Manual de instrucciones Bunn TU3Q-EZ

22 de páginas 0.78 mb
Descargar

Pasar a la página of 22

Summary
  • Bunn TU3Q-EZ - page 1

    BU N N ® BUNN-O-MA TIC CORPORA TION TU3Q-EZ POST OFFICE BOX 3227 SPRINGFIELD, ILLINOIS 62708-3227 TELEPHONE: (217) 529-6601 FAX: (217) 529-6644 29460.0000C 8/00 © 1999 Bunn-O-Matic Corporation OPERA TING & SER VICE MANU AL ...

  • Bunn TU3Q-EZ - page 2

    Page 2 CONTENTS Introduction .............................................................. 2 Warranty ................................................................... 2 User Notices ............................................................. 3 Electrical Requirements ............................................ 4 Plumbing Requirements ....... ...

  • Bunn TU3Q-EZ - page 3

    Page 3 ...

  • Bunn TU3Q-EZ - page 4

    Page 4 ELECTRICAL REQUIREMENTS CAUTION - The brewer must be disconnected from the power sour ce until specified in Initial Set-Up. 120V model brewers require 2-wire, grounded service rated 120 volts ac, 15 amp, single phase, 60 Hz. Proceed as follows: Electrical Hook-Up CAUTION – Improper electrical installation will damage electronic components. ...

  • Bunn TU3Q-EZ - page 5

    Page 5 PLUMBING REQUIREMENTS (cont.) 1. Remove the shipping cap from the bulkhead fitting on the rear of the brewer . 2. Attach the flare fitting from the short piece of tubing on the strainer/flow control (supplied) to the water inlet fitting at the rear of the brewer . 3. Flush the water line and securely attach it to the flare fitting on the str ...

  • Bunn TU3Q-EZ - page 6

    Page 6 OPERA TING CONTROLS A. ON/OFF Switch ON - Placing the switch in the left position allows the start switch to activate a timed brew cycle for three gallons of tea. OFF - Placing the switch in the right position stops the brew cycle. Stopping a brew cycle after it has been started will not stop the flow of water into the funnel until the tank ...

  • Bunn TU3Q-EZ - page 7

    Page 7 TU3Q-EZ ADJUSTMENTS & OPTIONAL SETTINGS ...

  • Bunn TU3Q-EZ - page 8

    Page 8 TROUBLESHOOTING A troubleshooting guide is provided to suggest probable causes and remedies for the most likely problems encountered. If the problem remains after exhausting the troubleshooting steps, contact the Bunn-O-Matic T echnical Service Department. • Inspection, testing, and repair of electrical equipment should be performed only b ...

  • Bunn TU3Q-EZ - page 9

    Page 9 TROUBLESHOOTING (cont.) PROBLEM PROBABLE CAUSE REMEDY BREWING CIRCUIT Ready light flashing Brew cycle will not start 1. Brewer has shut down due to malfunction. 1. No water 2. No power or incorrect voltage to the brewer 3. ON/OFF switch not in the "ON" po- sition 4. Start Switch 5. Low water temperature (Brew lockout is enabled) 6. ...

  • Bunn TU3Q-EZ - page 10

    Page 10 TROUBLESHOOTING (cont.) PROBLEM PROBABLE CAUSE REMEDY BREWING CIRCUIT (cont.) Refer to Adjustments and Optional Settings to set brew volume. See page 7. Using a stop watch or sec- ond hand, time the length of the brew cycle. Record this time inside the top lid. If service is ever needed again, use the time as reference to determine if time ...

  • Bunn TU3Q-EZ - page 11

    Page 11 TROUBLESHOOTING (cont.) PROBLEM PROBABLE CAUSE REMEDY BREWING CIRCUIT (cont.) Weak beverage Drip out time too long Dry tea leaves remain in the funnel 1. Sprayhead 2. Water temperatur e 3. Filter type 4. Funnel loading 1. Funnel Tip 1. Sprayhead 2. Funnel loading A seven-hole stainless steel spray- head must be used for proper ex- traction. ...

  • Bunn TU3Q-EZ - page 12

    Page 12 TROUBLESHOOTING (cont.) PROBLEM PROBABLE CAUSE REMEDY Water does not heat to proper temperature IMPORT ANT : Make sure no tem- perature tests are taken before the ready light is "ON". T ank tempera- ture must be stabilized before read- ings are taken. Spitting or excessive steaming Brewer is making unusual noises 1. Water not touc ...

  • Bunn TU3Q-EZ - page 13

    Page 13 DIAGNOSTICS Intermittent flashing of the READY indicator indicates that a fault exists. Count the number of flashes between pauses and use this chart as a guide to investigating the fault. FLASHES CAUSE THINGS TO CHECK 1 Dry Plug - In Fault - Water Pr essure (Is water shut off?) Sheath of temperature probe dry for 10 minutes after power -up ...

  • Bunn TU3Q-EZ - page 14

    Page 14 SERVICE This section provides procedures for testing and replacing various major components used in this brewer should service become necessar y . Refer to T roubleshooting for assistance in determining the cause of any problem. WARNING - Inspection, testing, and r epair of electri- cal equipment should be per formed only by qualified ser v ...

  • Bunn TU3Q-EZ - page 15

    Page 15 SERVICE (cont.) BREW SOLENOID V AL VE FIG. 2 BREW SOLENOID V AL VE P1898.40 Location: The brew solenoid valve is mounted on the left side in the bottom rear of the brewer. Test Procedures: 1. Disconnect the brewer from the power sour ce. 2. Disconnect the white and white/green wires from the solenoid valve. With the ON/OFF switch in the &qu ...

  • Bunn TU3Q-EZ - page 16

    Page 16 SERVICE (cont.) LIMIT THERMOST A T FIG. 4 LIMIT THERMOST A T P1798.40 Location: The limit thermostat is located inside the hood on the tank lid. T est Pr ocedure: 1. Disconnect the brewer from the power source and remove the blue wire from the limit thermostat. 2. With a voltmeter , check the voltage across the blue wire removed from the li ...

  • Bunn TU3Q-EZ - page 17

    Page 17 SERVICE (cont.) ON/OFF SWITCH FIG. 6 ON/OFF SWITCH P1187.40 Location: The ON/OFF switch is located in the front of the hood, above and to the left of the brew funnel. T est Pr ocedure: 1. Disconnect the brewer from the power sour ce. 2. Remove the black and white/violet wires from the switch terminals. 3. With a voltmeter , check the voltag ...

  • Bunn TU3Q-EZ - page 18

    Page 18 FIG. 9 ST ART SWITCH TERMINALS P1283 SERVICE (cont.) ST ART SWITCH ...

  • Bunn TU3Q-EZ - page 19

    Page 19 SERVICE (cont.) T ANK HEA TER FIG. 10 T ANK HEA TER Location: The tank heater is located inside the tank and secured to the tank lid. T est Pr ocedures: 1. Disconnect the brewer from the power supply . 2. With a voltmeter , check the voltage across the black and white wires. Connect the brewer to the power sour ce. The indication must be 12 ...

  • Bunn TU3Q-EZ - page 20

    Page 20 SERVICE (cont.) TEMPERA TURE PROBE FIG. 12 TEMPERA TURE PROBE P1798.40 Location: The temperature probe is located on the tank rear of the tank lid, behind the tank heater. T est Pr ocedures: 1. Disconnect the brewer from the power sour ce. 2. Remove the temperature probe from the grom- met. 3. Submerge the probe in a water bath of approxi- ...

  • Bunn TU3Q-EZ - page 21

    Page 21 SERVICE (cont.) CONTROL BOARD FIG. 14 CONTROL BOARD P1798.40 ...

  • Bunn TU3Q-EZ - page 22

    Page 22 ...

Fabricante Bunn Categoría Coffeemaker

Los documentos del dispositivo Bunn TU3Q-EZ que obtenemos del fabricante se pueden dividir en varios grupos. Entre ellos están::
- dibujos técnicos Bunn
- manuales de instrucciones TU3Q-EZ
- hojas de producto Bunn
- folletos informativos
- o etiquetas energéticas Bunn TU3Q-EZ
Todos son importantes, pero lo más importante desde el punto de vista del usuario de un dispositivo lo encontraremos en el manual de instrucciones Bunn TU3Q-EZ.

Un conjunto de documentos determinado como manual de instrucciones se divide también en tipos más detallados, tales como: instrucciones de montaje Bunn TU3Q-EZ, instrucciones de servicio, instrucciones cortas o instrucciones de usuario Bunn TU3Q-EZ. Dependiendo de la situación debes buscar el documento que necesitas. En nuestra página puedes consultar el manual de instrucciones más popular del producto Bunn TU3Q-EZ.

Manuales de instrucciones parecidos

El manual de instrucciones del dispositivo Bunn TU3Q-EZ, ¿cómo debería ser?
El manual de instrucciones, también determinado como el manual de usuario o simplemente instrucciones, es un documento técnico que tiene como objetivo ayudar a los usuarios a utilizar Bunn TU3Q-EZ. Las instrucciones normalmente las realiza un escritor técnico pero en un lenguaje comprensible para todos los usuarios de Bunn TU3Q-EZ.

El manual de instrucciones completo de Bunn debe contener unos elementos básicos. Una parte de ellos es menos importante, como por ejemplo: la portada / la página principal o las páginas de autor. Sin embargo, lo demás debe facilitarnos la información más importante desde el punto de vista del usuario.

1. Introducción y pistas sobre cómo orientarse con el manual Bunn TU3Q-EZ - Al principio de cada manual se deben encontrar las indicaciones acerca de la manera de usar un manual de instrucciones. Debe contener información sobre dónde encontrar el índice Bunn TU3Q-EZ, preguntas frecuentes o problemas más comunes – son los apartados más buscados por los usuarios de cada manual de instrucciones.
2. Índice - listados de todos los consejos acerca de Bunn TU3Q-EZ que encontraremos en el documento
3. Consejos de uso de las funciones básicas del dispositivo Bunn TU3Q-EZ - que deben facilitarnos los primeros pasos durante el uso de Bunn TU3Q-EZ
4. Troubleshooting - una secuencia sistematizada de acciones que nos ayudará a diagnosticar los problemas más importantes con Bunn TU3Q-EZ
5. FAQ - las preguntas frecuentes
6. Datos de contacto Información acerca de cómo encontrar los datos de contacto del fabricante / servicio de Bunn TU3Q-EZ en cada país si no somos capaces de solucionar el problema por nuestra cuenta.

¿Tienes una pregunta acerca de Bunn TU3Q-EZ?

Utiliza el formulario que se encuentra abajo

Si con la ayuda del manual de instrucciones encontrado no has podido solucionar tu problema con Bunn TU3Q-EZ, haz una pregunta utilizando el formulario que se encuentra abajo. Si alguno de los usuarios ha tenido un problema parecido con Bunn TU3Q-EZ probablemente compartirá una forma de solucionarlo.

Copia el texto de la imagen

Comentarios (0)