    D-40 (Gas DSI/HSI/Electric/Steam/Phase 7 with S.A.F.E.) Installation Manual For replacement parts, contact the reseller from which the dryer was purchased or American Dryer Corporation 88 Currant Road Fall River MA 02720-4781 Telephone: (508) 678-9000 / Fax: (508) 678-9447 e-mail: techsupport@amdry.com www.amdry.com WARNING: For your safety the inf ...

  • American Dryer Corp. Gas DSI/HSI/Electric/Steam/Phase 7 with S.A.F.E. D-40 - page 2

    D-40 Retain This Manual In A Safe Place For Future Reference American Dryer Corporation products embody advanced concepts in engineering, design, and safety. If this product is properly maintained, it will provide many years of safe, efficient, and trouble-free operation. ONLY qualified technicians should service this equipment. OBSERVE ALL SAFETY ...

  • American Dryer Corp. Gas DSI/HSI/Electric/Steam/Phase 7 with S.A.F.E. D-40 - page 3

    IMPORTANT YOU MUST DISCONNECT AND LOCKOUT THE ELECTRIC SUPPLY AND THE GAS SUPPLY OR THE STEAM SUPPLY BEFORE ANY COVERS OR GUARDS ARE REMOVED FROM THE MACHINE TO ALLOW ACCESS FOR CLEANING, ADJUSTING, INSTALLATION, OR TESTING OF ANY EQUIPMENT PER OSHA (Occupational Safety and Health Administration) STANDARDS. CHILDREN SHOULD NOT BE ALLOWED TO PLAY ON ...

  • American Dryer Corp. Gas DSI/HSI/Electric/Steam/Phase 7 with S.A.F.E. D-40 - page 4

    WARNING The dryer must never be operated with any of the back guards, outer tops, or service panels removed. PERSONAL INJURY OR FIRE COULD RESULT. IMPORTANT PLEASE OBSERVE ALL SAFETY PRECAUTIONS displayed on the equipment and/ or specified in the installation manual included with the dryer. Dryers must not be installed or stored in an area where it ...

  • American Dryer Corp. Gas DSI/HSI/Electric/Steam/Phase 7 with S.A.F.E. D-40 - page 5

    SECTION I IMPORTANT INFORMATION .......................................................................... 3 A. Receiving and Handling ............................................................................................................... 3 B. Safety Precautions ............................................................................... ...

  • American Dryer Corp. Gas DSI/HSI/Electric/Steam/Phase 7 with S.A.F.E. D-40 - page 6

    SECTION VI ROUTINE MAINTENANCE ............................................................................ 42 A. Cleaning ................................................................................................................................... 42 B. Adjustments ............................................................................. ...

  • American Dryer Corp. Gas DSI/HSI/Electric/Steam/Phase 7 with S.A.F.E. D-40 - page 7

    3 SECTION I IMPOR T ANT INFORMA TION A. RECEIVING AND HANDLING The dryer is shipped in a protective stretch wrap cover with protective cardboard corners and top cover (or optional box) as a means of preventing damage in transit. Upon delivery, the dryer and packaging, and wooden skid should be visually inspected for shipping damage. If any damage w ...

  • American Dryer Corp. Gas DSI/HSI/Electric/Steam/Phase 7 with S.A.F.E. D-40 - page 8

    4 B. SAFETY PRECAUTIONS WARNING: For your safety, the information in this manual must be followed to minimize the risk of fire or explosion or to prevent property damage, personal injury, or loss of life. WARNING: The dryer must never be operated with any of the back guards, outer tops, or service panels removed. PERSONAL INJURY OR FIRE COULD RESUL ...

  • American Dryer Corp. Gas DSI/HSI/Electric/Steam/Phase 7 with S.A.F.E. D-40 - page 9

    5 WARNING: DO NOT dry mop heads. Contamination by wax or flammable solvents will create a fire hazard. WARNING: DO NOT use heat for drying articles that contain plastic, foam, sponge rubber, or similarly textured rubber materials. Drying in a heated basket (tumbler) may damage plastics or rubber and also may be a fire hazard. 7. A program should be ...

  • American Dryer Corp. Gas DSI/HSI/Electric/Steam/Phase 7 with S.A.F.E. D-40 - page 10

    6 SECTION II SPECIFICA TIONS A. SPECIFICA TIONS * D-40 reversing dryer available with 3-phase (3ø) 1/2 HP (0.373 kw) motors standard. ** Size of piping to dryer varies with installation conditions. Contact factory for assistance. *** Contact factory for information not listed, 3-phase (3ø) figures shown are for 3-wire service. **** Specify air-op ...

  • American Dryer Corp. Gas DSI/HSI/Electric/Steam/Phase 7 with S.A.F.E. D-40 - page 11

    7 NOTE: ADC reserves the right to make changes in specifications at any time without notice or obligation. Specifications ...

  • American Dryer Corp. Gas DSI/HSI/Electric/Steam/Phase 7 with S.A.F.E. D-40 - page 12

    8 SECTION III INST ALLA TION PROCEDURES Installation should be performed by competent technicians in accordance with local and state codes. In the absence of these codes, the installation must conform to applicable American National Standards: ANSI Z223.1- LATEST EDITION (National Fuel Gas Code) or ANSI/NFPA NO. 70-LATEST EDITION (National Electric ...

  • American Dryer Corp. Gas DSI/HSI/Electric/Steam/Phase 7 with S.A.F.E. D-40 - page 13

    9 B. LOCA TION REQUIREMENTS Before installing the dryer, be sure the location conforms to local codes and ordinances. In the absence of such codes or ordinances the location must conform with the National Fuel Gas Code ANSI.Z223.1 LATEST EDITION, or in Canada, the installation must conform to applicable Canadian Standards: CAN/CGA-B149.1- M91 (Natu ...

  • American Dryer Corp. Gas DSI/HSI/Electric/Steam/Phase 7 with S.A.F.E. D-40 - page 14

    10 C. DR YER ENCLOSURE REQUIREMENTS Bulkheads and partitions should be made of noncombustible materials and must be located a minimum of 12-inches (30.48 cm) above the dryer’s outer top; 18-inches (45.72 cm) for steam dryers, except along the front of the dryer, which may be closed if desired. NOTE: Allowances must be made for opening the control ...

  • American Dryer Corp. Gas DSI/HSI/Electric/Steam/Phase 7 with S.A.F.E. D-40 - page 15

    11 D. FRESH AIR SUPPL Y REQUIREMENTS The D-40 air supply (make-up air) must be given careful consideration to assure proper performance of each dryer. An unrestricted source of air is necessary for each dryer. As a general rule, an unrestricted air entrance from the outdoors (atmosphere) of a minimum of 1-1/2 square feet (0.14 square meters) is req ...

  • American Dryer Corp. Gas DSI/HSI/Electric/Steam/Phase 7 with S.A.F.E. D-40 - page 16

    12 E. EXHAUST REQUIREMENTS Exhaust ductwork should be designed and installed by a qualified professional. Improperly sized ductwork will create excessive back pressure which results in slow drying, increased use of energy, and shutdown of the burner by the airflow (sail) switch, burner hi-limits, or lint chamber hi-limit protector thermostat. The d ...

  • American Dryer Corp. Gas DSI/HSI/Electric/Steam/Phase 7 with S.A.F.E. D-40 - page 17

    13 SINGLE DR YER VENTING IMPORTANT: For exhaust duct runs over 20 feet (6.1 meters) a minimum size of 10-inches (25.4 cm) must be used. HORIZONT AL VENTING When a single 8-inch (20.32 cm) horizontal vent is used, the ductwork to the outlet cannot exceed 20 feet (6.1 meters), refer to Illus. A below . This calculation of 20 feet (6.1 meters) compens ...

  • American Dryer Corp. Gas DSI/HSI/Electric/Steam/Phase 7 with S.A.F.E. D-40 - page 18

    14 VER TICAL VENTING When vertical single 10-inch (25.4 cm) venting is used (refer to Illus. B below ), the ductwork from the dryer to the outside outlet cannot exceed 40 feet (12.19 meters). This calculation compensates for the use of a maximum of three (3) elbows including the two (2) elbows creating the 180° (turned downward) outside outlet. Il ...

  • American Dryer Corp. Gas DSI/HSI/Electric/Steam/Phase 7 with S.A.F.E. D-40 - page 19

    15 MUL TIPLE DR YER (COMMON) VENTING If it is not feasible to provide separate exhaust ducts for each dryer, ducts for individual dryers may be channeled into a common main duct. Each dryer is provided with a back draft damper. The individual ducts should enter the bottom or side of the main duct at an angle not more than 45° in the direction of t ...

  • American Dryer Corp. Gas DSI/HSI/Electric/Steam/Phase 7 with S.A.F.E. D-40 - page 20

    16 HORIZONT AL VENTING Illus. C VER TICAL VENTING Illus. D ...

  • American Dryer Corp. Gas DSI/HSI/Electric/Steam/Phase 7 with S.A.F.E. D-40 - page 21

    17 IMPOR T ANT VENTING REMINDERS 1. Ductwork size and installation should be done by a qualified professional. 2. The dryer must be exhausted to the outdoors. 3. Ductwork should be routed as short as possible to the outdoors with as few elbows as possible. 4. Avoid 90° turns, use 30° or 45° turns instead. 5. The size of the ductwork must be a mi ...

  • American Dryer Corp. Gas DSI/HSI/Electric/Steam/Phase 7 with S.A.F.E. D-40 - page 22

    18 F . ELECTRICAL INFORMA TION 1. Electrical Requirements It is your responsibility to have ALL electrical connections made by a properly licensed and competent electrician to assure that the electrical installation is adequate and conforms to local and state regulations or codes. In the absence of such codes, ALL electrical connections, materials, ...

  • American Dryer Corp. Gas DSI/HSI/Electric/Steam/Phase 7 with S.A.F.E. D-40 - page 23

    19 2) Electric Models ONLY ALL electrically heated dryers must be connected to the electric service shown on the dryer’s data label, which is affixed to the left side panel area behind the top control (access) door. The connecting wires must be properly sized to handle the rated current. NOTE: Electrically heated service (amperage) specifications ...

  • American Dryer Corp. Gas DSI/HSI/Electric/Steam/Phase 7 with S.A.F.E. D-40 - page 24

    20 If local codes permit, power to the dryer can be made by the use of a flexible U.L. listed power cord or pigtail (wire size must conform to rating of dryer), or the dryer can be hard wired directly to the service breaker panel. In both cases, a strain relief must be installed where the wiring enters the dryer. SINGLE-PHASE (1Ø) ELECTRICAL CONNE ...

  • American Dryer Corp. Gas DSI/HSI/Electric/Steam/Phase 7 with S.A.F.E. D-40 - page 25

    21 5. 3-Phase (3ø) Wiring Connections/Hookup The only electrical input connections to the dryer are the 3-phase (3ø) power leads (L1, L2, L3, and sometimes Neutral) and ground. Single-phase (1ø) power for the control circuit is done internally to the dryer. No single-phase (1ø) input connection is required on a 3-phase (3ø) dryer. IMPORTANT: A ...

  • American Dryer Corp. Gas DSI/HSI/Electric/Steam/Phase 7 with S.A.F.E. D-40 - page 26

    22 CAUTION: The dryer must be grounded. A ground lug has been provided for this purpose. IMPORTANT: A CIRCUIT SER VICING EACH DR YER MUST BE PROVIDED. The only electrical connections to the dryer are the 3-phase (3ø) leads (L1, L2, L3, and sometimes Neutral) and ground. Single-phase (1ø) power for the control circuit is done by the factory at the ...

  • American Dryer Corp. Gas DSI/HSI/Electric/Steam/Phase 7 with S.A.F.E. D-40 - page 27

    23 IMPORTANT: Figures shown are for non-reversing models only. For reversing models contact the factory. IMPORTANT: The dryer must be connected to the electric supply shown on the data label that is affixed to the left side panel area behind the top control (access) door. In the case of 208 VAC or 240 VAC, the supply voltage must match the electric ...

  • American Dryer Corp. Gas DSI/HSI/Electric/Steam/Phase 7 with S.A.F.E. D-40 - page 28

    24 G . GAS INFORMA TION It is your responsibility to have ALL plumbing connections made by a qualified professional to assure that the gas plumbing installation is adequate and conforms to local and state regulations or codes. In the absence of such codes, ALL plumbing connections, materials, and workmanship must conform to the applicable requireme ...

  • American Dryer Corp. Gas DSI/HSI/Electric/Steam/Phase 7 with S.A.F.E. D-40 - page 29

    25 2. Technical Gas Data a. Gas Specifications *Measured at outlet side of gas valve pressure tap when gas valve is on. b. Gas Connections Inlet connection ------------- 1/2” N.P.T. Inlet supply size ------------- 1/2” N.P.T. (minimum) Heat input (per dryer) ------ 100,000 btu/hr (25,200 kcal/hr) 1) Natural Gas Regulation is controlled by the d ...

  • American Dryer Corp. Gas DSI/HSI/Electric/Steam/Phase 7 with S.A.F.E. D-40 - page 30

    26 3. Piping Connections ALL components/materials must conform to National Fuel Gas Code Specifications ANSI Z223.1-LATEST EDITION, or in Canada, CAN/CGA-B149.1-M91 (Natural Gas) or CAN/CGA-B149.2-M91 (Liquid Propane [L.P.] Gas) or LATEST EDITION (for General Installation and Gas Plumbing), as well as local codes and ordinances and must be done by ...

  • American Dryer Corp. Gas DSI/HSI/Electric/Steam/Phase 7 with S.A.F.E. D-40 - page 31

    27 Consistent gas pressure is essential at ALL gas connections. It is recommended that a 3/4-inch (19.05 mm) pipe gas loop be installed in the supply line servicing a bank of dryers. An in-line pressure regulator must be installed in the gas supply line (header) if the (natural) gas pressure exceeds 12.0 inches (29.9 mb) of water column (W.C.) pres ...

  • American Dryer Corp. Gas DSI/HSI/Electric/Steam/Phase 7 with S.A.F.E. D-40 - page 32

    28 H. STEAM INFORMA TION It is your responsibility to have ALL plumbing connections made by a qualified professional to assure that the steam plumbing installation is adequate and conforms with local and state regulations or codes. Care must be exercised when leveling steam dryers into final position. After leveling the dryer, check the downward pi ...

  • American Dryer Corp. Gas DSI/HSI/Electric/Steam/Phase 7 with S.A.F.E. D-40 - page 33

    29 a. The pressure of the condensate in the steam supply line will cause water hammer and subsequent heat exchanger (steam coil) failure. The steam supply connection into the main supply line must be made with a minimum 10-inch (25.4 cm) riser. This will prevent any condensate from draining towards the dryer. b. The steam supply line to the dryer m ...

  • American Dryer Corp. Gas DSI/HSI/Electric/Steam/Phase 7 with S.A.F.E. D-40 - page 34

    30 4. Steam Damper Air System Connections This dryer is manufactured with a pneumatic (piston) damper system, which requires an external supply of compressed air. The air connection is made to the steam damper solenoid valve, which is located at the rear inner top area of the dryer just in front of the electric service relay box. a. Air Requirement ...

  • American Dryer Corp. Gas DSI/HSI/Electric/Steam/Phase 7 with S.A.F.E. D-40 - page 35

    31 5. Steam Damper System Operation The steam damper, as shown in the illustration below , allows the coil to stay constantly charged eliminating repeated expansion and contraction. When the damper is opened, the air immediately passes through the already hot coil, providing instant heat to start the drying process. When the damper is closed, ambie ...

  • American Dryer Corp. Gas DSI/HSI/Electric/Steam/Phase 7 with S.A.F.E. D-40 - page 36

    32 6. Steam Damper Air Piston (Flow Control) Operation Adjustment Damper operation was tested and adjusted prior to shipping at 80 PSI (5.51 bars). If damper air adjustment is necessary, locate the flow control valve and make the necessary adjustments as noted below. ...

  • American Dryer Corp. Gas DSI/HSI/Electric/Steam/Phase 7 with S.A.F.E. D-40 - page 37

    33 I. PREP ARA TION FOR OPERA TION/ST AR T -UP The following items should be checked before attempting to operate the dryer: 1. Read ALL “ CAUTION ,” “ WARNING ,” and “ DIRECTION ” labels attached to the dryer. 2. Check incoming supply voltage to be sure that it is the same as indicated on the dryer data label affixed to the left side p ...

  • American Dryer Corp. Gas DSI/HSI/Electric/Steam/Phase 7 with S.A.F.E. D-40 - page 38

    34 J. PREOPERA TIONAL TESTS ALL dryers are thoroughly tested and inspected before leaving the factory. However, a preoperational test should be performed before the dryer is publicly used. It is possible that adjustments have changed in transit or due to marginal location (installation) conditions. 1. Turn on electric power to the dryer. 2. Refer t ...

  • American Dryer Corp. Gas DSI/HSI/Electric/Steam/Phase 7 with S.A.F.E. D-40 - page 39

    35 5. Make a complete operational check of ALL operating controls. NOTE: If computer program changes are required, refer to the computer programming section of the manual supplied with the dryer. 6. The dryer should be operated through one (1) complete cycle to assure that no further adjustments are necessary and that ALL components are functioning ...

  • American Dryer Corp. Gas DSI/HSI/Electric/Steam/Phase 7 with S.A.F.E. D-40 - page 40

    36 NOTES: 1. If the Anti-Wrinkle program is active, the light emitting diode (L.E.D.) display will continue to read “donE,” and the microprocessor controller (computer) will proceed through the Anti-Wrinkle program until the maximum “Active Guard Time” has expired or until the door i s opened, whichever comes first. The L.E.D. display will ...

  • American Dryer Corp. Gas DSI/HSI/Electric/Steam/Phase 7 with S.A.F.E. D-40 - page 41

    37 IMPORTANT: If the door is opened during a cycle, both the heat and motor will stop. However, the microprocessor controller (computer) will continue to count the time, either upward or downward, depending on which parameter is programmed. Continuation of the cycle will resume only after the door has been closed and any other of the three (3) temp ...

  • American Dryer Corp. Gas DSI/HSI/Electric/Steam/Phase 7 with S.A.F.E. D-40 - page 42

    38 NOTE: Pressing keyboard (touch pad) key “A”, “B”, “C”, “D”, and “F” will also start the dryer. The six (6) preprogrammed drying cycles “A” through “F” have been stored in the microprocessor controller (computer) memory. Refer to the Programming Manual supplied with the dryer for more specific operating instructions. N ...

  • American Dryer Corp. Gas DSI/HSI/Electric/Steam/Phase 7 with S.A.F.E. D-40 - page 43

    39 SECTION IV SER VICE/P AR TS INFORMA TION A. SER VICE 1. Service must be performed by a qualified trained technician, service agency, or gas supplier. If service is required, contact the reseller from whom the ADC equipment was purchased. If the reseller cannot be contacted or is unknown, contact the ADC Service Department for a reseller in your ...

  • American Dryer Corp. Gas DSI/HSI/Electric/Steam/Phase 7 with S.A.F.E. D-40 - page 44

    40 SECTION V W ARRANTY INFORMA TION A. RETURNING WARRANTY CARDS 1. Before any dryer leaves the ADC factory test area, a warranty card is placed on the back side of the main door glass. These warranty cards are intended to serve the customer where we record the individual installation date and warranty information to better serve you should you file ...

  • American Dryer Corp. Gas DSI/HSI/Electric/Steam/Phase 7 with S.A.F.E. D-40 - page 45

    41 2. Each part must be tagged with the following information: a. Model number and serial number of the dryer from which part was removed. b. Nature of failure (be specific). c. Date of dryer installation. d. Date of part failure. e. Specify whether the part(s) being returned is for a replacement, a credit, or a refund. NOTE: If a part is marked fo ...

  • American Dryer Corp. Gas DSI/HSI/Electric/Steam/Phase 7 with S.A.F.E. D-40 - page 46

    42 SECTION VI ROUTINE MAINTENANCE A. CLEANING A program and/or schedule should be established for periodic inspection, cleaning, and removal of lint from various areas of the dryer, as well as throughout the ductwork system. The frequency of cleaning can best be determined from experience at each location. Maximum operating efficiency is dependent ...

  • American Dryer Corp. Gas DSI/HSI/Electric/Steam/Phase 7 with S.A.F.E. D-40 - page 47

    43 STEAM DRYERS Clean the steam coil fins. We suggest using compressed air and a vacuum cleaner with brush attachment. WARNING: When cleaning steam coil fins, be careful not to bend the fins. If fins are bent, straighten by using a fin comb, which is available from local air conditioning supply houses. 90 DAYS Inspect and remove lint accumulation i ...

  • American Dryer Corp. Gas DSI/HSI/Electric/Steam/Phase 7 with S.A.F.E. D-40 - page 48

    44 D. LINT DRA WER REMOV AL To remove the lint drawer from the dryer pull drawer out approximately halfway. Rotate/move lint drawer stop hinge (refer to the illustration below ) downward and pull the drawer out. IMPORTANT: After replacing the lint drawer back into the dryer, be sure to rotate/move hinge back to the upward stop position. ...

  • American Dryer Corp. Gas DSI/HSI/Electric/Steam/Phase 7 with S.A.F.E. D-40 - page 49

    45 SECTION VII DA T A LABEL INFORMA TION A. DA T A LABEL Contact American Dryer Corporation When contacting American Dryer Corporation certain information is required to insure proper service/parts information from ADC . This information is on the data label affixed to the left side panel area behind the top control (access) door. When contacting A ...

  • American Dryer Corp. Gas DSI/HSI/Electric/Steam/Phase 7 with S.A.F.E. D-40 - page 50

    46 THE DATA LABEL 1. MODEL NUMBER The model number is an ADC number, which describes the size of the dryer and the type of heat (gas, electric, or steam). 2. SERIAL NUMBER The serial number allows ADC to gather information on your particular dryer. 3. MANUFACTURING CODE NUMBER The manufacturing code number is a number issued by ADC, which describes ...

  • American Dryer Corp. Gas DSI/HSI/Electric/Steam/Phase 7 with S.A.F.E. D-40 - page 51

    47 SECTION VIII REVERSING TIMER SPIN/DWELL ADJUSTMENTS Dual timer models with “reversing option” have an electric reversing timer in the electric service box, which is located in the upper rear area of the dryer. Both the dwell (stop) time and basket (tumbler) spin time are adjustable by mode selection switches located on the electronic timer ( ...

  • American Dryer Corp. Gas DSI/HSI/Electric/Steam/Phase 7 with S.A.F.E. D-40 - page 52

    48 SECTION IX PROCEDURE FOR FUNCTIONAL CHECK OF REPLACEMENT COMPONENTS 1. Microprocessor Controller (Computer) Board a. Upon completing installation of the replacement microprocessor controller (computer) board, reestablish power to the dryer. b. Start the drying cycle. c. Verify that the applicable indicator lights on the back side of the micropro ...

  • American Dryer Corp. Gas DSI/HSI/Electric/Steam/Phase 7 with S.A.F.E. D-40 - page 53

    49 2. For Heat Control Module Ignition Circuit a. For Models With Johnson Controls Direct Spark Ignition (DSI) Module (G760) Theory Of Operation: Start the drying cycle. When the gas burner ignites within the chosen trial for ignition time (6-seconds), the flame sensor detects gas burner flame and signals the DSI module to keep the gas valve open.. ...

  • American Dryer Corp. Gas DSI/HSI/Electric/Steam/Phase 7 with S.A.F.E. D-40 - page 54

    50 F.S.S. In Action The exclusive Fire Suppression System (F.S.S.) will extinguish fires that may start in the drying basket (tumbler). A series of sensors positioned throughout the basket (tumbler) and interfaced with the microprocessor will trigger the F.S.S. water jets to quickly extinguish the flames. The water jets remain on for 2 minutes and ...

  • American Dryer Corp. Gas DSI/HSI/Electric/Steam/Phase 7 with S.A.F.E. D-40 - page 55

    51 BEFORE YOU START! CHECK LOCAL CODES AND PERMITS Call your local water company or the proper municipal authority for information regarding local codes. IMPORTANT: It is your responsibility to have ALL plumbing connections made by a qualified professional to assure that the plumbing installation is adequate and conforms to local, state, and federa ...

  • American Dryer Corp. Gas DSI/HSI/Electric/Steam/Phase 7 with S.A.F.E. D-40 - page 56

    52 2. Water Connections: The water connection is made to the 1/2” M.P.T. bushing of the electric water solenoid valve located at the rear upper left area of the dryer (see photo). The water solenoid valve has a 3/8” M.P.T. connection and a 1/2” bushing is supplied to provide the minimum 1/2-inch supply (feed) line. Flexible supply line/coupli ...

  • American Dryer Corp. Gas DSI/HSI/Electric/Steam/Phase 7 with S.A.F.E. D-40 - page 57

    53 OPTIONAL MANUAL BYPASS Provisions are made in the dryer fire suppression system (F.S.S.) for the installation of an optional manual bypass. Depending on the model dryer, the connections for the manual bypass are made at the “T” or “four way” fitting located in the outlet supply side of the water solenoid valve. The use and connections of ...

  • American Dryer Corp. Gas DSI/HSI/Electric/Steam/Phase 7 with S.A.F.E. D-40 - page 58

    54 3. Electrical Requirements No independent external power source or supply connection is necessary. The 24 volt power to operate the fire suppression system (F.S.S.) is accomplished internally in the dryer (from the dryer controls). WARNING: ELECTRICAL POWER MUST BE PROVIDED TO THE DRYER AT ALL TIMES. If the main electrical power supply to the dr ...

  • American Dryer Corp. Gas DSI/HSI/Electric/Steam/Phase 7 with S.A.F.E. D-40 - page 59

    55 F.S.S. (F ire Suppression System ) PAR T S BREAK DOWN Replacement parts can be obtained from your reseller or the ADC factory. When ordering replacement parts from the factory, you can FAX your order to ADC at (508) 678-9447 or telephone your order directly to the ADC Parts Department at (508) 678-9000. Please specify the dryer model number and ...

  • American Dryer Corp. Gas DSI/HSI/Electric/Steam/Phase 7 with S.A.F.E. D-40 - page 60

    56 Illus. No. Part No. Qty. Description 1 165114 1 F.S.S. Solenoid Valve 24V 50/60 HZ 2 143220 1 3/8” F.P.T. Brass Tee 3 143251 1 3/8” M.P.T. Brass Plug 4 143208 2 3/8” Comp x 3/8” M.P.T. Brass Connector 5 143099* 6' 3/8” OD x 0.035 Wall Copper Tubing 6 311588 1 Sprinkler Head Mounting Plate 7 143303 1 3/8” N.P.T. Brass Locknut 8 1 ...

  • American Dryer Corp. Gas DSI/HSI/Electric/Steam/Phase 7 with S.A.F.E. D-40 - page 61

    57 Illus. No. Part No. Qty. Description 1 822752 1 F.S.S. Temperature Probe Assembly (includes illus. nos. 1 through 5) 2 154007 2 Push On Fastener 3 390390 1 Sensor Bracket (only) 4 150301 2 #8-18 Phillips PH TEK Screw 5 122647 1 Connector Only (does not include terminals) ...

  • American Dryer Corp. Gas DSI/HSI/Electric/Steam/Phase 7 with S.A.F.E. D-40 - page 62

    ADC 113370 1 - 03/25/02-25 ...

メーカー American Dryer Corp. カテゴリー Clothes Dryer

American Dryer Corp. Gas DSI/HSI/Electric/Steam/Phase 7 with S.A.F.E. D-40のメーカーから受け取ることができるドキュメントは、いくつかのグループに分けられます。その一部は次の通りです:
- #BRANDの図面#
- Gas DSI/HSI/Electric/Steam/Phase 7 with S.A.F.E. D-40の取扱説明書
- American Dryer Corp.の製品カード
- パンフレット
- またはAmerican Dryer Corp. Gas DSI/HSI/Electric/Steam/Phase 7 with S.A.F.E. D-40の消費電力シール
それらは全部重要ですが、デバイス使用の観点から最も重要な情報は、American Dryer Corp. Gas DSI/HSI/Electric/Steam/Phase 7 with S.A.F.E. D-40の取扱説明書に含まれています。

取扱説明書と呼ばれる文書のグループは、American Dryer Corp. Gas DSI/HSI/Electric/Steam/Phase 7 with S.A.F.E. D-40の取り付け説明書、サービスマニュアル、簡易説明書、またはAmerican Dryer Corp. Gas DSI/HSI/Electric/Steam/Phase 7 with S.A.F.E. D-40のユーザーマニュアル等、より具体的なカテゴリーに分類されます。ご必要に応じてドキュメントを検索しましょう。私たちのウェブサイトでは、American Dryer Corp. Gas DSI/HSI/Electric/Steam/Phase 7 with S.A.F.E. D-40の製品を使用するにあたって最も人気のある説明書を閲覧できます。

American Dryer Corp. Gas DSI/HSI/Electric/Steam/Phase 7 with S.A.F.E. D-40デバイスの取扱説明書はどのようなものですか?
取扱説明書は、ユーザーマニュアル又は単に「マニュアル」とも呼ばれ、ユーザーがAmerican Dryer Corp. Gas DSI/HSI/Electric/Steam/Phase 7 with S.A.F.E. D-40を使用するのを助ける技術的文書のことです。説明書は通常、全てのAmerican Dryer Corp. Gas DSI/HSI/Electric/Steam/Phase 7 with S.A.F.E. D-40ユーザーが容易に理解できる文章にて書かれており、その作成者はその分野の専門家です。

American Dryer Corp.の取扱説明書には、基本的な要素が記載されているはずです。その一部は、カバー/タイトルページ、著作権ページ等、比較的重要度の低いものです。ですが、その他の部分には、ユーザーにとって重要な情報が記載されているはずです。

1. American Dryer Corp. Gas DSI/HSI/Electric/Steam/Phase 7 with S.A.F.E. D-40の説明書の概要と使用方法。説明書にはまず、その閲覧方法に関する手引きが書かれているはずです。そこにははAmerican Dryer Corp. Gas DSI/HSI/Electric/Steam/Phase 7 with S.A.F.E. D-40の目次に関する情報やよくある質問、最も一般的な問題に関する情報を見つけられるはずです。つまり、それらはユーザーが取扱説明書に最も期待する情報なのです。
2. 目次。American Dryer Corp. Gas DSI/HSI/Electric/Steam/Phase 7 with S.A.F.E. D-40に関してこのドキュメントで見つけることができる全てのヒントの目次
3. American Dryer Corp. Gas DSI/HSI/Electric/Steam/Phase 7 with S.A.F.E. D-40デバイスの基本機能を使うにあたってのヒント。 American Dryer Corp. Gas DSI/HSI/Electric/Steam/Phase 7 with S.A.F.E. D-40のユーザーが使い始めるのを助けてくれるはずです。
4. トラブルシューティング。American Dryer Corp. Gas DSI/HSI/Electric/Steam/Phase 7 with S.A.F.E. D-40に関する最も重要な問題を診断し、解決するために役立つ体系化された手続き
5. FAQ。よくある質問
6. 連絡先。一人では問題を解決できない場合に、その国におけるAmerican Dryer Corp. Gas DSI/HSI/Electric/Steam/Phase 7 with S.A.F.E. D-40のメーカー/サービスへの連絡先に関する情報。

American Dryer Corp. Gas DSI/HSI/Electric/Steam/Phase 7 with S.A.F.E. D-40についてご質問がありますか?

次のフォームを使用してください

見つけた説明書を読んでもAmerican Dryer Corp. Gas DSI/HSI/Electric/Steam/Phase 7 with S.A.F.E. D-40の問題を解決できない場合、下記のフォームを使用して質問をしましょう。ユーザーのどなたかがAmerican Dryer Corp. Gas DSI/HSI/Electric/Steam/Phase 7 with S.A.F.E. D-40で同様の問題を抱えていた場合、その解決方法を共有したいと考えるかもしれません。

画像のテキストを入力してください

コメント (0)