Manual de instrucciones Campbell Manufacturing Weather tation

50 de páginas 0.76 mb
Descargar

Pasar a la página of 50

Summary
  • Campbell Manufacturing Weather tation - page 1

    TLX106 WEA THER STA TION INSTRUCTIO N M A NUA L 3/01 COPYRIGH T (c) 1993-2001 CA MPBELL SC IENTIFIC, INC. ...

  • Campbell Manufacturing Weather tation - page 2

    This is a blank page. ...

  • Campbell Manufacturing Weather tation - page 3

    Warranty and Assistance The TLX 106 WEATHE R STAT ION is warranted by C AMPBELL SCIENTIFIC , INC. to be free from defects in material s and workmanship under normal use and servi ce for twelve (12) months from date of s hipment unless s pecified otherwise. Bat teries have no warranty. C AMPBELL SCIENTIF IC, INC.'s obl igation under this wa rra ...

  • Campbell Manufacturing Weather tation - page 4

    This is a blank page. ...

  • Campbell Manufacturing Weather tation - page 5

    i TLX106 Weather Station Table of Contents 1. Preparation and Siting 1.1 Installation Tasks .................................................................................. 1-1 1.1.1 Indoors......................................................................................... 1-1 1.1.2 Outdoors ................................................. ...

  • Campbell Manufacturing Weather tation - page 6

    TLX106 Weather Station Table of Contents ii 4.6 Pyranometer .......................................................................................... 4-3 4.7 Sensor Verification and Clock Set.........................................................4-3 4.8 Sensor Schematics ........................................................................... ...

  • Campbell Manufacturing Weather tation - page 7

    TLX106 Weather Station Table of Contents iii 5.3-1 ProLine software provides an easy-to-use message editor ................ 5-7 5.3-2 The available options provided by the source menu are shown ........ 5-8 5.3-3 When the weather st ation source has been chosen, s everal meteorological condi tions reported in vari ous units are provided under the f ...

  • Campbell Manufacturing Weather tation - page 8

    This is a blank page. ...

  • Campbell Manufacturing Weather tation - page 9

    1-1 Section 1. Preparation and Siting These guidelines apply to several Campbell Scientific weather stations. 1.1 Installation tasks 1.1.1 I ndoor s • Immediately upon receipt of your shipment… ⇒ Open shipping cart ons. ⇒ Check contents agai nst invoice. Contact CSI immediately about any shortages . • Several days pri or to the planned in ...

  • Campbell Manufacturing Weather tation - page 10

    Section 1. Preparation and Siting 1-2 1.2.1 Tools for Tower Installati on All Towers Shovel Rake Open end wrenches: 3/8", 7/ 16", ½", (2) 9/16" Magnetic compass 6' Step ladder TLX 106 Tower Tape measure (12’ to 20’) Claw hammer Level (24” to 36” ) Hand saw Materials for concret e form: (4) 1" x 2" x 12&qu ...

  • Campbell Manufacturing Weather tation - page 11

    Section 1. Preparation and Siting 1-3 1.2.3 Suppl i es for Power and Communications Options AC Power Wire, conduit, and j unction boxes as needed Phone Modem Hayes compatib le calling modem f o r PC Phone line to weat her station or juncti on box Short-Ha ul Modem 4 Conductor communicati ons cable from PC t o weather station or junct ion box 6&apos ...

  • Campbell Manufacturing Weather tation - page 12

    Section 1. Preparation and Siting 1-4 Situati ons to avoid include: • large indust rial heat sources • rooftops • steep slop es • sheltered ho llows • high vegetati on • shaded areas • swamps • areas where snow drifts occur • low places holding standing water after rains eight of tree ogan Uta MADE IN USA FIGURE 1.3-1. Effec t of ...

  • Campbell Manufacturing Weather tation - page 13

    Section 1. Preparation and Siting 1-5 (Section 1.4.1). A general map showing magnetic decli nation for the contiguous United St ates is shown i n Figure 1.4-1. Declination angles east of True North are considered negative, and are s ubtracted from 0 degrees to get True North as shown Figure 1.4-2. Declinat ion angles west of True Nor th ar e con-si ...

  • Campbell Manufacturing Weather tation - page 14

    Section 1. Preparation and Siting 1-6 Telephone numbers: Phone Number Baud Rat es 303-273-8672 2400 303-273-8673 1200 303-273-8678 1200 Upon carrier-signal det ection, press Ret urn once or twice. If you are using one of the commercial numbers, the following prompts will appear. Type the responses shown (followed by press ing RETURN): GLDSV1> c ...

  • Campbell Manufacturing Weather tation - page 15

    Section 1. Preparation and Siting 1-7 Exiting: Press "Cntrl-Z" to exit GEOMAG. When the main menu reappears eit her select another option or type "X " to log out. If you used one of the commercial numbers , the GLDSV1> prompt wil l reappear. Type "LO" to disconnect . Use of GEOMAG i s free (except for telephone char ...

  • Campbell Manufacturing Weather tation - page 16

    Section 1. Preparation and Siting 1-8 FIGURE 1.4-3. Dec lination Angles West of True North Are Added to 0 to Get True North ...

  • Campbell Manufacturing Weather tation - page 17

    2- 1 Section 2. TLX106 Tower Installation Do not install near power lines. If any part o f the to wer comes in contact with power lines you could be KILLED. Contact local utilities for t he location of buried utility lines before digging or driving grounding rods. Do not fit the 3 meter TLX106 Tower sections together until the appropriate time. Onc ...

  • Campbell Manufacturing Weather tation - page 18

    Section 2. TLX106 Tower Installation 2-2 2.1 Base Installation 2.1.1 Suppl i e d Components (3) ½ inch L-Bolts (9) ½ inch Nuts (1) Anchor Template Refer to Sect ion 1 for components suppli ed by installer. 2.1.2 Installation 1. The TLX106 Tower attaches to a user supplied concrete foundation constructed as shown in Figure 2.1-2. 2. Construct the ...

  • Campbell Manufacturing Weather tation - page 19

    Section 2. TLX106 Tower Installation 2-3 D TO O OLT O O T D LL T TLT OT O FIGURE 2.1-2. TLX106 T ower Base Installation 2.2 Tower Installation 2.2.1 Suppl i e d Components (1) Upper Tower Section (Tapered) (1) Lower Tower Section (6) ½ inch Was hers (1) 12 foot 12 AWG Ground Cable (1) Tower Cap (1) 20' communications cable (1) 20' power ...

  • Campbell Manufacturing Weather tation - page 20

    Section 2. TLX106 Tower Installation 2-4 4. Cut and save a 9 inch piece of 12 AW G ground wire from the 12 foot length provided. Thread t he remaining 11 foot ground wire through the tower. Secure all w iring so it does not slip back into the tower or conduit . 5. Place the tower cap over the tower end. 6. Raise the tower on a still da y . Place a ...

  • Campbell Manufacturing Weather tation - page 21

    Section 2. TLX106 Tower Installation 2-5 2.3.2 Gr oundi ng Pr ocedure Ground the tower as shown in Figure 2.2-1. 1. Place the ground rod clamp on the rod. Secure it about 3 inches from the top. Do this before t he rod is driven into the ground. Be careful not to damage the clamp with the hammer 2. Taking care not to damage power or communicat ions ...

  • Campbell Manufacturing Weather tation - page 22

    This is a blank page. ...

  • Campbell Manufacturing Weather tation - page 23

    3-1 Section 3. TLX106 Instrumentation Installation The weather station datalogger, power supply, sensor connection panel, communications devices, and data retrieval peripherals are mounted in the TLX106 enclosure at the locations shown in Figure 3-1. Components include: (1) TLX106 Enclosure (1) 4 unit Desiccant Pack (1) Flat Point Screw D river (1) ...

  • Campbell Manufacturing Weather tation - page 24

    Section 3. TLX106 Instr umentation Installation 3-2 3.1 Enclosure, Datalogger, Power Supply 3.1.1 Battery Option Installation S FIGURE 3.1-1. Rec hargeable Power Mounting and Connections a) Sealed Rechargeable Battery Option: Install the kit as shown in Figure 3.1-1. An unregulated sola r panel or 17 to 24 VAC must be us ed with the rechargeable ba ...

  • Campbell Manufacturing Weather tation - page 25

    Section 3. TLX106 Instr umentation Installation 3-3 The solar panel should be oriented to receive maximum insolation over the course of the year. Suggested tilt angles (referenced to the horizontal plane) are listed below. Site Latitude Tilt Angle 0 to 10 degrees 10 degrees 11 to 20 Latitude + 5 degrees 21 to 45 Latitude + 10 degrees 46 to 65 Latit ...

  • Campbell Manufacturing Weather tation - page 26

    Section 3. TLX106 Instr umentation Installation 3-4 O R T H FIGURE 3.1-3. Mounting and G rounding the TLX106 Enclosure c) Slide the enclosure to the top of the TLX106 tower. Position it on the north side of the tow er (northern hemisphere). The top of the enclosure shoul d be flush with the top of t he tower, with the widt h of the sensor arm ext e ...

  • Campbell Manufacturing Weather tation - page 27

    Section 3. TLX106 Instr umentation Installation 3-5 Earth Ground Stand off Connector #4 Sensors TEMP CS615 TEMP RAIN (PRECIP) TEMP / RH SOLAR RADIATION COMM WS/WD SDI 12 GYP BLOCK #2 #6 #7 #5 #1 #3 #8 CS I/O POWER CABLE PORT STAND OFF COAXIAL CONNECTION FIGURE 3.2-1. Pos ition of Sensor Bulkhead Connectors 3) Replace the protective connector cover ...

  • Campbell Manufacturing Weather tation - page 28

    Section 3. TLX106 Instr umentation Installation 3-6 If you received a telecommunications kit separate from the TLX106 Enclosure, follow the "In ternal Installation" pr o cedures outlined b elow. 3.3.1 Phone Modems Phone modems enable communi cations between the TLX106 Encl osure and a Hayes compatibl e modem in your PC over a dedicated ph ...

  • Campbell Manufacturing Weather tation - page 29

    Section 3. TLX106 Instr umentation Installation 3-7 3.3.1.2 External Installation The following modem kit components are used to make the external connections: (1) Direct Burial Splice Kit (1) 20 foot Telephone Pat ch Cord with Connect or 1) Connect t he 20 foot patch cord to the connector marked "comm" on the external back panel, under t ...

  • Campbell Manufacturing Weather tation - page 30

    Section 3. TLX106 Instr umentation Installation 3-8 3. Connect the SC932C 9-pi n port to the internal TLX106 Enclos ure 9-pin port with the bl ue ribbon cable provided. 4. Wire the Rad Modem to the TLX106 Enclos ure with the 12 inch patch cord. Match wire label s to wiring panel la bels on both the TLX106 Enclosure and the Rad Modem (+X MT to +XMT, ...

  • Campbell Manufacturing Weather tation - page 31

    Section 3. TLX106 Instr umentation Installation 3-9 - RCV (white) - RCV (black) + RCV (green) + RCV (red) + XMT (red) + XMT (green) - XMT (black) - XMT (white) - RCV + RCV + XMT - XMT BLACK RED GREEN WHITE 2 1 3 4 - RCV (black) + RCV (red) + XMT (green) - XMT (white) 2 1 3 4 SRM-5A Surge Protector PC User Supplied Cable Splices ET106 ENCLOSURE ET10 ...

  • Campbell Manufacturing Weather tation - page 32

    Section 3. TLX106 Instr umentation Installation 3-10 D O N O T E A T U N IT E D D E S IC C A N T S -G A T E S 101CHRISTINE, BELEN, NEW MEXICO 87002 DESI PAK SPECIFICATION MIL-D-3464 TYPE I &II REACTIVATION TIME IN-BAG 16 HOURS AT 250 F DESICCANT ACTIVATED BAGGED FOR CONTENTS 4 UNITS PACKAGE USE AND STATIC DEHUMIDIFICATION D O N O T E A T U N IT ...

  • Campbell Manufacturing Weather tation - page 33

    4-1 Section 4. TLX106 Sensor Arm Installation 4.1 Components (1) TLX106 Sensor A rm (1) Met One 034A Wi nd Sensor (1) 034A Mounting Shaft (1) Radiatio n Shield 4.2 Installation Install t he TLX106 Sensor Arm after the Encl osure is mounted low on the Tower. You may need to temporari ly remove communications opti on. Mount the sensor arm as shown in ...

  • Campbell Manufacturing Weather tation - page 34

    Section 4. TLX106 Sensor Arm Installation 4-2 4.3 Sensor Connection Refer to Sect ion 3 for sensor connection det ails. 4.4 034A Wind Sensor Installation Install t he 034A Wind Sensor as shown in Figure 4.4-1 afte r the sensor arm is securely instal led. The wind vane is orient ed after the datalogger has been programmed, and the location of True N ...

  • Campbell Manufacturing Weather tation - page 35

    Section 4. TLX106 Sensor Arm Installation 4-3 4.5 RH and Temperature Radiation Shield Mount the radiation s hield to the sens or arm as shown in Figure 4.4-1. Remove yellow cap. Place the RH and temperature ass embly inside the shield shaft. Attach the sh ield to the sensor arm with th e two screws. 4.6 Pyranometer Level the pyranometer as indi cat ...

  • Campbell Manufacturing Weather tation - page 36

    Section 4. TLX106 Sensor Arm Installation 4-4 Input Location Parameter Normal Range 1 Enclosure Close to air Temperature (°C) temperature 3 Solar Radi ation 0 to 1.2 kW m -2 (kW m -2 ) 4 Air Temperature (°C ) -40° to +50° 5 RH (%) 0 t o 100% 6 Wind Speed (mph) 0 to 110 mph 7 Rain Fal l (inches) 0 to .2 8 Wind Di rection (°) 0 to 359 10 Batte r ...

  • Campbell Manufacturing Weather tation - page 37

    Section 4. TLX106 Sensor Arm Installation 4-5 1 2 3 4 5 6 Air T emperature and Relative Humidity Sensor Connector Pin Datalogger Relative Humidity (0-1VDC) Air T emperature (0-1VDC) 12V Switched Supply Not Used Analog Ground Shield 1 2 3 4 5 6 1 H 1 L 12VDC Switched Supply AG G FIGURE 4.8-1. Sc hematic of HMP45C-LC RH and Temperature Probe and Conn ...

  • Campbell Manufacturing Weather tation - page 38

    Section 4. TLX106 Sensor Arm Installation 4-6 Solar Radiation Sensor 40.2 - 90.2 OHM Connector Pin Datalogger 1 3 2 Not Used Not Used Not Used 3 H 3 L G Shield 4 5 6 1 2 3 4 5 6 FIGURE 4.8-3. Sc hematic of LI200X-LC Solar Radiation Sensor and Connector #3 1 Not Used Connector Pin Magnetically Activated Reed Switch Tipping Rain Buck et Not Used Not ...

  • Campbell Manufacturing Weather tation - page 39

    5-1 Section 5. Software Installation and Settings 5.1 Measure Sensors and Process Dat a A pre-written d atalogger program (PN 14079) comes in stalled in the TLX106. This program sets the scan rat e, measures the sens ors, processes inter n ally and stores the data. This program will b e f actory corrected for the station’s latitude, longitude, el ...

  • Campbell Manufacturing Weather tation - page 40

    Section 5 . Software Ins tallation and Settings 5-2 Here again the Comm unications Ena bled button must be selected. Then select the proper M odem Type and zer o out the Extra R esponse Time. Then press Apply and continue to the next s tep. Here again the Communications Ena bled must be selected. Then a dd the appropriate Phone Number . Then zero o ...

  • Campbell Manufacturing Weather tation - page 41

    Section 5 . Software Ins tallation and Settings 5-3 The final terminati on must be t o a CR10X-TD logge r. The Proline wil l default to wor k with a logger named ‘lgr1’, but yo u can change thi s default if you w ant to name you r logger somethin g else. Change the logger name here and then refer to t he RDE extra settings to make sure you chan ...

  • Campbell Manufacturing Weather tation - page 42

    Section 5 . Software Ins tallation and Settings 5-4 If not already s tarted, start t he LoggerNet s erver by double clic king the blue icon. Then start the Cont rol Panel. It should automati cally connect to the server. Then select the appropriate logger an d click on the Connectio n bar. The co m puter sh ould initiate and connect with the station ...

  • Campbell Manufacturing Weather tation - page 43

    Section 5 . Software Ins tallation and Settings 5-5 “ Keep Logger On Line” This is used to force LoggerN et to stay connected to the statio n the entire time the LoggerNet serve r is open. This is desirable when there are short collection intervals. The default sett ings are shown bel ow. The Host is the computer that is running LoggerN et. Thi ...

  • Campbell Manufacturing Weather tation - page 44

    Section 5 . Software Ins tallation and Settings 5-6 Now reopen Net Admin and go to the l ogger previ ously set up. Now we will check to see if the Table Definitions have updated correctly by going to the Data Co llectio n tab. It could look like the following picture. Now select t he Scheduled Collection t ab again. Here you need to enable the sche ...

  • Campbell Manufacturing Weather tation - page 45

    Section 5 . Software Ins tallation and Settings 5-7 5.3 Create Mes sage Perform the fol lowing steps us ing the Mess age Editor provi ded in ProLine So f tware: 1. Type the message in t he area indicated in F igure 5.3-1. 2. Move cursor t o where you want dat a inserted. 3. Select a s ource from the Source pul l-down menu (Fi gure 5.3-2). 4. Select ...

  • Campbell Manufacturing Weather tation - page 46

    Section 5 . Software Ins tallation and Settings 5-8 FIGURE 5. 3-2. The avai lable options provided by the source menu are shown. FIGURE 5 .3-3. When the w eather stat ion sourc e has been chos en, several meteorologic al conditio ns reported i n various un its are provid ed under the field menu. ...

  • Campbell Manufacturing Weather tation - page 47

    6-1 Section 6. Maintenance and Troubleshooting These guidelines apply to several Campbell Scientific weather stations. 6.1 Maintenance Proper maintenance of weather s tation components is essential to obtain accurate data. Equipment must be in good operating condition, which requires a program of regular inspection and mai ntenance. Routine and si ...

  • Campbell Manufacturing Weather tation - page 48

    Section 6. Maintenance and Tr oubleshooting 6-2 6.1.4 Sensor Mai ntenance Sensor maint enance should be performed at regular interval s, depending on the desired accuracy and the conditions of use. A s uggested maintenance schedule is outlined below. 1 w eek • Check the py ranometer f or level and contamination. Gen tly clean, if needed. • Visu ...

  • Campbell Manufacturing Weather tation - page 49

    Section 6. Maintenance and Tr oubleshooting 6-3 2. Punch a very small hole in the bottom of the can. 3. Place the can in the top funnel of the rain gage and pour 16 fluid ounces (1 pint) o f water in to the can. (A 16 oz. so f t drink bottle filled to with in 2.5 inches of the top may be us ed for a rough field calibration. An exact volume will all ...

  • Campbell Manufacturing Weather tation - page 50

    Section 6. Maintenance and Tr oubleshooting 6-4 At the computer: D. Mak e sure the Station File is con f ig ured correctly. E. Check the cable(s) between the serial port and the modem. If cables have not been purchased through Ca mpbell Scientifi c, check for the following configuration us ing an ohm meter: 25-pin serial port: computer end modem en ...

Fabricante Campbell Manufacturing Categoría Weather Radio

Los documentos del dispositivo Campbell Manufacturing Weather tation que obtenemos del fabricante se pueden dividir en varios grupos. Entre ellos están::
- dibujos técnicos Campbell Manufacturing
- manuales de instrucciones Weather tation
- hojas de producto Campbell Manufacturing
- folletos informativos
- o etiquetas energéticas Campbell Manufacturing Weather tation
Todos son importantes, pero lo más importante desde el punto de vista del usuario de un dispositivo lo encontraremos en el manual de instrucciones Campbell Manufacturing Weather tation.

Un conjunto de documentos determinado como manual de instrucciones se divide también en tipos más detallados, tales como: instrucciones de montaje Campbell Manufacturing Weather tation, instrucciones de servicio, instrucciones cortas o instrucciones de usuario Campbell Manufacturing Weather tation. Dependiendo de la situación debes buscar el documento que necesitas. En nuestra página puedes consultar el manual de instrucciones más popular del producto Campbell Manufacturing Weather tation.

Manuales de instrucciones parecidos

El manual de instrucciones del dispositivo Campbell Manufacturing Weather tation, ¿cómo debería ser?
El manual de instrucciones, también determinado como el manual de usuario o simplemente instrucciones, es un documento técnico que tiene como objetivo ayudar a los usuarios a utilizar Campbell Manufacturing Weather tation. Las instrucciones normalmente las realiza un escritor técnico pero en un lenguaje comprensible para todos los usuarios de Campbell Manufacturing Weather tation.

El manual de instrucciones completo de Campbell Manufacturing debe contener unos elementos básicos. Una parte de ellos es menos importante, como por ejemplo: la portada / la página principal o las páginas de autor. Sin embargo, lo demás debe facilitarnos la información más importante desde el punto de vista del usuario.

1. Introducción y pistas sobre cómo orientarse con el manual Campbell Manufacturing Weather tation - Al principio de cada manual se deben encontrar las indicaciones acerca de la manera de usar un manual de instrucciones. Debe contener información sobre dónde encontrar el índice Campbell Manufacturing Weather tation, preguntas frecuentes o problemas más comunes – son los apartados más buscados por los usuarios de cada manual de instrucciones.
2. Índice - listados de todos los consejos acerca de Campbell Manufacturing Weather tation que encontraremos en el documento
3. Consejos de uso de las funciones básicas del dispositivo Campbell Manufacturing Weather tation - que deben facilitarnos los primeros pasos durante el uso de Campbell Manufacturing Weather tation
4. Troubleshooting - una secuencia sistematizada de acciones que nos ayudará a diagnosticar los problemas más importantes con Campbell Manufacturing Weather tation
5. FAQ - las preguntas frecuentes
6. Datos de contacto Información acerca de cómo encontrar los datos de contacto del fabricante / servicio de Campbell Manufacturing Weather tation en cada país si no somos capaces de solucionar el problema por nuestra cuenta.

¿Tienes una pregunta acerca de Campbell Manufacturing Weather tation?

Utiliza el formulario que se encuentra abajo

Si con la ayuda del manual de instrucciones encontrado no has podido solucionar tu problema con Campbell Manufacturing Weather tation, haz una pregunta utilizando el formulario que se encuentra abajo. Si alguno de los usuarios ha tenido un problema parecido con Campbell Manufacturing Weather tation probablemente compartirá una forma de solucionarlo.

Copia el texto de la imagen

Comentarios (0)