four #8-32 nuts. 18. Install tank lid and secure in place with eight #8-32 nuts. 19. Connect the two white wires of the tank warmer blan ...

  • Bunn CDBC-TSR - page 30

    Page 30 T R M 2 J1 J2 J3 J4 J5 J6 J7 T R M 1 ...

  • Bunn CDBC-TSR - page 31

    Page 31 SOL 29257.0000B 12/99 ©1998 BUNN-O-MATIC CORPORATION TANK HEATER L1 GRN GRN RED-14 (MODEL 35) WHI-14 (MODELS 15 & 20) N L2 BLU-14 BLU-14 "KEEP WARM" HEATER WHI WHI LIMIT THERMOSTAT WHI WHI WHI WHI SOL REFILL DISPENSE J1-1 J1-2 J1-1 J1-5 J1-10 C O N T R O L P C B O A R D COM N.O. BLK BLK BLK BLK-14 BLK-14 BLK-14 BLK WHI/GRN WH ...

  • Bunn CDBC-TSR - page 32

    Page 32 SCHEMA TIC WIRING DIAGRAM CEZ-APS/TS/TSR WHI 29341.0000B 6/99 ©1998 BUNN-O-MATIC CORPORATION WHI WHI BREW SWITCH TANK HEATER ...

Produzent Bunn Kategorie Coffeemaker

Dokumente, die wir vom Produzenten des Geräts Bunn CDBC-TSR erhalten, können wir in mehrere Gruppen teilen. Unteranderem in:
- technische Zeichnungen Bunn
- Bedienungsanleitungen CDBC-TSR
- Produktkarten Bunn
- Informationsbroschüren
- oder Energieetiketten Bunn CDBC-TSR
Jede von ihnen ist wichtig, jedoch finden wir die wichtigsten Informationen für den Nutzer des Geräts in der Bedienungsanleitung Bunn CDBC-TSR.

Die Dokumentengruppe, die als Bedienungsanleitungen bezeichnet wird, wird ebenfalls in detaillierte Arten geteilt, solche wie: Montageanleitungen Bunn CDBC-TSR, Wartungsanleitungen, Kurzanleitungen oder Benutzeranleitungen Bunn CDBC-TSR. Abhängig vom Bedarf, sollten Sie das Dokument finden, das Sie brauchen. In unserem Service können Sie sich die populärste Bedienungsanleitung des Produkts Bunn CDBC-TSR ansehen.

Ähnliche Bedienungsanleitungen

Die komplette Bedienungsanleitung des Geräts Bunn CDBC-TSR, wie sollte sie aussehen?
Die Bedienungsanleitung, auch bezeichnet als Benutzerhandbuch, oder einfach nur „Anleitung”, ist ein technisches Dokument, das dem Benutzer bei der Nutzung von Bunn CDBC-TSR hilfreich sein soll. Die Bedienungsanleitungen werden in der Regel von technischen Schriftstellern geschrieben, aber in einer Sprache, die für alle Nutzer von Bunn CDBC-TSR verständlich ist.

Eine gänzliche Bedienungsanleitung von Bunn sollte einige Grundelemente enthalten. Ein Teil von ihnen ist nicht so wichtig, wie z.B.: die Titelseite oder Autorenseiten. Die restlichen von ihnen jedoch, sollten Informationen liefern, die für den Nutzer von enormer Wichtigkeit sind.

1. Einführung und Hinweise, wie man sich in einer Bedienungsanleitung von Bunn CDBC-TSR bewegt - Am Anfang jeder Bedienungsanleitung sollten wir Hinweise bezüglich der Nutzungsart eines bestimmten Ratgebers finden. In ihr sollten sich Informationen über die Lokalisierung des Inhaltsverzeichnisses von Bunn CDBC-TSR befinden, FAQ oder über oft auftretende Probleme – also Stellen, die von den Benutzern in jeder Bedienungsanleitung am meisten gesucht werden
2. Inhaltsverzeichnis - Index aller Ratschläge bezüglich Bunn CDBC-TSR, die wir im aktuellen Dokument finden
3. Ratschläge zur Nutzung der Grundfunktionen des Geräts Bunn CDBC-TSR - die uns die ersten Schritte während der Nutzung von Bunn CDBC-TSR erleichtern sollten
4. Troubleshooting - geordneter Tätigkeitslauf, der uns bei der Diagnose und als nächstes bei der Lösung wichtiger Probleme mit Bunn CDBC-TSR hilft
5. FAQ - häufig gestellte Fragen
6. Kontaktdaten Informationen darüber, wo man Kontakt zum Produzenten / Service von Bunn CDBC-TSR im bestimmten Land suchen kann, wenn es nicht gelingt, das Problem selbst zu lösen.

Haben Sie eine Frage bezüglich Bunn CDBC-TSR?

Nutzen Sie das untere Formular

Wenn Sie mit Hilfe der gefundenen Bedienungsanleitung Ihr Problem mit Bunn CDBC-TSR nicht gelöst haben, stellen Sie eine Frage, indem Sie das untere Formular nutzen. Wenn einer der Nutzer ein ähnliches Problem mit Bunn CDBC-TSR hatte, ist es möglich, dass er mit Ihnen die Lösung teilen möchte.

Text vom Bild übertragen

Kommentare (0)