Manual de instrucciones A.O. Smith 650

24 de páginas 0.32 mb
Descargar

Pasar a la página of 24

Summary
  • A.O. Smith 650 - page 1

    1 A DIVISION OF A. O. SMITH CORPORA TION MC BEE, SC., RENTON, WA., STRA TFORD-ONT ARIO, VELDHOVEN-THE NETHERLANDS w w w .hotwater .com GAS-FIRED COMMERCIAL COPPER BOILERS FOR HYDRONIC HEA TING AND HOT W A TER SUPPL Y USER'S INFORMA TION MANUAL GB/GW-300, 400, 500, 650, 750 SERIES 400, 401, 402, 403, 404, 405, 2-ST AGE UNITS W ARNING Should ove ...

  • A.O. Smith 650 - page 2

    2 Lighting Instructions for the G(B/W) 300 through 750 models THE UNIT SHOULD NOT BE INST ALLED DIRECTLY ON A CARPETED FLOOR. A FIRE HAZARD MA Y RESUL T . Instead, the boiler must be installed on the A. O. Smith Combustible Floor Kit Base or concrete blocks extending beyond the full width and depth of the boiler by at least 3 (76.2mm) inches. If th ...

  • A.O. Smith 650 - page 3

    3 LIGHTING INSTRUCTIONS These models have an automatic hot surface ignition system mounted on the combustion chamber panel inside the front jacket. This hot surface igniter ignites the main burner gas whenever the system control calls for heat. Before proceeding with operation of the unit, make sure the boiler and system are filled with water and a ...

  • A.O. Smith 650 - page 4

    4 the surrounding air pressure. Inspection of the boiler and vent system is necessary to insure that flue gas leakage to the surrounding area does not occur . Inspect the external surfaces of the vent system every 3 months for corrosion and leakage. Inspect the vent terminations for corrosion and foreign matter which may be blocking the exhausting ...

  • A.O. Smith 650 - page 5

    5 Figure 1A. CCB (Drawing #211758) ...

  • A.O. Smith 650 - page 6

    6 Figure 1B. FCB (Drawing #211759) ...

  • A.O. Smith 650 - page 7

    7 Figure 1C. PDB (Drawing #211760) ...

  • A.O. Smith 650 - page 8

    8 closed and everything else is in the proper state, a "call for heat" condition will be initiated. These leads should be shorted together, when a thermostat is not being used. If it is desired that the thermostat control the temperature of the boiler , the operating setpoint of the system should be set higher than the temperature that th ...

  • A.O. Smith 650 - page 9

    9 CCB - Three position Dipswitch (Flame Control Section): This dipswitch is similar to the FCB dipswitches described below , but with only three switches being used: the number of blower speeds (switch #3), Hi Gas option (switch #2) and a spare (switch #1). Only the blower speed selection and Hi Gas are required because FCB1 always has a blower , i ...

  • A.O. Smith 650 - page 10

    10 • S tored values are recalled from memory . • Configuration dipswitches are read. • Pending faults are recalled • Micros on all boards start running (indicated by a flashing Y ellow LED near each micro) • Input sensors are read • Communications between micros and boards is established • FCB's are configurated with the number o ...

  • A.O. Smith 650 - page 11

    11 The operation of these parts is described below: UIM Screens: On all screens a double vertical bar appears on the right side of the display each time a key is touched to indicate that a key has been activated. On several screens an indicator ">" appears on the left side of the display to indicate the active line. The "Up/ Down& ...

  • A.O. Smith 650 - page 12

    12 except the fault states. If enabled the powered vent and the IRI gas valve are turned on. A command is sent to all active stages to cold purge the system. Cold purging clears out any combustion gas that may be in the combustion chamber . When purging is complete the system moves to the Heat S tate. • Heat St ages 1-4: The system will command t ...

  • A.O. Smith 650 - page 13

    13 • User Settings Screen: Each setpoint or user setting has either a limited selection of values, or a limited range of values. The Up/Down keys are used to change values. After changing an item, the Select key is pressed to accept the change, or the Menu key is pressed to reject the change and restore the item to its original value. The followi ...

  • A.O. Smith 650 - page 14

    14 CONNECTION DIAGRAM (Drawing #21 1769) FIGURE 4. ...

  • A.O. Smith 650 - page 15

    15 ...

  • A.O. Smith 650 - page 16

    16 Number of cycles for each stage (Number of times stage has been in heat mode). Kbtu rating of the boiler (0 to 5750Kbtu in 10Kbtu increments) The software revision level of the CCB, and FCB micro- controllers. Current Error Screen: • Displays the last error that the system has detected plus a timestamp of when the error occurred. (The timestam ...

  • A.O. Smith 650 - page 17

    17 TROUBLESHOOTING IGNITION SYSTEM Fault Messages and Lockout S tatus (* = stage number: 1 or 2) Fault Displayed Description Red LED Lockout “Display Fail” Communications with UIM interrupted Continuous Auto Reset • Check communication cable to UIM. T ry moving to other Internal Communications connector on CCB. Also check the connectors where ...

  • A.O. Smith 650 - page 18

    “Blocked Flue” Flue is Blocked Continuous SOFT • Caused by the blocked flue switch contacts being open when they should have been closed. Check for flue blockage, switch contacts, wiring. “High Limit” Outlet temp. exceeded high limit setpoint Continuous Auto Reset • Caused when the temperature of the outlet probe exceeds the high limit ...

  • A.O. Smith 650 - page 19

    Other troubleshooting hints: 1. Input switches can be easily checked by observing their activation on the UIM System S tatus screen. Force the boiler to remain in the S t andby mode by opening the Thermost at input or by setting the operating setpoint to the minimum so that the system does not request heat. Then short out the contacts on the switch ...

  • A.O. Smith 650 - page 20

    20 NOTES ...

  • A.O. Smith 650 - page 21

    21 NOTES ...

  • A.O. Smith 650 - page 22

    22 NOTES ...

  • A.O. Smith 650 - page 23

    23 NEW BOILER LIMITED W ARRANTY A. O. Smith Corporation, the warrantor , extends the following LIMITED W ARRANTY to the owner of this hydronic boiler: 1. If within TEN years after initial installation of the boiler , the heat exchanger shall prove upon examination by the warrantor to be defective in material or workmanship, the warrantor , at his o ...

  • A.O. Smith 650 - page 24

    24 A DIVISION OF A. O. SMITH CORPORA TION MC BEE, SC., RENTON, WA., STRA TFORD-ONT ARIO, VELDHOVEN-THE NETHERLANDS w w w .hotwater .com ...

Fabricante A.O. Smith Categoría Water Heater

Los documentos del dispositivo A.O. Smith 650 que obtenemos del fabricante se pueden dividir en varios grupos. Entre ellos están::
- dibujos técnicos A.O. Smith
- manuales de instrucciones 650
- hojas de producto A.O. Smith
- folletos informativos
- o etiquetas energéticas A.O. Smith 650
Todos son importantes, pero lo más importante desde el punto de vista del usuario de un dispositivo lo encontraremos en el manual de instrucciones A.O. Smith 650.

Un conjunto de documentos determinado como manual de instrucciones se divide también en tipos más detallados, tales como: instrucciones de montaje A.O. Smith 650, instrucciones de servicio, instrucciones cortas o instrucciones de usuario A.O. Smith 650. Dependiendo de la situación debes buscar el documento que necesitas. En nuestra página puedes consultar el manual de instrucciones más popular del producto A.O. Smith 650.

Manuales de instrucciones parecidos

El manual de instrucciones del dispositivo A.O. Smith 650, ¿cómo debería ser?
El manual de instrucciones, también determinado como el manual de usuario o simplemente instrucciones, es un documento técnico que tiene como objetivo ayudar a los usuarios a utilizar A.O. Smith 650. Las instrucciones normalmente las realiza un escritor técnico pero en un lenguaje comprensible para todos los usuarios de A.O. Smith 650.

El manual de instrucciones completo de A.O. Smith debe contener unos elementos básicos. Una parte de ellos es menos importante, como por ejemplo: la portada / la página principal o las páginas de autor. Sin embargo, lo demás debe facilitarnos la información más importante desde el punto de vista del usuario.

1. Introducción y pistas sobre cómo orientarse con el manual A.O. Smith 650 - Al principio de cada manual se deben encontrar las indicaciones acerca de la manera de usar un manual de instrucciones. Debe contener información sobre dónde encontrar el índice A.O. Smith 650, preguntas frecuentes o problemas más comunes – son los apartados más buscados por los usuarios de cada manual de instrucciones.
2. Índice - listados de todos los consejos acerca de A.O. Smith 650 que encontraremos en el documento
3. Consejos de uso de las funciones básicas del dispositivo A.O. Smith 650 - que deben facilitarnos los primeros pasos durante el uso de A.O. Smith 650
4. Troubleshooting - una secuencia sistematizada de acciones que nos ayudará a diagnosticar los problemas más importantes con A.O. Smith 650
5. FAQ - las preguntas frecuentes
6. Datos de contacto Información acerca de cómo encontrar los datos de contacto del fabricante / servicio de A.O. Smith 650 en cada país si no somos capaces de solucionar el problema por nuestra cuenta.

¿Tienes una pregunta acerca de A.O. Smith 650?

Utiliza el formulario que se encuentra abajo

Si con la ayuda del manual de instrucciones encontrado no has podido solucionar tu problema con A.O. Smith 650, haz una pregunta utilizando el formulario que se encuentra abajo. Si alguno de los usuarios ha tenido un problema parecido con A.O. Smith 650 probablemente compartirá una forma de solucionarlo.

Copia el texto de la imagen

Comentarios (0)