Manual de instrucciones Thermo Products CBD1-100N

57 de páginas 3.5 mb
Descargar

Pasar a la página of 57

Summary
  • Thermo Products CBD1-100N - page 1

    MG - 1006 ECN 5 3 55 - M A 1 40303 CONDENSING GAS FURNACE INSTALLATION AND O P E RAT IO N M ANUAL MODELS: CHB1 -50N CDB1 -50N CHB1 -75N CDB1 -75N CHB1 -100N CDB1 -100N CHB1 -125N CDB1 -125N : IF YOU DO NOT FOLL OW THE SAFETY PR ECAUTION S BELOW AND IN THIS MANUA L, A FIRE OR EXPLOSION MAY RES ULT CAUSIN G PROPERTY DAMAGE, PERSONAL IN JURY, OR L OSS ...

  • Thermo Products CBD1-100N - page 2

    i I. SAFETY INFORMATION This and the following pag e contain repr oductions of the various warning and instruction labels placed on the Thermo Pride Condensing Gas Furna ces. Please rea d and comply with the contents of thes e labels. ...

  • Thermo Products CBD1-100N - page 3

    All in stallati ons and services must b e performed b y quali fied serv ice personn el. ii This and the previous pag e contain reproduc tions of the various warning a nd instruction labels placed on the Thermo Pride Condensing Gas Furna ces. Please rea d and comply with the contents of these l abels. WARNING: If you do not follow these i nstruc tio ...

  • Thermo Products CBD1-100N - page 4

    All in stallati ons and services must b e performed b y quali fied serv ice personn el. iii The following saf ety i nfor ma tion shou ld be rea d, un derstood, and f ollow ed by t he in sta ller. 1. Use only w ith ty pe of gas approved for th is fu rnace. Refer to f urnace ratin g plate. 2. Conne ct thi s fur nace to an approv ed ven t sy s tem onl ...

  • Thermo Products CBD1-100N - page 5

    All in stallati ons and services must b e performed b y quali fied serv ice personn el. iv : The CH B1/CDB1 f ur na ce m o dels are sealed combusti on desi gn, wh ich does not r equir e an ai r shutter a d justme nt ( air shutters a re not used ) for pro per fla me cha racteristi c s. Burner bo x access c o ver mu st always be secu red w ith al l s ...

  • Thermo Products CBD1-100N - page 6

    All in stallati ons and services must b e performed b y quali fied serv ice personn el. v INDEX SECTION BEGINNING PAG E I. SAFETY INFORMATION i II. FURNA CE SPEC IFICA TIONS 1 III. GENERAL INSTAL LA TION 5 A. CODES A ND CLEA RANCES 5 B. FURNACE LOC ATION 6 B1.CDB1 HORIZ ON TAL AP PLI CAT I ON 7 C. REPLACING EXISTING FURNAC E FROM A COMMON VENT 8 D. ...

  • Thermo Products CBD1-100N - page 7

    All in stallati ons and services must b e performed b y quali fied serv ice personn el. 1 II. FURNACE SPECIFICAT IONS CHB 1 SERIES MO DEL NO. CHB1 - 50 CHB1 - 75 CHB1 - 100 C HB1 - 125 BTU/HR INPUT 50,000 75,000 100,000 125,000 BTU/HR OUTPUT 47,000 72,000 94,000 116,000 HT. OF CASING 44 - 1/4” 44 - 1/4” 44 - 1/4” 44 - 1/4” WIDTH OF CASING 1 ...

  • Thermo Products CBD1-100N - page 8

    All in stallati ons and services must b e performed b y quali fied serv ice personn el. 2 CDB1 SERIES MO DEL NO. CDB1 - 50 CDB1 - 75 CDB1 - 100 CDB1 - 125 BTU/HR INPUT 50,000 75,000 100,000 125,000 BTU/HR OUTPUT 47,000 70,000 94,000 116,000 HT. OF CASING 46 - 1/4” 46 - 1/4” 46 - 1/4” 46 - 1/4” WIDTH O F C ASING 17” 17” 21” 24” DEPTH ...

  • Thermo Products CBD1-100N - page 9

    All in stallati ons and services must b e performed b y quali fied serv ice personn el. 3 INSTALLAT ION PARTS PACKAGES - CHB1 - 50/75 PARTS PACKAGE #S00S4405/4406 DESCRIPTIO N PART # QUANTITY 2- 3/8” ID ra diator h ose 410017 1 The rmostat le ad bushi ng 350750 1 PVC tr ap assembly 320816 1 #8 x ¾ coa ted T EK screw s for mountin g trap & in ...

  • Thermo Products CBD1-100N - page 10

    All in stallati ons and services must b e performed b y quali fied serv ice personn el. 4 Drai n hose gro mm et 350446 1 Sprin g cla m p, 11/16” 300299 3 Installation notice MG - 987 1 PVC tee assem bly , 2 x 3” dia. 320817 1 CPVC XP VC adap ter 320833 1 Gas Co nversio n K it AOPS 7679/7664 1 INSTALLAT ION PARTS PACKAGES - CDB1 - 50/75 PARTS PA ...

  • Thermo Products CBD1-100N - page 11

    All in stallati ons and services must b e performed b y quali fied serv ice personn el. 5 #8 x ½ TEK screw s f or mounting 2 x 4 J - box 300208 2 #10 - 32 x ½ gr een gro und screw 300109 1 #10 - 32 hex nut 300110 1 3/16” dia. star was her 300270 1 Gro unding instr uc tions MG - 966 1 Wir e nut 3 00132 2 3” stainless steel hose cl amp 300276 2 ...

  • Thermo Products CBD1-100N - page 12

    All in stallati ons and services must b e performed b y quali fied serv ice personn el. 6 2. The BT U output capacity of the furn ace proposed for installation should be based on a h eat loss calcu lation made according to the m anuals provid ed by the Air Conditioning Contractors of America (ACCA) or ASHRA E. 3. MIN IM UM CLEARANCES TO COM BUSTIBL ...

  • Thermo Products CBD1-100N - page 13

    All in stallati ons and services must b e performed b y quali fied serv ice personn el. 7 4. This furn ace mu st be connected to a drain i n accordance w ith th ese ins tructions. If it is n ot practical to connect the un it to a drain, a condensate pu mp m us t be used and can be ordered as an acc essor y, part nu m ber 350225. If an acid neut ral ...

  • Thermo Products CBD1-100N - page 14

    All in stallati ons and services must b e performed b y quali fied serv ice personn el. 8 Figure 1 The horizontal fu rnace inst allation sh ould be on a service platf orm larg e enough to allow for proper clearances on all sides and serv ice access to the f ront of th e furnace (See Ta ble 1). If the f urnace is suspended, it m us t be supported at ...

  • Thermo Products CBD1-100N - page 15

    All in stallati ons and services must b e performed b y quali fied serv ice personn el. 9 D. General Requirem en ts For Venting Models CHB1 / CDB1 The CHB1 / CDB1 furnace ven ting sy stem mu st be inst alled by a qual ified servi ce person in accordance w ith l ocal install ation codes and thes e instru ctions. In th e absence of applicable local c ...

  • Thermo Products CBD1-100N - page 16

    All in stallati ons and services must b e performed b y quali fied serv ice personn el. 10 intake s yst ems mu st be considered. T his includes all elbow s, or equivalen t pipefittings , used inside the furnace jacket in addition to thos e used to constru ct the terminati o n. Fu rthermore, a credit of 5 - feet o f strai ght pipe m ay be t aken for ...

  • Thermo Products CBD1-100N - page 17

    All in stallati ons and services must b e performed b y quali fied serv ice personn el. 11 NOTICE: The fu rnace m o del seri es CHB 1 / CDB1 m ay be vented either through the sidewall or the roof. For sidewall instructions, continue to the following s ection. For r oof venting, refer to Section III G, o f this manual E. Direct V e nting Through a S ...

  • Thermo Products CBD1-100N - page 18

    All in stallati ons and services must b e performed b y quali fied serv ice personn el. 12 Figure 3: Typi cal Rel ative Loc ations of Direct Ve nt Term ina tions When Sidew all Venting 3. Exhaust Vent Term inal Location Clearance Requirem ents a. The vent term inal shall be located at least 3 - feet above any f orced air inlet located w ithin 10 - ...

  • Thermo Products CBD1-100N - page 19

    All in stallati ons and services must b e performed b y quali fied serv ice personn el. 13 Figure 4: NFGC Minim um Cleara nces Betw een the Vent Term inal and Various Buildi ng Features 4 . Vent Terminal Loca t ion Guidelines ...

  • Thermo Products CBD1-100N - page 20

    All in stallati ons and services must b e performed b y quali fied serv ice personn el. 14 : Bus hes, shr ubs, or any vege tation that may restr ict the flow of flue produc ts must be kept away fr om vent and air intake ter m inat ions. Terminat ions must als o be kept clear of an y leaves, we eds, com b ustible materia ls, snow, and ice build - up ...

  • Thermo Products CBD1-100N - page 21

    All in stallati ons and services must b e performed b y quali fied serv ice personn el. 15 2. Measure and cut two (2), 2 - inch diameter thermoplastic pipes 1 - 1 /2 inches l onger tha n the dep th of the wall. (Cuttin g the pipe longer leaves a ¾ i nch connection allow ance at both ends of th e pipe.) For 3 - inch diam eter PVC pipe, l eave a 3 - ...

  • Thermo Products CBD1-100N - page 22

    All in stallati ons and services must b e performed b y quali fied serv ice personn el. 16 Figure 6: Optional Direct Vent Kits for the CHB1 / CDB1 M odel Series of Furnac es G. Connecti ng The Furnace To Ro of Exhaust / Intake Terminations If it is not desirable, o r feasible, to vent the furnace through a sidewall, it m ay be vertica lly vented th ...

  • Thermo Products CBD1-100N - page 23

    All in stallati ons and services must b e performed b y quali fied serv ice personn el. 17 H. Exhaust / Inta ke Piping And Condensat e Drain Connec t ions At Furnace 1. Figures 6B, 7, and 8 follow depicting ty p ical exhaust ven t and air intake connection s for the furnace m odel series CHB1 and the C DB 1 , respectively, as w ell as a list of req ...

  • Thermo Products CBD1-100N - page 24

    All in stallati ons and services must b e performed b y quali fied serv ice personn el. 18 Figure 7: Required Exhaust V e nt and Air Intake Piping f or CDB1 F urnace in Dow nflow Appl ic a tions ...

  • Thermo Products CBD1-100N - page 25

    All in stallati ons and services must b e performed b y quali fied serv ice personn el. 19 Figure 8: Required Exhaust V e nt and Air Intake Piping f or CDB1 F urnace in Hor iz ontal Applica t ions. 2. Connec ting The E xhaust Vent T o T he Induc er a. Slip the end of the 2 - inch diameter PVC elbo w (for the m o d el CDX1 in horizontal app lic a ti ...

  • Thermo Products CBD1-100N - page 26

    All in stallati ons and services must b e performed b y quali fied serv ice personn el. 20 NOTICE: F or models CDB 1 - 100 and C DB1 - 125 used in h orizontal app licati ons, im mediately transition from 2 - inch to 3 - inch diameter pipe by installing the 3 - inch x 2 - inch diam eter P VC reducer just outside th e furnace casing . The remainder o ...

  • Thermo Products CBD1-100N - page 27

    All in stallati ons and services must b e performed b y quali fied serv ice personn el. 21 PVC tee). Couple the drain t ee assem bly to the pre - cut 2 - inch diam eter P VC pipe using the rein forced rubber h ose and th e two (2) ban d clamps supplied. NOTICE: All PVC thermoplastic pipe must be support e d be ginning directly over the exhaust vent ...

  • Thermo Products CBD1-100N - page 28

    All in stallati ons and services must b e performed b y quali fied serv ice personn el. 22 DO NOT! SILICONE OR SEAL THIS CONNECTION IN ANYWAY. MUST BE LOOSE FIT WITH LEAKAGE BETWEEN PVC AND METAL COLLAR. Figure 12: Typical Internal Air Intak e Piping Arrangement for All Furnace Models d. After trial fitting the entire combustion air intake sy stem, ...

  • Thermo Products CBD1-100N - page 29

    All in stallati ons and services must b e performed b y quali fied serv ice personn el. 23 Figure 1 5. Condensat e Trap Assembly Mounted O n the Mo del Series CDB1 In a Downf lo w Applicat i o n Figure 16. Conde nsate T rap Assembly Mo unt ed On The Mo del Series CDB1 In RH Side Horizo ntal Application 2. Determin e from w hich si de of the fu rnac ...

  • Thermo Products CBD1-100N - page 30

    All in stallati ons and services must b e performed b y quali fied serv ice personn el. 24 NOTICE: On t he m o d el series CHB1 / CDB1 the condensate disposal line must be on the sam e s ide as the flue outlet or, in the case of a horizo ntal application, the bo tto m o f un it. Drive two (2) #8 x 3/4 inch sh eet metal screws w ith black pro tectiv ...

  • Thermo Products CBD1-100N - page 31

    All in stallati ons and services must b e performed b y quali fied serv ice personn el. 25 6. A condens ate pump may be required when, • a suitable drain is not p r e se nt, • the drain is above t he trap outlet lev el on the furnace, or • the drain line cannot be slop ed downw ard its full len gth to the drain. If gravit y drainage of the co ...

  • Thermo Products CBD1-100N - page 32

    All in stallati ons and services must b e performed b y quali fied serv ice personn el. 26 Figure 18 2. A drip leg must be used on both LP and natural gas installations prior to the furnace in order to tra p oil, condensate and o ther impurities which m ight otherwise lodge in the gas va lve or p lug the bur ner or ifice. A d rip leg shal l b e p r ...

  • Thermo Products CBD1-100N - page 33

    All in stallati ons and services must b e performed b y quali fied serv ice personn el. 27 4. If the fu rnace is used in conn ection w ith an air condition ing evaporator coil, the f urnace m ust b e in stalled parallel wi th or on the upstream side of the coil, to prevent condens ation in the heat ex changer. If the evaporator coil is installed wi ...

  • Thermo Products CBD1-100N - page 34

    All in stallati ons and services must b e performed b y quali fied serv ice personn el. 28 DUCT SIZES FOR HO MES, QU IET O FFICES, O R SIMILAR INSTALLATIONS TAB LE 2 A Each of the sy s tem compone nts (trunk lines, take offs, runs and register and grill - free areas) must be properly s ized and mat ched together to ensure the n ecessary air han dli ...

  • Thermo Products CBD1-100N - page 35

    All in stallati ons and services must b e performed b y quali fied serv ice personn el. 29 K. FILTER S 1. CHB1 MODELS: HIG HBOYS It is necess ar y to cut the return air openin g in the bottom or si de casing dependi ng upon the needs o f the specific installation. NOTICE: If your CHB1 will req uire air d elivery above 18 00 CFM, it is ad visable th ...

  • Thermo Products CBD1-100N - page 36

    All in stallati ons and services must b e performed b y quali fied serv ice personn el. 30 Figure 20 3. USE OF NON - THERM O PR ID E F ILTER RETENTION M EANS If a m ethod other than the Therm o Pride filter rack i s sel ected for retention of the filter and/or use of a different filter type is desired, see T able 3 for minimu m size guidelines for ...

  • Thermo Products CBD1-100N - page 37

    All in stallati ons and services must b e performed b y quali fied serv ice personn el. 31 FORMULA : (tons of cooling ) x (400 CFM per t on) (144 square i nches per foot) = f ilter area sq.inches (max. air velocity of filter from table 3 for the filter type) = lengt h x widt h o f filter in inches EXAMPLE: If y ou had a CHB1 - 100 furnace and 4 ton ...

  • Thermo Products CBD1-100N - page 38

    All in stallati ons and services must b e performed b y quali fied serv ice personn el. 32 Anticipators for the heating opera tion are o f two types, pre - set and adjustable. Those that ar e pre - set will not have an adjustmen t scale and are generally marked accordingly . 4. BLOWER M OTOR SPEED WIRING Figure 21 : TURN O FF THE ELECTRICAL P OWER ...

  • Thermo Products CBD1-100N - page 39

    All in stallati ons and services must b e performed b y quali fied serv ice personn el. 33 BLOWER DELAY SETTINGS To del ay fan turn - on by : Set Swi t ch #1 #2 15 sec. 30 sec. *45 sec. 60 sec, Off Off Off On On Off On On To del ay fan turn - off by: Set Swi t ch #3 #4 60 sec. 90 sec. *120 s ec. 18 0 sec. On On Off On On Off Off Off *Factory Settin ...

  • Thermo Products CBD1-100N - page 40

    All in stallati ons and services must b e performed b y quali fied serv ice personn el. 34 START TRIA L FOR IGNIT ION START CONTINUOUS SAFE OPE RATION CHECK IF FL A M E SIM U LATIO N CO N D ITION PRESENT OR ROLL-O UT SW ITCH OPENS, SYSTEM ENERGIZES I NDUCER FAN FOR 15 SECONDS AND CIRCULATOR BLOW ER AT HEATING SPEED UNT IL SI TUATION CORRECTION THER ...

  • Thermo Products CBD1-100N - page 41

    All in stallati ons and services must b e performed b y quali fied serv ice personn el. 35 MAI N BURNER OPERATION END OF CY CL E C ALL FOR H EAT SATISF IED AF TER DELAY - TO-FAN-ON PER IOD ENDS, CIRCUL ATING AI R FAN IS ENERGI ZED AT HEA T ING SPEED . T HE (OPTI ONAL) EL ECT RONIC AI R CL EANER AND HUM IDI F I ER ARE ENE RGIZED. AF TER T HE DELAY - ...

  • Thermo Products CBD1-100N - page 42

    All in stallati ons and services must b e performed b y quali fied serv ice personn el. 36 B. INI TIA L START UP: This furnace does not have a pilot. It is eq uipped with a hot surface ign iter, which autom a tic a lly lights the burner . Do not attempt to light the burner by hand. Check the follow ing items before the initial start - up. 1. Che ck ...

  • Thermo Products CBD1-100N - page 43

    All in stallati ons and services must b e performed b y quali fied serv ice personn el. 37 FORMULA : B TU/CU FT X NUMBER OF CU FT X 360 0 SECONDS = INPUT BT U/HR EAMPL E: 1025 BTU/CU FT X 2 CU FT X 3600 = 98,633 BTU INPUT 74.8 SEC ONDS Check fo r the mode l number of thi s furnace, its input, the type o f gas and the manifold pr essure on the infor ...

  • Thermo Products CBD1-100N - page 44

    All in stallati ons and services must b e performed b y quali fied serv ice personn el. 38 Figure 22 : The CH B1/CDB1 f ur na ce m o dels are a n in - shot burne r design, w hich does not require an ai r shutter a d justme nt ( air shutters a re not used ) for pro per fla me cha racteristi c s. Burner bo x access c o ver mu st alway s be secured wi ...

  • Thermo Products CBD1-100N - page 45

    All in stallati ons and services must b e performed b y quali fied serv ice personn el. 39 V. INSTALLER 'S INSTRUCTION S TO USER: After completing the ins tallation, the installer shall inform and/or demonstrate to the homeowner: 1. The lo cation of all the instructions in the fu rnace and that these instr uctions a nd the user s informatio n ...

  • Thermo Products CBD1-100N - page 46

    All in stallati ons and services must b e performed b y quali fied serv ice personn el. 40 VI. TRO U B LESHOOTIN G NOTICE: BEFORE TROUBLESHOOTING, FAMILIARIZ E YOURSELF WIT H T HE START UP AND CHECKOUT PROCEDURE. ALL INST AL LATION AND SERVICES MUST BE P ERFORMED BY QUAL IFIED HEAT I NG CONT RACTORS. To a ssist you in troubleshooting this furnace, ...

  • Thermo Products CBD1-100N - page 47

    All in stallati ons and services must b e performed b y quali fied serv ice personn el. 41 T R OUB LES H OOT I N G GU I DE T HE S YSTEM I S ST A RT E D BY SETTI NG T HE THERMOSTA T TO C A L L FOR HEA T . THE FO L LOW I NG SHOULD HELP ESTA BL I SH THE T Y PE OF MA LFUNCTI O N OR DEV IA T I O N FRO M THE NORMA L OP ERA TI ON. TO USE THI S DI A GRA M, ...

  • Thermo Products CBD1-100N - page 48

    All in stallati ons and services must b e performed b y quali fied serv ice personn el. 42 CH ECK W IR ING T O IND UCE R AN D IF O K, RE PLACE INDUC ER ASS EM BLY. AFTE R HOT SU RFACE IGNI TOR W AR M-UP, DO ES GAS VA LVE OPEN ? CH ECK W IR ING T O HO T S URFACE IGNIT OR AN D IF O K, RE PLACE HO T SURFA CE IGNIT OR ASS EMBLY. Yes Yes No Yes Yes Yes ...

  • Thermo Products CBD1-100N - page 49

    All in stallati ons and services must b e performed b y quali fied serv ice personn el. 43 CH ECK FO R PRO PER MANIFOLD P RESSU RE. No Yes Yes Yes AFTER G AS VALVE O PENS, DO T HE BUR NER S I G NIT E? ADJUS T T O 3.5 " FO R NAT URAL GAS O R 1 0.0" W C FO R LP GAS IS IGN IT O R PO SIT IONE D CORREC TLY? REP O S IT IO N T O CO RR ECT LOCA T ...

  • Thermo Products CBD1-100N - page 50

    All in stallati ons and services must b e performed b y quali fied serv ice personn el. 44 DOES SYST EM RUN UNT I L T HERMOST AT I S SATISFIED? CH ECK AL L W IRIN G FOR LOOSE C O NNEC T I ONS . CH ECK FOR SHORT I N W I RE T O TH ERMOST A T AND CORRE CT IF NECESSARY. DOES BU RNER SH UT OFF W HEN TH ERMOST A T IS SA T ISFIED? No DOES TH E CIRCUL A TI ...

  • Thermo Products CBD1-100N - page 51

    All in stallati ons and services must b e performed b y quali fied serv ice personn el. 45 Y es TR OU BLESHO OTIN G C OM PLETE. Y es IF LED LIGH T FLA SHES: 1 FLASH , TH EN PAUSE SYSTEM L OCKO UT 2 FLASH ES, TH EN PAUSE PRESSURE SW ITCH STUC K CLO SED 3 FLASH ES, TH EN PAUSE PRESSURE SW ITCH STUC K OPEN 4 FLASH ES, TH EN PAUSE O PEN LIM I T SW I T ...

  • Thermo Products CBD1-100N - page 52

    All in stallati ons and services must b e performed b y quali fied serv ice personn el. 46 Appen dix – A Replacem ent Parts List 1. Replacem ent parts list for CHB1 - 50, CHB1 - 75, CHB1 - 100 and CHB1 - 125. ...

  • Thermo Products CBD1-100N - page 53

    All in stallati ons and services must b e performed b y quali fied serv ice personn el. 47 ...

  • Thermo Products CBD1-100N - page 54

    All in stallati ons and services must b e performed b y quali fied serv ice personn el. 48 2. Replacem ent parts list for CDB1 - 50, CD B1 - 75, CDB1 - 100 and CDB1 - 125. ...

  • Thermo Products CBD1-100N - page 55

    All in stallati ons and services must b e performed b y quali fied serv ice personn el. 49 ...

  • Thermo Products CBD1-100N - page 56

    All in stallati ons and services must b e performed b y quali fied serv ice personn el. 50 Appen dix – B W iring Di a grams ...

  • Thermo Products CBD1-100N - page 57

    All in stallati ons and services must b e performed b y quali fied serv ice personn el. 51 ...

Fabricante Thermo Products Categoría Furnace

Los documentos del dispositivo Thermo Products CBD1-100N que obtenemos del fabricante se pueden dividir en varios grupos. Entre ellos están::
- dibujos técnicos Thermo Products
- manuales de instrucciones CBD1-100N
- hojas de producto Thermo Products
- folletos informativos
- o etiquetas energéticas Thermo Products CBD1-100N
Todos son importantes, pero lo más importante desde el punto de vista del usuario de un dispositivo lo encontraremos en el manual de instrucciones Thermo Products CBD1-100N.

Un conjunto de documentos determinado como manual de instrucciones se divide también en tipos más detallados, tales como: instrucciones de montaje Thermo Products CBD1-100N, instrucciones de servicio, instrucciones cortas o instrucciones de usuario Thermo Products CBD1-100N. Dependiendo de la situación debes buscar el documento que necesitas. En nuestra página puedes consultar el manual de instrucciones más popular del producto Thermo Products CBD1-100N.

Manuales de instrucciones parecidos

El manual de instrucciones del dispositivo Thermo Products CBD1-100N, ¿cómo debería ser?
El manual de instrucciones, también determinado como el manual de usuario o simplemente instrucciones, es un documento técnico que tiene como objetivo ayudar a los usuarios a utilizar Thermo Products CBD1-100N. Las instrucciones normalmente las realiza un escritor técnico pero en un lenguaje comprensible para todos los usuarios de Thermo Products CBD1-100N.

El manual de instrucciones completo de Thermo Products debe contener unos elementos básicos. Una parte de ellos es menos importante, como por ejemplo: la portada / la página principal o las páginas de autor. Sin embargo, lo demás debe facilitarnos la información más importante desde el punto de vista del usuario.

1. Introducción y pistas sobre cómo orientarse con el manual Thermo Products CBD1-100N - Al principio de cada manual se deben encontrar las indicaciones acerca de la manera de usar un manual de instrucciones. Debe contener información sobre dónde encontrar el índice Thermo Products CBD1-100N, preguntas frecuentes o problemas más comunes – son los apartados más buscados por los usuarios de cada manual de instrucciones.
2. Índice - listados de todos los consejos acerca de Thermo Products CBD1-100N que encontraremos en el documento
3. Consejos de uso de las funciones básicas del dispositivo Thermo Products CBD1-100N - que deben facilitarnos los primeros pasos durante el uso de Thermo Products CBD1-100N
4. Troubleshooting - una secuencia sistematizada de acciones que nos ayudará a diagnosticar los problemas más importantes con Thermo Products CBD1-100N
5. FAQ - las preguntas frecuentes
6. Datos de contacto Información acerca de cómo encontrar los datos de contacto del fabricante / servicio de Thermo Products CBD1-100N en cada país si no somos capaces de solucionar el problema por nuestra cuenta.

¿Tienes una pregunta acerca de Thermo Products CBD1-100N?

Utiliza el formulario que se encuentra abajo

Si con la ayuda del manual de instrucciones encontrado no has podido solucionar tu problema con Thermo Products CBD1-100N, haz una pregunta utilizando el formulario que se encuentra abajo. Si alguno de los usuarios ha tenido un problema parecido con Thermo Products CBD1-100N probablemente compartirá una forma de solucionarlo.

Copia el texto de la imagen

Comentarios (0)