    RLC-SVX03A-E4 Fo rewo rd These installation, operation and maintenance instructions are given as a guide to good practice in the installation, putting into service, operation, and maintenance by the user of T rane R TUB and R TCA units. They do not contain full service procedures necessary for the continued successful operation of this equipment; T ...

  • Trane RTUB 207-224 - page 3

    RLC-SVX03A-E4 3 Cont ents Foreword 2 W arranty 2 Reception of unit 2 Cautions and warnings 2 Refrigerant 2 Gener al inf or mation Unit Inspection 5 Inspection Chec klist 5 Loose P arts In ventory 6 Description of the Unit 6 General Data R TUB 7 General Data R TCA 8 Installation Installation Responsibilities 9 Storage 9 Special Lif ting and Moving I ...

  • Trane RTUB 207-224 - page 4

    4 Oper ation Pre-star t Chec kout 21 Unit V oltage P ower Supply 21 Unit V oltage Imbalance 21 Unit V oltage Phasing 21 W ater System Flow Rates 22 W ater System Pressure Drop 22 Daily Unit Star t-up Procedure 22 Seasonal Unit Star t-up Procedure 23 T emporary Shutdown and Restar t 23 Extended Shutdown Procedure 23 System R estart af ter Extended S ...

  • Trane RTUB 207-224 - page 5

    RLC-SVX03A-E4 5 Gener al infor mation This manual describes installation, operation, and maintenance of R TUB and R TCA units. A separate manual is available for the use and maintenance of the R TUB controls (UCM-CLD). Unit Inspection When the unit is delivered, verify that it is the correct unit and that it is property equipped. Compare the inform ...

  • Trane RTUB 207-224 - page 6

    6 • Notify the T rane sales representative and arrange for repair . Do not repair the unit, however , until damage is inspected by the carrier's representative. Loose P arts In ventory Chec k all the accessories and loose parts that are shipped with the unit against the shipping list. Included in these items will be water vessel drain plugs, ...

  • Trane RTUB 207-224 - page 7

    7 T able 1 - General data - R TUB Unit size 207 208 21 0 21 1 212 214 Compressor T ype/quantity Helical rotary/2 Nominal size (tons) 35/35 40/40 50/50 60/50 60/60 70/70 Ev aporator Evaporator Model E G 120 E G 120 EG 1 40 E G 170 E G 170 E G 20 0 W ater Storage (l) 1 05 1 05 365 220 220 20 0 Minimum Flow (l/s) 4.5 4.5 6.0 7 .0 7 .0 9.0 Maximum Flow ...

  • Trane RTUB 207-224 - page 8

    RLC-SVX03A-E4 8 Gener al infor mation T able 2 - General data - R TCA Unit size 1 08 1 09 1 1 1 1 13 1 15 1 16 Condenser Condenser type Aluminium fins/copper tubes Fin spacing (fins/ft) 168 168 144 168 168 1 44 Frontal surface area (m²) 5.7 6.9 6.9 1 1 .3 1 1 .7 13.7 Airflow Standard unit (m 3 /h) 42500 5040 0 6930 0 77200 8470 0 9850 0 Low noise ...

  • Trane RTUB 207-224 - page 9

    RLC-SVX03A-E4 9 Installation r esponsibilities Generally , the contractor must do the following when installing an R TUB/RTCA unit. • Install the units on a flat foundation, level (within 1/4" [6 mm] across the length of the unit), and strong enough to support unit loading. • Install the units per the instructions contained in the Installa ...

  • Trane RTUB 207-224 - page 10

    10 Special Lif ting and Moving Instr uctions A specific lifting method is recommended as follows: 1 . F our lifting points are built into the unit. 2. Slings and spreader bar to be provided by rigger and at tached to the four lifting points. 3. Minimum rated lifting capacity (vertical) of eac h sling and spreader bar shall be no less than the tabul ...

  • Trane RTUB 207-224 - page 11

    11 Installation condensation coils must be protected from side winds when their speed exceeds 16 km/h. P osition the unit above the average height of snow observed in the region where it is installed. Never install temporary or permanent objects (tarp or roof) over the unit, because recycling of hot air would reduce the capacity of the condensation ...

  • Trane RTUB 207-224 - page 12

    12 Drainag e Pro vide a large-capacity drain for water vessel drain-down during shutdown or repair . The evaporator is provided with a drain connection. All local and national codes apply . The vent on the top of the evaporator water bo x is provided to prevent a vacuum, by allowing air into the evaporator for complete drainage. Releasing the Nitr ...

  • Trane RTUB 207-224 - page 13

    13 Follow the manufacturer's instructions for the installation procedures. Flow S witch Installation 1 . Mount the switc h upright, with a minimum of 5 pipe diameters of straight horizontal run on eac h side. Do not install close to elbows, orifices, or valves. Note: The arrow on the switc h must point in the direction of flow. 2. T o prevent ...

  • Trane RTUB 207-224 - page 14

    14 Installation the values given by the pressure gauges, open one valve and close the other . Refr iger ant Saf ety V alv es Disc harge valves are an option for the R TUB. If installation requires this valve to be mounted, it is mandatory to install two safety valves: one between the compressor and the service valve and the other after the service ...

  • Trane RTUB 207-224 - page 15

    15 Installation withstanding high temperatures without degradation.   C C A A U U T T I I O O N N A defect in fixing or insulating the condensation sensors may cause incorrect adjustment and/or damage to the compressor . If the sensor cannot be mounted in the place where the saturated gas enters the sub-cooler , it must be positioned on the s ...

  • Trane RTUB 207-224 - page 16

    16 another manufacturer's condenser in used, operation and performance may be degraded. Depending on the fan settings, malfunctioning may damage the R TUB due to instability of the high pressure. Sound and vibration at tenuating device installation on the disc harge lines is strongly recommended in order to avoid an y acoustical annoyance and ...

  • Trane RTUB 207-224 - page 17

    17 Installation 1 2 Figure 1 1: Units on the same level Limitations: The distance between the two units must not exceed 60 m in reality or the equi valent of 90 m taking into account pressure drops. The height of the liquid line in relation to the unit base must be less than 5 m. It is recommended to place a trap on the disc harge line at the oil s ...

  • Trane RTUB 207-224 - page 18

    18 Installation 3 Figure 13: RTCA (or other manuf actur er's condenser) below the RTUB Limitations: The distance between the two units must not exceed 60 m in reality or the equi valent of 90 m taking into account pressure drops. The height of the liquid line in relation to the condenser base must be less than 5 m. Legend f or Figures 1 1 -12- ...

  • Trane RTUB 207-224 - page 19

    19 Equiv alent pressur e drops T o cor rectly determine the size of the liquid and disc harge lines for connection on site, it is first necessary to establish the equivalent pressure drops for eac h line, comprising the additional flow resistances, from bends, valves, etc. As a first approximation, we can estimate the equivalent pressure drops at 1 ...

  • Trane RTUB 207-224 - page 20

    20 V acuum pumping For this operation, use a vane pump making it possible to obtain a partial vacuum or 1 0 0 microns or less. When pumping out to create a vacuum, it is important to connect the pump to the high and low pressure sides of the system. Follow the pump manufacturer's recommendations. The pipes used to connect the pump to the syste ...

  • Trane RTUB 207-224 - page 21

    21 Pr e-start chec k out Installation Checklist When installation is complete, but prior to putting the unit into service, the following pre-start procedures must be reviewed and verified: • Inspect all wiring connections to be sure they are clean and tight.   W W A A R R N N I I N N G G Disconnect all electric power , including remote disc ...

  • Trane RTUB 207-224 - page 22

    22 Oper ation motor rotation requires confirmation of the electrical phase sequence of the power supply . The motor is internally connected for cloc kwise rotation with the incoming power supply phased A-B-C. When rotation is cloc kwise, the phase sequence is usually called "ABC;" when countercloc kwise, "CBA." This direction ma ...

  • Trane RTUB 207-224 - page 23

    23 operating load. Overheating may vary slightly on the circuit if the system load is lower , when the slide valve is moving. Overheating must stabilize at approximately 4°C when the abo ve components have stabilized. Subcooling Normal subcooling for eac h circuit ranges from 8-1 0°C, depending on the units. If subcooling for either circuit does ...

  • Trane RTUB 207-224 - page 24

    24 Oper ation System Flow R ates" and "W ater - System P ressure Drop." 7 . Adjust the flow switch on the evaporator piping for proper operation. 8. Stop the water pump. The unit is now ready for startup as described in "Startup P rocedures." RLC-SVX03A-E4 ...

  • Trane RTUB 207-224 - page 25

    25 P erform all maintenance procedures and inspections at the recommended intervals. This will prolong the life of the c hiller and minimize the possibility of costly failures. After the unit has been operating for approximately 30 minutes and the system has stabilized, c heck the operating conditions and complete the following procedures: W eekly ...

  • Trane RTUB 207-224 - page 26

    26 For units without disc harge v alve option 1 . Shut of f the compressor and disconnect all electrical service to the compressor . 2. V acuum the refrigerant out of the circuit. 3. Remo ve the seven bolts on the oil filter cover . A pan may be necessary to catc h any oil that is released after the co ver is loosened. 4. Remo ve the cover and the ...

  • Trane RTUB 207-224 - page 27

    27 Follow the steps listed below and refer to the notes listed in Figure 17 . 1 . T urn of f the unit. 2. Attac h the hoses and sight glass to the oil-separator Sc hrader valves, as shown in Figure 17 . Remove non-condensables. 3. After the unit has been of f for 1 0 minutes, move the sight glass up and down until the level can be seen. 4. After th ...

  • Trane RTUB 207-224 - page 28

    28 Some symptoms of an oil under - char ged unit: • Compressor rattle or grinding sound • Lower -than-normal pressure drop through oil system • Seiz ed or W elded Compressors • Low oil-sump level af ter normal shutdown • Lower -than-normal oil concentrations in the evaporator R134a Field-Char ging Pr ocedur e Be certain that the electrica ...

  • Trane RTUB 207-224 - page 29

    29 The evaporator is large enough to hold all the c harge, for any unit, below the centerline of the shell. Therefore, no special precautions are required to restart the unit af ter isolating the c harge in the evaporator . Filter Replacement Pr ocedur e A dirty filter is indicated by a temperature gradient across the filter , corresponding to a pr ...

  • Trane RTUB 207-224 - page 30

    30 F actory (initial) Oil-Charging Procedur e The initial c harging procedure should be followed any time the unit is new or has had all of the oil removed. 1 . Add 0.95 liter (0.90 k g) of oil to the motor cavity or suction line prior to installing the compressor into the c hiller . 2. If the unit is not equipped with suction-line isolation valves ...

  • Trane RTUB 207-224 - page 31

    31 and oil- line shutoff valve, without the need to pull a vacuum on this small volume. If the oil has been in an open container or is otherwise contaminated, then this small volume must be subject to vacuum as well. However , the filter cavity is full of oil. Therefore, be sure to use a flash tank in line with the vacuum pump to ensure that the oi ...

  • Trane RTUB 207-224 - page 32

    T rane has a policy of continuous product and product data improvement and reserves the right to c hange design and specifications without notice. Only qualified technicians should perform the installation and servicing of equipment referred to in this publication. The T rane Compan y An American Standard Company www .trane.com For more information ...

Fabbricante Trane Categoria Air Compressor

I documenti che otteniamo dal fabbricante del dispositivoTrane RTUB 207-224 possono essere suddivisi in diversi gruppi. Questi sono tra gli altri:
- disegni tecnici Trane
- manuali per l’uso RTUB 207-224
- schede prodotto Trane
- opuscoli
- o etichette energetiche Trane RTUB 207-224
Tutti sono importanti, ma le informazioni più importanti dal punto di vista di utilizzo del dispositivo possono essere trovate nel manuale per l’uso Trane RTUB 207-224.

Un gruppo di documenti denominato manuali per l’uso, è anche suddiviso in tipi più specifici, come: Manuali di installazione Trane RTUB 207-224, manuali di manutenzione, brevi manuali o manuali utente Trane RTUB 207-224. A seconda delle esigenze, si dovrebbe cercare il documento necessario. Nel nostro sito web, puoi visualizzare il manuale più popolare per l'uso del prodotto Trane RTUB 207-224.

Manuali per l’uso simili

Manuale completo del dispositivo Trane RTUB 207-224, come deve essere?
Il manuale per l’uso, denominato anche istruzioni per l’uso, o semplicemente il manuale è un documento tecnico progettato per aiutare ad utilizzare Trane RTUB 207-224 dagli utenti. I manuali sono di solito scritti da uno scrittore tecnico, ma in un linguaggio accessibile a tutti gli utenti Trane RTUB 207-224.

Il manuale per l’uso completo Trane, dovrebbe includere vari elementi di base. Alcuni di loro sono meno importanti, come ad esempio: copertina / pagina del titolo o pagina di autore. Tuttavia, la parte rimanente, dovrebbe fornire informazioni importanti dal punto di vista dell'utente.

1. Introduzione e la guida su come utilizzare il manuale Trane RTUB 207-224 - All'inizio di ogni manuale, dovremmo trovare indizi su come utilizzare il documento. Dovrebbe contenere informazioni sulla posizione dell’indice Trane RTUB 207-224, FAQ o i problemi più comuni : i punti che sono più spesso cercati dagli utenti di ogni manuale
2. Indice - elenco di tutti i suggerimenti per Trane RTUB 207-224 che possono essere trovati nel documento corrente
3. Suggerimenti su come utilizzare le funzioni di base del dispositivo Trane RTUB 207-224 - che ci dovrebbe aiutare nei primi passi durante l'uso Trane RTUB 207-224
4. Troubleshooting - sequenza sistematica delle attività che vi aiuterà a diagnosticare e, successivamente, risolvere i problemi più importanti del Trane RTUB 207-224
5. FAQ - domande più frequenti
6. Dettagli di contatto Informazioni su dove cercare il contatto con il fabbricante / servizio Trane RTUB 207-224 in un dato paese, se il problema non può essere risolto da noi stessi.

Hai una domanda su Trane RTUB 207-224?

Utilizza il modulo sottostante

Se non hai risolto il problema con Trane RTUB 207-224 con l'aiuto del manuale che hai trovato, fai una domanda utilizzando il modulo sottostante. Se un utente ha avuto un problema simile con Trane RTUB 207-224 è probabile che voglia condividere il modo di risolverlo.

Riscrivi il testo dall’immagine

Commenti (0)