New Buck Corporation DV23ZCの取扱説明書

33ページ 0.7 mb
ダウンロード

ページに移動 of 33

Summary
  • New Buck Corporation DV23ZC - page 1

    OPERA TIONS MANUAL FOR THE MODEL DV23ZC DIRECT VENT ZERO CLEARANCE GAS FIREPLACE APPROVED FOR MOBILE HOME INSTALLATION W ARNING: If the following information in this manual is not followed exactly, a fire or explosion may result causing property dam age, personal injury, or loss of life. -DO NOT STORE OR USE GASOLINE OR OTHER FLAMMABLE VAP ORS AND ...

  • New Buck Corporation DV23ZC - page 2

    ...

  • New Buck Corporation DV23ZC - page 3

    T ABLE OF CONTENTS Introduction .................................................................................................................. ........ 3 Specifications ................................................................................................................ ....... 3 Installation ......................................... ...

  • New Buck Corporation DV23ZC - page 4

    2 ...

  • New Buck Corporation DV23ZC - page 5

    INTRODUCTION This instruction manual will help you obtain a safe, efficient, dependable installation for your appliance and vent system. Please read and understand these instructions before begi nning your installation. The model DV23ZC is a sealed combustion, air circ ulating gas appliance designed for residential and mobile home applications. The ...

  • New Buck Corporation DV23ZC - page 6

    NOTE: Installation and repair should be perfor med by a qualified service person. The appliance should be inspected annually by a qualified professional se rvice person. More frequent inspections and cleanings may be required due to excessive lint from carpeting, bedding material, pet hair, etc. It is imperative that the c ontrol compartment, burne ...

  • New Buck Corporation DV23ZC - page 7

    GENERAL INFORMA TION LOCATION AND CLEARANCE Make sure your installation location provides adequate co mbustion and ventilation air. In selecting the location, the aes thetic and functi onal uses of the applianc e are primary concerns. However, vent system routing to the exterior and access to the fuel supply are also im portant. Consideration shoul ...

  • New Buck Corporation DV23ZC - page 8

    INST ALLA TION Figure 1 6 ...

  • New Buck Corporation DV23ZC - page 9

    IN TE RIO R V ER TIC AL INSTALLATION WITH A MAXI MUM 4 2' R I SE. NOTE: INTERIOR HORIZONTAL MI NI MUM I NST ALLAT I ON NOTE: Figure 2 NOTE : You may replace or cover this piece of m aterial with a more decorative non-combustible material when the unit is installed. SUPPLIED BY MANUFACTURER SUPPLIED BY MANUFACTURER * * * 7 ...

  • New Buck Corporation DV23ZC - page 10

    8 INST ALLA TION GENERAL INFORMATION Remove the shipping carton. Make sure the unit is not damaged. Lift the top louver and remove three (3) nuts at the upp er left, right, and cente r of the glass frame. Also, open louver at bottom and remove the three (3) nuts. Se t the door aside and pr otect from inadvertent damage. Retain nuts for reassembly. ...

  • New Buck Corporation DV23ZC - page 11

    INST ALLA TION EXTERIOR VENT LOCATIONS and RES TRICTIONS M V K A V B V C B O P E N A B L E FIXED CLOSED FIXED CLOSED V E V V F OPENABLE B V A J B D L B A H I V A G INSIDE CORNER DETAIL V = VENT TERMINAL A = AIR SUPPLY INLET = AREA WHERE TERMINAL IS NOT PERMITTED TERMINATION BOX, LOCATION CHART A. Clearance abov e grade, veranda, porch, deck, or bal ...

  • New Buck Corporation DV23ZC - page 12

    INST ALLA TION NOTE: Direct-Vent (Balanced Flue) applia nces are sensitive to vent co nfigurations. Although this appliance may operate in some in stallations that fall outside th is vent requirement chart, we cannot ensure its performance. Figure 3 18' 12' 0' 6' MINIMUM - MAXIMUM VENT REQU IREMENTS * MINIMUM DISTANCE FROM BEND ...

  • New Buck Corporation DV23ZC - page 13

    INST ALLA TION VENT ASSEMBLY There are two basic types of installations a pproved with your m odel DV23ZC appliance. These are: Horizontal termination (See Figure 5) Vertical termination (See Figure 10) When planning your installation, refe r to Figure 3 to ensure the length of your vent falls into the limits specified in Figu re 3. Al so consult p ...

  • New Buck Corporation DV23ZC - page 14

    INST ALLA TION HORIZONTAL TERMINATION (continued) NOTE:  The horizontal run of vent must be level, or have a 1/4-inch rise for every 1 foot of run toward the termination. Never allow the ve nt to run downward. This could cause high temperatures and may present the possibility of a fire.  A 2" clearance (airspace) MUST be maintained on al ...

  • New Buck Corporation DV23ZC - page 15

    INST ALLA TION HORIZONTAL TERMINATION (continued) Note:  The four wood screws provided should be re placed with appropriate fasteners for stucco, brick, concrete, or other types of siding.  Venting termination shall not be rec essed in to a w all or sid ing. For structures with vinyl siding, a Vinyl Siding Standoff (Part 950) should be instal ...

  • New Buck Corporation DV23ZC - page 16

    INST ALLA TION VERTICAL TERMINATION 1. Set the gas appliance in th e desired location. Drop a plum b bob down from the ceiling to the position of the appliance flue exit, and ma rk the location where the vent will penetrate the ceiling. Drill a small hole at this point. Ne xt, drop a plumb bob from the roof to the hole previously drilled in the cei ...

  • New Buck Corporation DV23ZC - page 17

    INST ALLA TION VERTICAL TERMINATION (continued) 5. Slip the flashing over the Pipe Section(s) protru ding through the roof. S ecure the b ase of the Flashing to the roof with roofing nails. Ensure the roofing materials overlap the top edge of the Flashing as shown in Figure 12. Verify th at you have at least th e minim um clearance to combustibles ...

  • New Buck Corporation DV23ZC - page 18

    INST ALLA TION VERTICAL TERMINATION (continued) NOTES:  Use only 45 degree elbows. Use of 90 degree elbows is not allowed in ver tical terminations. The 45 degree elbows offer less restriction to the flow of flue ga ses and intake air.  For multi-story vertical in stallations, a Ceiling Firestop, (S im pson-Dura-Vent, Part 963) is required at ...

  • New Buck Corporation DV23ZC - page 19

    INST ALLA TION HIGH ALTITUDE This unit is approved in Canada for altitude from 0 to 2,000 ft. (0 to 600m) (Can 2.17-M90) with the main burner orifice supplied. For inst allations above 2,000 feet, follow current CAN/CGA-B149.1 and B149.2. In the USA refer to ANSI Z223.1 — latest edition, Appendix F, for resizing the orifice. At altitudes greater ...

  • New Buck Corporation DV23ZC - page 20

    INST ALLA TION GAS VALVE CONNECTION The gas control valve is locate d behind the lower grill. The control valve has a 3/8" NPT threaded inlet port. Secure all joints tightly using appropriate tools and sealing compound. Leak-check the installation with a soapy water so lution or el ectronic leak detec t or. DO NOT USE OPEN FLAME FOR LEAK TEST. ...

  • New Buck Corporation DV23ZC - page 21

    OPERA TION OPERA TING INSTRUCTIONS Before operating this appliance, proceed throug h the following checklist. 1. Read and understand these instructi ons before operating this appliance. 2. Check that there are no gas leaks. If you sm ell gas do not attempt to light this appliance. 3. Verify that log placement is correct. LIGHTING INSTRUCTIONS SIT - ...

  • New Buck Corporation DV23ZC - page 22

    LIGHTING INSTRUCTIONS 1. STOP! Read the safety information on page 19. 2. Make sure manual shutoff valve is fully open. 3. Turn off all electrical power to the appliance. Open access door. 4. Turn control knob clockwise ¬ to the “OFF” position. Figure 16 5. Wait five (5) minutes to clear out any ga s. Then sm ell for gas, including near the fl ...

  • New Buck Corporation DV23ZC - page 23

    NOTE: IF pilot goes out, repeat steps 4 through 10. Wait five (5) minutes before attempting to light pilot aga in. 9. Turn control knob counterclockwise « to “ON” position. 10. If using unit without wall therm ostat place “Auto/Off/Manual” switch into the “Manual” position. If using wall therm o stat place “Auto/Off/Manual” Switch ...

  • New Buck Corporation DV23ZC - page 24

    LOG INST ALLA TION 1. You must first unfold the left and right log support tabs. These tabs are folded down for shipping and must be unfolded before the rear l og is put into place. 2. Place the rear log #1 on the back side of the burner base, flat side toward the rear of the firebox. 3. Take the middle log #2, Grasp it by both ends with ember burn ...

  • New Buck Corporation DV23ZC - page 25

    OPERA TION PILOT AND FLAME Your appliance is equipped with a standing pilot to ensure proper burner i gnition. It is visible by looking over the top of the mi ddle log 6" from the right side. W hile igniting, the flame should impinge on the lighting port tube between the rear and mi ddle burner, which ignites the front and rear burner. When bu ...

  • New Buck Corporation DV23ZC - page 26

    OPTIONAL ROOM AIR BLOWER WIRING DIAGRAM CAUTION: LABEL ALL WIRES PRIOR TO DISCONNECTING WHEN SERVICING CONTROLS. WIRING ERRORS CA N CAUSE I MPROPER AND DANGEROUS OPERATION. VERIFY PROPE R OPERATION AFTER SERVICING. THE APPLIANCE, WHEN INSTALLED, MUST BE ELECTRI CALLY GROUNDED IN ACCORDANCE WITH LOCAL CODES, OR IN THE ABSENCE OF LOCAL CODES, WITH TH ...

  • New Buck Corporation DV23ZC - page 27

    ACCESSORIES OR OPTIONS This unit is equipped with a millivolt system which enables you to choose from many of the convenient options available. 1. Remote control with built in room therm ometer. 2. Wall Switch. 3. Wall Thermostat. O U T L T O I P I N O U T L T O I P I N VALVE PIEZO PILOT ROCKER SWITCH REMOTE CONTROL EYE Figure 21 25 ...

  • New Buck Corporation DV23ZC - page 28

    MAINTENANCE GENERAL MAINTENANCE Annual maintenance of the unit is required. We recommend that the fo llowing procedures be performed each year by your fireplace dealer. Clean all lint and dust build-up around the control valve and air shutter of the ventu ri. Inspect and clean with a vacuum cleaner around the vent uri for any spider webs or lint ac ...

  • New Buck Corporation DV23ZC - page 29

    SER VICING Repair and replacement work should onl y be done by a qualified service person. Always shut off the gas supply and make sure th at heater is cool before beginning any service operation. Always check for gas leaks after servicing. REPLACEMENT P AR TS A parts list with exploded view follows. Always include correct name, part number, and mo ...

  • New Buck Corporation DV23ZC - page 30

    REPLACEMENT P AR TS Figure 22 16 28 ...

  • New Buck Corporation DV23ZC - page 31

    ADDITIONAL REPLACEMENT P AR TS PART DESCRI PTION PART NUMBER *MOTOR PE SBR084 *RHEOSTAT PE BC204 *RHEOSTAT KNOB PE BC204A *THERMOSTAT 140 DEG. PE 400130 *THERMOSTAT WIRES PE 30JUMPER FRONT LOUVER ASSEMBLY T O P & B O T T O M P O D V 2 3 F G DOOR GLASS PG DV2341 DOOR GLASS GASKET TAD POLE (W/ADHESIVE) RP GT716B11 5 P I E C E L O G S E T P O 2 3 ...

  • New Buck Corporation DV23ZC - page 32

    W ARRANTY LIMITED FOUR YEAR WARRANTY FOR THE BUCK STOVE AND RELATED PR ODUCTS PLEASE READ THIS WARRANTY CAREFULLY This warranty covers your new heating unit, so long as it is owned by the original purchaser, including optional and standard accesso ries purch ased at the same tim e, subject to terms, limitations, and conditions herein set out.To m a ...

  • New Buck Corporation DV23ZC - page 33

    (D) All warranty repairs under this warranty must be performed by an authorized Buck Stove service representative. Repairs or attempted repairs by anyone other than an author- ized service representative are not covered under this warranty. In addition, these unauthorized repairs may result in additional malfunctions, the correction of which is not ...

メーカー New Buck Corporation カテゴリー Indoor Fireplace

New Buck Corporation DV23ZCのメーカーから受け取ることができるドキュメントは、いくつかのグループに分けられます。その一部は次の通りです:
- #BRANDの図面#
- DV23ZCの取扱説明書
- New Buck Corporationの製品カード
- パンフレット
- またはNew Buck Corporation DV23ZCの消費電力シール
それらは全部重要ですが、デバイス使用の観点から最も重要な情報は、New Buck Corporation DV23ZCの取扱説明書に含まれています。

取扱説明書と呼ばれる文書のグループは、New Buck Corporation DV23ZCの取り付け説明書、サービスマニュアル、簡易説明書、またはNew Buck Corporation DV23ZCのユーザーマニュアル等、より具体的なカテゴリーに分類されます。ご必要に応じてドキュメントを検索しましょう。私たちのウェブサイトでは、New Buck Corporation DV23ZCの製品を使用するにあたって最も人気のある説明書を閲覧できます。

関連する取扱説明書

New Buck Corporation DV23ZCデバイスの取扱説明書はどのようなものですか?
取扱説明書は、ユーザーマニュアル又は単に「マニュアル」とも呼ばれ、ユーザーがNew Buck Corporation DV23ZCを使用するのを助ける技術的文書のことです。説明書は通常、全てのNew Buck Corporation DV23ZCユーザーが容易に理解できる文章にて書かれており、その作成者はその分野の専門家です。

New Buck Corporationの取扱説明書には、基本的な要素が記載されているはずです。その一部は、カバー/タイトルページ、著作権ページ等、比較的重要度の低いものです。ですが、その他の部分には、ユーザーにとって重要な情報が記載されているはずです。

1. New Buck Corporation DV23ZCの説明書の概要と使用方法。説明書にはまず、その閲覧方法に関する手引きが書かれているはずです。そこにははNew Buck Corporation DV23ZCの目次に関する情報やよくある質問、最も一般的な問題に関する情報を見つけられるはずです。つまり、それらはユーザーが取扱説明書に最も期待する情報なのです。
2. 目次。New Buck Corporation DV23ZCに関してこのドキュメントで見つけることができる全てのヒントの目次
3. New Buck Corporation DV23ZCデバイスの基本機能を使うにあたってのヒント。 New Buck Corporation DV23ZCのユーザーが使い始めるのを助けてくれるはずです。
4. トラブルシューティング。New Buck Corporation DV23ZCに関する最も重要な問題を診断し、解決するために役立つ体系化された手続き
5. FAQ。よくある質問
6. 連絡先。一人では問題を解決できない場合に、その国におけるNew Buck Corporation DV23ZCのメーカー/サービスへの連絡先に関する情報。

New Buck Corporation DV23ZCについてご質問がありますか?

次のフォームを使用してください

見つけた説明書を読んでもNew Buck Corporation DV23ZCの問題を解決できない場合、下記のフォームを使用して質問をしましょう。ユーザーのどなたかがNew Buck Corporation DV23ZCで同様の問題を抱えていた場合、その解決方法を共有したいと考えるかもしれません。

画像のテキストを入力してください

コメント (0)