Raypak Hi Delta 302A-902Aの取扱説明書

56ページ 2.37 mb
ダウンロード

ページに移動 of 56

Summary
  • Raypak Hi Delta 302A-902A - page 1

    INST ALLA TION AND OPERA TING INSTR UCTIONS CA T ALOG NO. 1000.501B Effective: 09-08-06 Replaces: 01-01-05 P/N 240757 Rev . 1 WARNING: If these instructions are not followed exactly , a fire or explosion may result causing property dam- age, personal injury or death. FOR Y OUR SAFETY : Do not store or use gasoline or other flammable vapors and liqu ...

  • Raypak Hi Delta 302A-902A - page 2

    2 ...

  • Raypak Hi Delta 302A-902A - page 3

    WARNINGS 4 BEFORE INST ALLA TION 5 Product Receipt 5 Model Identification 5 Ratings and Certifications 5 Component Locations 6 General Information 7 GENERAL SAFETY 8 T ime/T emperature Relationships in Scalds 8 INST ALLA TION 9 Installation Codes 9 Equipment Base 9 Stacking 9 Clearances 10 Combustion and V entilation Air 12 Conventional Combustion ...

  • Raypak Hi Delta 302A-902A - page 4

    4 D ANGER: Indicates the presence of immediate hazards which will cause severe person- al injury , death or substantial property damage if ignored. WARNING: Indicates the presence of hazards or unsafe practices which could cause severe personal injury , death or substantial property damage if ignored. CA UTION: Indicates the presence of hazards or ...

  • Raypak Hi Delta 302A-902A - page 5

    5 BEFORE INST ALLA TION Raypak strongly recommends that this manual be re- viewed thoroughly before installing your Hi Delta heater . Please review the General Safety information before installing the heater . Factory warranty does not apply to heaters that have been improperly installed or operated. (Refer to the warranty at the back of this manua ...

  • Raypak Hi Delta 302A-902A - page 6

    6 Component Locations Fig. 1: Component Locations – Back Fig. 2: Component Locations – Left Side Panels removed for clarity Fig. 3: Component Locations – Front ...

  • Raypak Hi Delta 302A-902A - page 7

    7 General Infor mation Quant ity of Vent Siz e (in. ) Mode l No. Bur ne rs Gas Va lves Blo wers F lue Intake 302A 6 1 1 5 6 402A 8 1 1 6 6 502A 10 2 1 6 6 652A 13 2 1 8 6 752A 15 2 1 8 6 902A 18 3 1 8 6 # Burners per Va lve St age s % Fire at Sta ge Mode l No. 123 1 2 1 2 302A 6 1 100 402A 8 1 100 502A 5 5 11 , 2 5 0 1 0 0 652A 7 6 11 , 2 5 4 1 0 0 ...

  • Raypak Hi Delta 302A-902A - page 8

    8 GENERAL SAFETY T o meet commercial hot water use needs, the high limit safety control on this water heater is adjustable up to 210°F . However , water temperatures over 125°F can cause instant severe burns or death from scalds. When supplying general purpose hot water , the rec- ommended initial setting for the temperature control is 125°F . S ...

  • Raypak Hi Delta 302A-902A - page 9

    9 INST ALLA TION INST ALLA TION Installation Codes Installations must follow these codes: • Local, state, provincial, and national codes, laws, regulations and ordinances • National Fuel Gas Code, ANSI Z223.1/NFP A 54 – latest edition (NFGC) • National Electrical Code, ANSI/NFP A 70 - latest edition (NEC) • Standard for Controls and Safet ...

  • Raypak Hi Delta 302A-902A - page 10

    10 In addition, the heater shall be installed such that the gas ignition system components are protected from water (dripping, spraying, rain, etc.) during appliance operation or service (circulator replacement, control replacement, etc.). Clearances Indoor Installations Heater Sid e Mini mu m Clear- ance from Co mbus t ible Surf a ces Recomme nded ...

  • Raypak Hi Delta 302A-902A - page 11

    11 U.S. Installations 1 Cana d i a n I nst a lla tions 2 A Clearance above grade , veranda, porch , deck, or balcony 1 ft ( 30 cm) 1 ft ( 30 cm) B Clearance to window or door that may b e opened 4 f t ( 1.2 m) be low o r to sid e of openin g; 1 foo t (30 c m) above op ening 3 ft (91 c m) C Clearance to permanen tly closed window ** D Ver tical clea ...

  • Raypak Hi Delta 302A-902A - page 12

    12 Fig. 8: Minimum Clearances from Combustible Surfaces – Outdoor Installations Combustion and V entilation Air Indoor Units The heater must be supplied with sufficient quantities of non-contaminated air to support proper combustion and equipment ventilation. Combustion air can be sup- plied via conventional means where combustion air is drawn fr ...

  • Raypak Hi Delta 302A-902A - page 13

    13 three or four sheet metal screws (not supplied) equal- ly distributed around the circumference of the duct. All ducting should be self-supported. The filter housing is not designed to support the air duct. T r uSeal™ Combustion Air In certain applications it may be necessary to utilize the T ruSeal option (sales order option D-21 or D-22) and ...

  • Raypak Hi Delta 302A-902A - page 14

    14 b. Not less than the sum of the areas of all vent connectors in the confined space. WARNING: Do not use one permanent opening method if the equipment room is under negative pressure conditions or the equipment is common vented with other gas-fired appliances. 1. V entilation of the space occupied by the heater shall be provided by an opening(s) ...

  • Raypak Hi Delta 302A-902A - page 15

    15 5. Remove all plumbing fittings to the header . This will include both inlet and outlet water pipe unions and the pressure relief valve and drain piping. 6. Remove limits, control bulbs and/or thermocou- ples. 7. Remove the eight flange nuts and the in/out head- er from the left-hand side. 8. Remove the eight flange nuts and the return head- er ...

  • Raypak Hi Delta 302A-902A - page 16

    16 Failure to exceed 105ºF (41ºC) within 7 minutes may result in the premature failure of the hot surface ignit- er , remote flame sensor , burners and heat exchanger . It can cause operational problems, bad combustion, sooting, flue gas spillage and reduced service life of the vent system. The bypass allows part of the heater discharge water to ...

  • Raypak Hi Delta 302A-902A - page 17

    17 Pressur e Drop in Feet of Head F eedwater R e gula tor Raypak recommends that a feedwater regulator be in- stalled and set at 12 psi minimum pressure at the high- est point of the system. Install a check valve or back flow device upstream of the regulator , with a manual shut-off valve as required by local codes. Piping All high points should be ...

  • Raypak Hi Delta 302A-902A - page 18

    18 P ota ble W ater and Space Heating 1. All piping materials and components connected to the water heater for the space heating application shall be suitable for use with potable water . 2. T oxic chemicals, such as used for boiler treatment, shall not be introduced into the potable water used for space heating. 3. If the heater will be used to su ...

  • Raypak Hi Delta 302A-902A - page 19

    19 circulate water through the heater from the main sys- tem piping. T o complete the installation of the pool heater , the pool thermostat needs to be installed in the main return wa- ter line, upstream of the heater . This will ensure that the heater will be energized at the right time. If the main water line is too far away from the heater and t ...

  • Raypak Hi Delta 302A-902A - page 20

    20 shut-off. Close isolation valves and remove water pip- ing from the in/out header on the heater . Drain the heater and any piping of all water that may experience below-freezing temperatures. P ool/Spa Water Chemistr y Wa ter Har dness W ater hardness is mainly due to the presence of cal- cium and magnesium salts dissolved in the water . The con ...

  • Raypak Hi Delta 302A-902A - page 21

    21 Gas Supply Connection The heater must be isolated from the gas supply pip- ing system by closing the manual shut-off valve during any pressure testing of the gas supply piping system at test pressures equal to or less than 1/2 psi (3.45 kPa). Relieve test pressure in the gas supply line prior to reconnecting the heater and its manual shut-off va ...

  • Raypak Hi Delta 302A-902A - page 22

    22 8. Remove the rubber grommet from the left-hand- side panel and reinstall into the standard main gas opening, located on the right-hand side of the heater . 9. Install a coupling, nipple, union and sediment trap onto the right-hand end of the main gas line and then install the gas line, making sure that a manu- al shut-off valve has been install ...

  • Raypak Hi Delta 302A-902A - page 23

    23 CIRCUIT BREAKER WHITE GROUND BLACK GREEN AB C Fig. 18: Wiring Connections Check the power source: AC = 108 V AC Minimum, 132 V AC MAX AB = 108 V AC Minimum, 132 V AC MAX BC = <1 V AC Maximum If the heater does not have a factory-wired stage con- troller , it is factory-wired in an on-off configuration with other stage terminals jumpered. T o ...

  • Raypak Hi Delta 302A-902A - page 24

    24 D ANGER: SHOCK HAZARD Make sure electrical power to the heater is discon- nected to avoid potential serious injury or damage to components. Fig. 21: Wiring Connections ...

  • Raypak Hi Delta 302A-902A - page 25

    25 Installer action is required to electrically enable your heater to operate after making the power connections. Y ou must make a closed contact connection on Stage 1 connector of the Central Point Wiring (CPW) board for temperature control connections. This will be done based on the controller option selected with your heater order . 1. For Pool ...

  • Raypak Hi Delta 302A-902A - page 26

    26 Combustion Air Su p pl y Exh aus t Configuration Heater Venting Category Certified Mate rial s Combustion Air Inlet M ater ial Ver tic al N atur al Draft Ventin g I “B” Ven t From Ins ide Building (Non-Direct Venting) Horizontal Through- the-Wall Venting II I Stainless Steel (Gas Tight) Ver tic al N atur al Draft Ventin g I “B” Ven t Fro ...

  • Raypak Hi Delta 302A-902A - page 27

    27 8. Locate and guard vent termination to prevent acci- dental contact by people or pets. 9. DO NOT terminate vent in window well, stairwell, alcove, courtyard or other recessed area. 10. DO NOT terminate above any door , window , or gravity air intake. Condensate can freeze, causing ice formations. 1 1. Locate or guard vent to prevent condensate ...

  • Raypak Hi Delta 302A-902A - page 28

    28 5. Remove the screws, retaining ring and rain gasket from top of heater . 6. Remove the screws, flue collar and gasket from the run side of the tee located in the flue box on top of the heater . 7. Reverse the components and reattach in the new location. 8. Make sure that the stainless steel cover , now lo- cated on the run side of the tee, is s ...

  • Raypak Hi Delta 302A-902A - page 29

    29 T er mination The vent terminal should be vertical and should termi- nate outside the building at least 2 ft above the high- est point of the roof that is within 10 ft. The vent cap should have a minimum clearance of 4 ft horizontally from and in no case above or below (unless a 4 ft hori- zontal distance is maintained) electric meters, gas me- ...

  • Raypak Hi Delta 302A-902A - page 30

    30 speed. Do not operate summer exhaust fan. Close fireplace dampers. 4. Place in operation the appliances being inspected. Follow the manufacturer ’s instructions for lighting each appliance. Adjust thermostat so appliance will operate continuously . 5. Check the pressure at a pressure tap located 12 in. above the bottom joint of the first verti ...

  • Raypak Hi Delta 302A-902A - page 31

    31 Air Inlet Max . Len gth Mo del No. Certified Vent in g Mate ria l Vent Size Max i mum Eq uiv ale n t Vent Le ngt h* Combustion Air Intake Pipe Mate ria l 6” 8” 302A 5” 402A 100’ N/A 502A 6” 75’ 652A 752A 40’ 100’ 902A Category I I I 8” 70’ Room Air 40’ Ducted Combus t ion Air Galvanized Ste el , PVC , ABS, CPVC 30’ 80’ ...

  • Raypak Hi Delta 302A-902A - page 32

    32 For installations in extremely cold climate, it is re- quired that: 1. The vent must be installed with a slight upward slope of not more than 1/4 inch per foot of hori- zontal run to the vent terminal. In this case, an ap- proved condensate trap must be installed per ap- plicable codes. 2. The intake vent must be insulated through the length of ...

  • Raypak Hi Delta 302A-902A - page 33

    33 Flues supported only by flashing and extended above the roof more than 5 ft should be securely guyed or braced to withstand snow and wind loads. The air inlet opening MUST be installed 1 ft above the roof line or above normal snow levels that might ob- struct combustion air flow . This dimension is critical to the correct operation of the heater ...

  • Raypak Hi Delta 302A-902A - page 34

    34 Fig. 28: External LED Indicator Decal Heater Sequence of Operation Models 302A, 402A, 502A, 652A, 752A and 902A 1. The black (hot) wire lead goes directly to the main power switch. This black toggle switch is located at the middle front of the control compartment. 2. When the main power switch is placed in the “ON” position, 120 V AC is appl ...

  • Raypak Hi Delta 302A-902A - page 35

    35 External Lights Light Color Ind icat ion Power Bl ue Main power is on Call For Heat Yel low Ther m ost a t i s clo sed Sa fety Re d One or more sa feties is inopera- tiv e Ign iti on Re d Igni tion mod ul e i s ino p era tiv e Flow Green Flow is prese nt Blower 1 Green Blower 1 is on Stage 1 Green Stage 1 i s on Stage 2 Green Stage 2 i s on Inte ...

  • Raypak Hi Delta 302A-902A - page 36

    Ignition Module When additional heat is needed, the combustion air blower starts to purge air from the combustion cham- ber for about 15 seconds. On proof-of-air flow , the air- proving switch closes and the igniter is energized. T o ensure safe operation, the gas valve cannot open until the igniter is verified. The main burner is automatically lit ...

  • Raypak Hi Delta 302A-902A - page 37

    37 The optional single-try ignition module will lock out after failing to light one time. T o reset it, press and release the small, recessed black push button located inside of the cut-out on the lower right-hand corner of the ignition module case. T urning off the power to the heater WILL NOT reset the ignition module. High Limit (Manual R eset) ...

  • Raypak Hi Delta 302A-902A - page 38

    38 Fig. 34: High/Low Gas Pressure Switch Fig. 35: Fan-Proving Switch Fig. 36: Blocked V ent Switch ...

  • Raypak Hi Delta 302A-902A - page 39

    39 87%-Ef ficienc y Boiler s – Special Instr uctions Wa ter Piping An 87%-efficiency boiler requires a minimum inlet water temperature of 120ºF (49ºC) to prevent exces- sive condensation in the combustion chamber . An 87%-efficiency boiler operated with an inlet tempera- ture of less than 120ºF (49ºC) must have a manual bypass or an approved ...

  • Raypak Hi Delta 302A-902A - page 40

    40 WARNING: Contact the vent material manufactur- er if there are any questions about the appliance cat- egory or suitability of a vent material for Category II, III or IV applications. Using improper venting materi- als can result in personal injury , death or property damage. V ent T er minal Location 1. Condensate can freeze on the vent cap. Fro ...

  • Raypak Hi Delta 302A-902A - page 41

    41 Horizontal Thr ough-the-Wall V enting (Categor y IV) WARNING: V ent connectors serving appliances vented by natural draft shall not be connected into any portion of mechanical draft systems operating under a positive pressure. Fig. 38: Horizontal Through-the-W all V enting (Category IV) Installation These installations utilize the boiler-mounted ...

  • Raypak Hi Delta 302A-902A - page 42

    42 The stainless steel direct vent cap must be furnished by the boiler manufacturer in accordance with its list- ing (sales order option D-15). Use only double-wall vent pipe and the special gas vent pipes listed for use with category II or IV gas burn- ing boilers, such as the stainless steel Saf-T vent by Heat Fab Inc. (800-772-0739), Protech Sys ...

  • Raypak Hi Delta 302A-902A - page 43

    43 Direct V ent - V er tical Vert ica l Ve nt in g Height* Air I nlet Max . Length** Mode l Certified Vent in g Mate rial Vent Siz e Min. Max . Combustion Air Intake Pipe Mate rial 6” 8” 302A 5” 402A 100’ N/A 502A 6” 75’ 652A 752A 902A Category II or IV 8” 5’ 25’ Galvanized Steel, PVC , ABS, CPVC 40’ 100’ Note: When vertical h ...

  • Raypak Hi Delta 302A-902A - page 44

    44 W iring Dia gr am ...

  • Raypak Hi Delta 302A-902A - page 45

    45 ST ART -UP Pre Star t-up Filling System (Heating Boilers) Fill system with water . Purge all air from the system. Lower system pressure. Open valves for normal sys- tem operation, and fill system through feed pressure. Manually open air vent on the compression tank until water appears, then close vent. Air Pur ge (Domestic Hot W ater Heaters) Pu ...

  • Raypak Hi Delta 302A-902A - page 46

    46 Prepar ation Check P ower Supply With multi-meter at incoming power , check voltage between: Hot - Common (≈120 V AC) Hot - Ground (≈120 V AC) Common - Ground (< 1 V AC) Attach Manometers to Measure Pr essures 1. T urn off main gas valve. 2. Attach 24” scale manometer to the first main gas shut-off valve pressure tapping. 3. Attach (1) ...

  • Raypak Hi Delta 302A-902A - page 47

    47 Safety Inspection 1. Check all thermostats and high limit settings. 2. During the following safety checks leave manome- ters hooked up, check and record. 3. If other gas-fired appliances in the room are on the same gas main, check all pressures on the Hi Delta with all other equipment running. 4. Check thermostats for ON-OFF operation. 5. Check ...

  • Raypak Hi Delta 302A-902A - page 48

    48 1. Manually close the downstream leak test valve. 2. Open test point A and connect a manometer to it. V erify that there is gas pressure and that it is with- in the proper range (NOTE: must not exceed 14.0 in. WC). 3. Open test point B and connect a rubber tube to it. Connect the other end of the tube to a manometer and look for a build-up of pr ...

  • Raypak Hi Delta 302A-902A - page 49

    49 10. T o restart system, follow lighting instructions in the Operation section. 1 1. Check to see that the high limit control is set above the design temperature requirements of the system. For multiple zones: Check to make sure the flow is adjusted as required in each zone. 12. Check that the heater is cycled with the thermo- stat. Raise to the ...

  • Raypak Hi Delta 302A-902A - page 50

    50 TR OUBLESHOO TING Ste p 7 Ste p 6 Ste p 5 Step 1 Step 2 Step 3 Step 4 Is there a Call For Heat? Is Disable j um p er intact? ( J1 ) Is there 120VAC at J8 Connecto r on the CPW board? Do the combustion air blowers come on? Is 24VAC at present at TH (J3 & J12 on CPW board and orange wire on ignition module)? Check flow switch, all connectors o ...

  • Raypak Hi Delta 302A-902A - page 51

    51 MAINTENANCE Suggested Minimum Maintenance Schedule Regular service by a qualified service agency and maintenance must be performed to ensure maximum operating efficiency . Maintenance as outlined below may be performed by the owner . Daily 1. Check that the area where the heater is installed is free from combustible materials, gasoline, and othe ...

  • Raypak Hi Delta 302A-902A - page 52

    52 W eekl y For low-pressure heaters, test low-water cut-off device. (With at least one stage of the appliance on, depress the low water cut-off test button, appliance should shut-off and ignition fault light should come on. Depress reset button to reset). 1. Check igniter . (Resistance reading should be 42- 70 ohms at ambient temperature.) 2. Chec ...

  • Raypak Hi Delta 302A-902A - page 53

    53 APPENDIX Inside Air Contamination All heaters experience some condensation during start-up. The condensate from flue gas is acidic. Combustion air can be contaminated by certain vapors in the air which raise the acidity of the condensate. Higher acidity levels attack many materials including stainless steel, which is commonly used in high effi- ...

  • Raypak Hi Delta 302A-902A - page 54

    LIMI TED P ARTS WA RRANTY HI DELTA – TYPES H AND WH MODELS 302A–902A SCOP E Ray pak, Inc . ( “Ray pak ”) w arr ants to th e o rigin al ow ner that al l par ts of this hea ter w hic h a re act ual ly m an ufac tur ed by R aypak w ill b e fre e fro m fai lur e under n ormal us e a nd s erv ice for th e sp ecif ie d wa rra nty per iods a nd s ...

  • Raypak Hi Delta 302A-902A - page 55

    LIMI TED P ARTS WA RRANTY HI DELTA – TYPE P MODELS 302A–902A SCOP E Ray pak, Inc . ( “Ray pak ”) w arr ants to th e o rigin al ow ner that al l par ts of this hea ter w hic h a re act ual ly m an ufac tur ed by R aypak w ill b e fre e fro m fai lur e under n ormal us e a nd s erv ice for th e sp ecif ie d wa rra nty per iods a nd s ubjec t ...

  • Raypak Hi Delta 302A-902A - page 56

    ww w .raypak.c om Raypak, Inc., 2151 Eastman Avenue, Oxnard, CA 93030 (805) 278-5300 Fax (805) 278-5468 Raypak Canada Limited, 2805 Slough St., Mississauga, Ontario, Canada L4T 1G2 (905) 677-7999 Fax (905) 677-8036 Litho in U.S.A. ...

メーカー Raypak カテゴリー Boiler

Raypak Hi Delta 302A-902Aのメーカーから受け取ることができるドキュメントは、いくつかのグループに分けられます。その一部は次の通りです:
- #BRANDの図面#
- Hi Delta 302A-902Aの取扱説明書
- Raypakの製品カード
- パンフレット
- またはRaypak Hi Delta 302A-902Aの消費電力シール
それらは全部重要ですが、デバイス使用の観点から最も重要な情報は、Raypak Hi Delta 302A-902Aの取扱説明書に含まれています。

取扱説明書と呼ばれる文書のグループは、Raypak Hi Delta 302A-902Aの取り付け説明書、サービスマニュアル、簡易説明書、またはRaypak Hi Delta 302A-902Aのユーザーマニュアル等、より具体的なカテゴリーに分類されます。ご必要に応じてドキュメントを検索しましょう。私たちのウェブサイトでは、Raypak Hi Delta 302A-902Aの製品を使用するにあたって最も人気のある説明書を閲覧できます。

関連する取扱説明書

Raypak Hi Delta 302A-902Aデバイスの取扱説明書はどのようなものですか?
取扱説明書は、ユーザーマニュアル又は単に「マニュアル」とも呼ばれ、ユーザーがRaypak Hi Delta 302A-902Aを使用するのを助ける技術的文書のことです。説明書は通常、全てのRaypak Hi Delta 302A-902Aユーザーが容易に理解できる文章にて書かれており、その作成者はその分野の専門家です。

Raypakの取扱説明書には、基本的な要素が記載されているはずです。その一部は、カバー/タイトルページ、著作権ページ等、比較的重要度の低いものです。ですが、その他の部分には、ユーザーにとって重要な情報が記載されているはずです。

1. Raypak Hi Delta 302A-902Aの説明書の概要と使用方法。説明書にはまず、その閲覧方法に関する手引きが書かれているはずです。そこにははRaypak Hi Delta 302A-902Aの目次に関する情報やよくある質問、最も一般的な問題に関する情報を見つけられるはずです。つまり、それらはユーザーが取扱説明書に最も期待する情報なのです。
2. 目次。Raypak Hi Delta 302A-902Aに関してこのドキュメントで見つけることができる全てのヒントの目次
3. Raypak Hi Delta 302A-902Aデバイスの基本機能を使うにあたってのヒント。 Raypak Hi Delta 302A-902Aのユーザーが使い始めるのを助けてくれるはずです。
4. トラブルシューティング。Raypak Hi Delta 302A-902Aに関する最も重要な問題を診断し、解決するために役立つ体系化された手続き
5. FAQ。よくある質問
6. 連絡先。一人では問題を解決できない場合に、その国におけるRaypak Hi Delta 302A-902Aのメーカー/サービスへの連絡先に関する情報。

Raypak Hi Delta 302A-902Aについてご質問がありますか?

次のフォームを使用してください

見つけた説明書を読んでもRaypak Hi Delta 302A-902Aの問題を解決できない場合、下記のフォームを使用して質問をしましょう。ユーザーのどなたかがRaypak Hi Delta 302A-902Aで同様の問題を抱えていた場合、その解決方法を共有したいと考えるかもしれません。

画像のテキストを入力してください

コメント (0)