COMMERCIAL GAS W A TER HEA TERS Instruction Manual PRINTED IN THE U . S .A. 0310 197784-001 PLACE THESE INSTRUCTIONS ADJACENT TO HEA TER AND NOTIFY OWNER TO KEEP FOR FUTURE REFERENCE. ? ...
-
State Industries SUF-100-250 - page 2
2 Supply Gas Line Installation ............................................................ 39 Supply Gas Regulator Installation ................................................... 40 ............................................................................... 41 ? ...
-
State Industries SUF-100-250 - page 3
3 SAFE INST ALLA TION, USE AND SERVICE ? ...
-
State Industries SUF-100-250 - page 4
4 PRE CAUT IONS ? ...
-
State Industries SUF-100-250 - page 5
5 GENERAL SAFETY INFORMA TION Fire Hazard Do not install water heater on carpeted floor . Do not operate water heater if flood damaged. For continued protection against risk of fire: Fire or Explosion Hazard Read instruction manual before installing, using or servicing water heater . Avoid all ignition sources if you smell gas. Do not store or use ...
-
State Industries SUF-100-250 - page 6
6 ? ...
-
State Industries SUF-100-250 - page 7
7 BAS IC O PERA TION ...
-
State Industries SUF-100-250 - page 8
8 1 1. 12. ? ...
-
State Industries SUF-100-250 - page 9
9 10. 1 1. 12. ? ...
-
State Industries SUF-100-250 - page 10
10 10. ...
-
State Industries SUF-100-250 - page 11
1 1 Figure 6 ROU GH I N DI MEN SION S INST ALLA TION CONSIDERA TIONS FRONT BACK CLEANOUT T & P V AL VE 3/4” NPT DRAIN 1 1/2” NPT WA TER INLET VENT CONNECTION 3 INCH PVC (exhaust elbow) CONDENSA TE DRAIN CONNECTION 1/2 INCH PVC INT AKE AIR CONNECTION 3 INCH PVC SUPPL Y GAS CONNECTION E H D C A I G F B WA TER OUTLET HEIGHT These designs compl ...
-
State Industries SUF-100-250 - page 12
12 STORAGE CAP ACITIES T ABLE 2 MODEL U. S. GALLONS LITERS 60 227 100 379 100 379 100 379 GAS LINE CONNECTION SIZE T ABLE 1 † MODEL SERIES NA TURAL GAS PROP ANE GAS 100/101 3/4 "N ...
-
State Industries SUF-100-250 - page 13
13 ? ...
-
State Industries SUF-100-250 - page 14
14 POW ER S UPPL Y ...
-
State Industries SUF-100-250 - page 15
15 HOT W A TER OUTLET TO T ANK INLET CHECK V AL VE MIXING V AL VE COLD W A TER INLET TEMPERED W A TER OUTLET 12” TO 15” (30-38 cm) CHECK V AL VE Figure 8 ? ...
-
State Industries SUF-100-250 - page 16
16 W ater Damage Hazard T emperature-Pressure Relief V alve discharge pipe must terminate at adequate drain. • C A U T I O N T&P V alve Discharge Pipe Requirements: Shall not be smaller in size than the outlet pipe size of the ? ...
-
State Industries SUF-100-250 - page 17
17 CON DENS A TE D RAI N ? ...
-
State Industries SUF-100-250 - page 18
18 UNUSUALL Y TIGHT CONSTRUCTION ...
-
State Industries SUF-100-250 - page 19
19 ...
-
State Industries SUF-100-250 - page 20
20 AIR FRO M OT HER IND OOR SP ACE S Figure 14 ...
-
State Industries SUF-100-250 - page 21
21 COM MONW EAL TH OF MA SSAC HUSE TTS ...
-
State Industries SUF-100-250 - page 22
22 2. ...
-
State Industries SUF-100-250 - page 23
23 ? ...
-
State Industries SUF-100-250 - page 24
24 MINIMUM EQUIV ALENT LENGTHS Three Inch Pipe ...
-
State Industries SUF-100-250 - page 25
25 9. ...
-
State Industries SUF-100-250 - page 26
26 14. ? ...
-
State Industries SUF-100-250 - page 27
27 VER TICA L TERM INA TION INS T ALLA TION 1. NOTE: ? ...
-
State Industries SUF-100-250 - page 28
28 2” (5 cm) MAXIMUM F ACTOR Y SUPPLIED ST ANDARD TERMINA TION POINTED DOWN T OWARDS THE GROUND VERTICAL TERMINA TION(S) INST ALLA TION INT AKE AIR AND/OR VENT (EXHAUST) FIELD SUPPLIED 90° ELBOW FIELD SUPPLIED STRAP/SUPPORT FIELD SUPPLIED PLUMBING ROOF BOOT OR FLASHING MAINT AIN 12” (30 cm) 18” (45 cm) FOR CANADA MINIMUM CLEARANCE ABOVE HIGH ...
-
State Industries SUF-100-250 - page 29
29 SID EW ALL TER MIN A TION INS T ALLA TION 1. NOTE: ? ...
-
State Industries SUF-100-250 - page 30
30 NOTE: ? ...
-
State Industries SUF-100-250 - page 31
31 4 I NCH CONC ENT RIC TERM INA TION INST ALLA TION 4 INCH CONCENTRIC TERMINA TION KIT FOUR PIECE KIT - FIELD ASSEMBL Y REQUIRED VENT PIPE INT AKE AIR CONNECTION 3 INCH PVC VENT CONNECTION - 3 INCH PVC INT AKE AIR PIPE Y FITTING ASSEMBL Y VENT CAP VENT PIPE ASSEMBL Y VENT PIPE IS 2 1/2 INCH SDR-26 PIPE SUPPLIED LENGTH 37 INCHES (94 cm) MAXIMUM ALL ...
-
State Industries SUF-100-250 - page 32
32 Four Concentric T erminations 1. ...
-
State Industries SUF-100-250 - page 33
33 Four Concentric T erminations ? ...
-
State Industries SUF-100-250 - page 34
34 VEN TING ARR ANG EMEN TS Power V ent V ertical Figure 40 Direct V ent V ertical Figure 42 Power V ent Horizontal Figure 41 Direct V ent Horizontal Figure 43 ...
-
State Industries SUF-100-250 - page 35
35 VEN TING ARR ANG EMEN TS Direct V ent V ertical V ent Horizontal Intake Figure 44 Direct V ent V ertical Concentric Figure 46 Direct V ent Horizontal V ent V ertical Intake Figure 45 Direct V ent Horizontal Concentric Figure 47 ...
-
State Industries SUF-100-250 - page 36
36 TER MINA TION CLE ARA NCES SID EW ALL POW ER V ENT V X VENT TERMINAL AIR SUPPL Y INLET AREA WHERE TERMINAL IS NOT PERMITTED v v A G V FIXED CLOSED FIXED CLOSED OPERABLE OPERABLE V C B B B B F B V V A J V H M X X V V K B E D L POWER VENT (using room air for combustion) EXTERIOR CLEARANCES FOR SIDEW ALL VENT TERMINA TION Figure 48 V ent terminal c ...
-
State Industries SUF-100-250 - page 37
37 TER MINA TION CLE ARA NCES SID EW ALL DIR ECT VEN T V X VENT TERMINAL AIR SUPPL Y INLET AREA WHERE TERMINAL IS NOT PERMITTED v v A G V FIXED CLOSED FIXED CLOSED OPERABLE OPERABLE V C B B B B F B V V A J V H M X X V V K B E D L DIRECT VENT (using outdoor air for combustion) EXTERIOR CLEARANCES FOR SIDEW ALL VENT TERMINA TION Figure 49 V ent termi ...
-
State Industries SUF-100-250 - page 38
38 W A TER HEA TER INST ALLA TION 3. DO NOT INST ALLA TION INSTRUCTIONS 1. ...
-
State Industries SUF-100-250 - page 39
39 SUP PL Y GAS LINE INS T ALLA TION ...
-
State Industries SUF-100-250 - page 40
40 GAS LINE CONNECTION 1. ? ...
-
State Industries SUF-100-250 - page 41
41 Connecting An External Supervisory Control ? ...
-
State Industries SUF-100-250 - page 42
42 T&P V AL VE DISC HARG E P IPE Explosion Hazard T em per at ur e- Pre ss ur e Rel ie f V alv e must comply with ANSI Z21.22- CSA 4.4 and ASME code. Properly sized temperature- pressure relief valve must be installed in opening provided. Can result in overheating and excessive tank pressure. Can cause serious injury or death. ? ...
-
State Industries SUF-100-250 - page 43
43 ? ...
-
State Industries SUF-100-250 - page 44
44 THE DESKTOP SCREEN ? ...
-
State Industries SUF-100-250 - page 45
45 ST A TUS ICONS ? ...
-
State Industries SUF-100-250 - page 46
46 OPERA TING ST A TES ? ...
-
State Industries SUF-100-250 - page 47
47 USE R SE TTIN GS & CO NTRO L SYS TEM MENU S TEMPERA TURES MENU Operating Set Point And Differential Adjustment ? ...
-
State Industries SUF-100-250 - page 48
48 TEMPERA TURES MENU (CONT) DESCRIPTION/ACTION DISPLA Y T ank T emperature ? ...
-
State Industries SUF-100-250 - page 49
49 DISPLA Y SETTINGS DESCRIPTION/ACTION DISPLA Y ? ...
-
State Industries SUF-100-250 - page 50
50 CURRENT F AUL T DESCRIPTION/ACTION DISPLA Y ...
-
State Industries SUF-100-250 - page 51
51 SERVICE CONT ACT INFORMA TION ? ...
-
State Industries SUF-100-250 - page 52
52 PRI OR T O ST ART UP ...
-
State Industries SUF-100-250 - page 53
53 8. ? ...
-
State Industries SUF-100-250 - page 54
54 SUPPL Y GAS PRESSURE ADJUSTMENT Fire and Explosion Hazard T urn off gas lines during installation. Contact a qualified installer or service agency for installation and service. Excessive gas pressure to gas valve can cause serious injury or death. Do not use water heater with any gas other than the gas shown on the rating label. ? ...
-
State Industries SUF-100-250 - page 55
55 CHE CKIN G TH E F IRIN G RA TE ...
-
State Industries SUF-100-250 - page 56
56 LIGHTING THE W A TER HEA TER OFF REG ADJUST ON F L O W FOR YOUR SAFETY READ BEFORE OPERA TING TO TURN OFF GAS T O APPLIANCE OPERA TING INSTRUCTIONS W ait five (5) minutes to clear out any gas. If you then smell gas, STOP! Follow “B” in the safety information above on this label. If you don’t smell gas, go on to the next step. IF YOU DO NOT ...
-
State Industries SUF-100-250 - page 57
57 T ank T emperature 103°F Operating Set Point 120°F Status: Heating MENU HELP UP DN GAS OFF O N MODEL INFORMA TION ON/OFF SWITCH FOR YOUR SAFETY READ BEFORE OPERA TING TO TURN OFF GAS T O APPLIANCE OPERA TING INSTRUCTIONS IF YOU DO NOT FOLLOW THESE INSTRUCTIONS EXACTL Y A FIRE OR EXPLOSION MA Y RESUL T CAUSING PROPERTY DAMAGE, PERSONAL INJUR Y ...
-
State Industries SUF-100-250 - page 58
58 SEQ UENC E OF OP ERA TION ...
-
State Industries SUF-100-250 - page 59
59 SEQ UENC E OF OP ERA TION FLOW CHA RT YE S N O W ater is hea t ed t o s e t poin t 24 Volt Ga s V a lv e de - en er giz ed 30 sec o nd I n t e r -Pur ge cy c le 24 Volt Ga s V a lv e de - ene rg iz ed R etrie s up t o t wo mor e ti mes 30 sec on d Pos t-Purg e c y cl e C on t r ol S ys t e m Lo c k s Ou t “Ign it ion Failur e ” Fau lt M sg i ...
-
State Industries SUF-100-250 - page 60
60 ? ...
-
State Industries SUF-100-250 - page 61
61 ALERT CONDITIONS ? ...
-
State Industries SUF-100-250 - page 62
62 F AUL T AND ALERT MESSAGES ...
-
State Industries SUF-100-250 - page 63
63 F AUL T AND ALERT MESSAGES (CONT) ? ...
-
State Industries SUF-100-250 - page 64
64 MAI NTEN ANCE SC HEDU LE T ABLE 14 COMPONENT OPERA TION INTERV AL REQUIRED T ank Removal Semi Annually T ank Removal Semi Annually UN-LIME® Annually ? ...
-
State Industries SUF-100-250 - page 65
65 T ANK CLEANOUT OPENING CLEANOUT COVER CLEANOUT GASKET CLEANOUT ACCESS P ANEL Figure 63 MANUAL LIME SCALE REMOV AL NOTE: ? ...
-
State Industries SUF-100-250 - page 66
66 DISCHARGE PIPE TEMPERA TURE-PRESSURE RELIEF V AL VE ? ...
-
State Industries SUF-100-250 - page 67
67 DIAGRAMS CCB - C ENTR AL CO NTRO L BOAR D LA YO UT 1 Re t ry Us e Yes Typ e Tstat Sp ar e Ext I nput 3 Retrie s N o V en t S pa re O PE N 1 2 3 4 3 2 1 6 5 4 9 8 7 12 11 10 15 14 13 J 6 J 7 3 2 4 1 1 2 J 1 5 8 4 5 6 7 1 2 3 J 1 3 3 4 1 2 J 1 0 1 3 5 2 4 J 1 1 3 4 2 J 2 1 4 2 1 2 J 3 J 5 J 4 S1 D IPSWITCH J 1 6 J 9 J 1 1 S1 DIPSWITCH DET AIL CCB ...
-
State Industries SUF-100-250 - page 68
68 SUF 120 & 1 50 WIRI NG D IAGR AM 2 GREEN WHITE RED BLACK 1 1 2 BLACK 3 WHITE COMBUSTION BLOWER UPP ER T EMPE RATU RE P ROBE 1 RED (ECO) 4 RED (ECO) 2 BLACK 3 BLACK 1 BLACK120 VAC HOT 3 WHITE 120 VAC NEUTRAL 4 YEL 24 VAC 4 YEL 24 VAC LOWER TEMPERATURE PROBE HOT SURFACE IGNITER FLAME SENSOR BLOCKED AIR INTAKE BLOCKED EXHAUST BLOWER PROVER 24 V ...
-
State Industries SUF-100-250 - page 69
69 SUF 199 & 2 50 WIRI NG D IAGR AM 2 GREEN WHITE RED BLACK 1 1 2 BLACK 3 WHITE COMBUSTION BLOWER UPP ER T EMPE RATU RE P ROBE 1 RED (ECO) 4 RED (ECO) 2 BLACK 3 BLACK 1 BLACK120 VAC HOT 3 WHITE 120 VAC NEUTRAL 4 YEL 24 VAC 4 YEL 24 VAC LOWER TEMPERATURE PROBE HOT SURFACE IGNITER FLAME SENSOR BLOCKED AIR INTAKE BLOCKED EXHAUST BLOWER PROVER 24 V ...
-
State Industries SUF-100-250 - page 70
70 CIR CULA TION PUM P WIR ING DIAG RAMS Figure 68 Figure 69 CIRCULA TING PUMP WIRING DIAGRAM STORAGE T ANK OR BUILDING RECIRCULA TION FIELD SUPPLIED TEMPERA TURE CONTROL INST ALLED IN THE STORAGE T ANK OR CIRCULA TING LOOP RETURN LINE CIRC PUMP MOTOR L1 HOT L2 NEUTRAL 120 V AC POWER NOTE: USE SEP ARA TE 120 V AC POWER SUPPL Y FOR PUMP CIRCUIT . DO ...
-
State Industries SUF-100-250 - page 71
71 4. 5. 6. ...
-
State Industries SUF-100-250 - page 72
72 4. 5. 6. ...
-
State Industries SUF-100-250 - page 73
73 4. 5. 6. ...
-
State Industries SUF-100-250 - page 74
74 4. 5. 6. ...
-
State Industries SUF-100-250 - page 75
75 4. 5. 6. ...
-
State Industries SUF-100-250 - page 76
76 4. 5. 6. ...
-
State Industries SUF-100-250 - page 77
77 4. 5. 6. ...
-
State Industries SUF-100-250 - page 78
78 LIMITED W ARRANTY ? ...
-
State Industries SUF-100-250 - page 79
79 ...
-
State Industries SUF-100-250 - page 80
...
Haben Sie eine Frage bezüglich State Industries SUF-100-250?
Nutzen Sie das untere Formular
Wenn Sie mit Hilfe der gefundenen Bedienungsanleitung Ihr Problem mit State Industries SUF-100-250 nicht gelöst haben, stellen Sie eine Frage, indem Sie das untere Formular nutzen. Wenn einer der Nutzer ein ähnliches Problem mit State Industries SUF-100-250 hatte, ist es möglich, dass er mit Ihnen die Lösung teilen möchte.