Utica Gas-fired Boilerの取扱説明書

28ページ 0.95 mb
ダウンロード

ページに移動 of 28

Summary
  • Utica Gas-fired Boiler - page 1

    INST INST INST INST INST ALLA ALLA ALLA ALLA ALLA TION MANU TION MANU TION MANU TION MANU TION MANU AL AL AL AL AL AND OPERA AND OPERA AND OPERA AND OPERA AND OPERA TING INSTR TING INSTR TING INSTR TING INSTR TING INSTR UCTIONS UCTIONS UCTIONS UCTIONS UCTIONS MGB MGB MGB MGB MGB GAS FIRED BOILERS FOR FORCED HOT W A TER Utica Boilers, • P .O. Box ...

  • Utica Gas-fired Boiler - page 2

    T T T T T ABLE OF CONTENTS ABLE OF CONTENTS ABLE OF CONTENTS ABLE OF CONTENTS ABLE OF CONTENTS Safety Symbols & Warnings ........................................................................ Page 2 Installation Procedure .................................................................................. Page 3 Ventilation and Combustion Air . ...

  • Utica Gas-fired Boiler - page 3

    IMPOR IMPOR IMPOR IMPOR IMPOR T T T T T ANT! ANT! ANT! ANT! ANT! READ ALL INSTRUCTIONS BEFORE INSTALLING. WARNING: WARNING: WARNING: WARNING: WARNING: 1. Keep boiler area clear and free from combustible materials, gasoline and other flammable vapors and liquids. 2. DO NOT obstruct air openings to the boiler room. 3. Modification, substitution or el ...

  • Utica Gas-fired Boiler - page 4

    INST INST INST INST INST ALLA ALLA ALLA ALLA ALLA TION PR TION PR TION PR TION PR TION PR OCEDURE OCEDURE OCEDURE OCEDURE OCEDURE WARNING: Improper installation, adjustment, alteration, service or maintenance can cause injury or property damage. 1. The installation must conform to the requirements of the authority having jurisdiction or, in the abs ...

  • Utica Gas-fired Boiler - page 5

    PAGE 4 COMB COMB COMB COMB COMB USTION USTION USTION USTION USTION AIR REQ AIR REQ AIR REQ AIR REQ AIR REQ UIREMENTS UIREMENTS UIREMENTS UIREMENTS UIREMENTS (MINIMUM SQUARE INCHES OPENING) * * * * * UNCONFINED AREA ** ** ** ** ** CONFINED AREA OUTSIDE INSIDE OUTSIDE COMBUSTION AIR MODEL COMBUSTION COMBUSTION VERTICAL HORIZONTAL NUMBER AIR 1 SQ. IN ...

  • Utica Gas-fired Boiler - page 6

    PAGE 5 construction, air for combustion and ventilation must be obtained from outdoors or from spaces freely communicating with the outdoors. A permanent opening or openings having a total free area of not less than 1 square inch per 5,000 BTU per hour of total input rating of all appliances shall be provided. Ducts may be used to convey makeup air ...

  • Utica Gas-fired Boiler - page 7

    FIGURE 3 FIGURE 4 shall be permitted where the equipment has clearances of at least 1 inch from the sides, 1 inch from the back, and 6 inches from the front of the boiler. The opening shall directly communicate with the outdoors or shall communicate through a vertical or horizontal duct to the outdoors or spaces (crawl or attic) that freely communi ...

  • Utica Gas-fired Boiler - page 8

    PAGE 7 FIGURE 7 FIGURE 6 BYPASS PIPING MIXING VALVE PIPING 3. Hot water boilers installed above radiation level must be provided with a low water cut- off device. 4. When a boiler is connected to a heating system that utilizes multiple zoned circulators, each circulator must be supplied with a flow control valve to prevent gravity circulation. 5. H ...

  • Utica Gas-fired Boiler - page 9

    PAGE 8 7. Installation using circulators is shown in figure 9 below. 8. Installation using zone valves is shown in figure 10 on page 9. 9. For further piping information refer to the I=B=R Installation and Piping Guide. FIGURE 9 FIGURE 8 PRIMARY SECONDARY PIPING WITH BY PASS ...

  • Utica Gas-fired Boiler - page 10

    PAGE 9 VENT INST VENT INST VENT INST VENT INST VENT INST ALLA ALLA ALLA ALLA ALLA TION TION TION TION TION WARNING: WARNING: WARNING: WARNING: WARNING: This boiler shall not be connected to any portion of a mechanical draft system operating under positive pressure. 1. The vent pipe must slope upward from the boiler not less then 1/4 inch for every ...

  • Utica Gas-fired Boiler - page 11

    VENT SY VENT SY VENT SY VENT SY VENT SY STEM MODIFICA STEM MODIFICA STEM MODIFICA STEM MODIFICA STEM MODIFICA TION TION TION TION TION When an existing boiler is removed from a common venting system, the common venting system is likely to be too large for the proper venting of the appliances remained connected to it. If this situation occurs, the f ...

  • Utica Gas-fired Boiler - page 12

    VENT D VENT D VENT D VENT D VENT D AMPER INST AMPER INST AMPER INST AMPER INST AMPER INST ALLA ALLA ALLA ALLA ALLA TION TION TION TION TION AND INSTR AND INSTR AND INSTR AND INSTR AND INSTR UCTIONS UCTIONS UCTIONS UCTIONS UCTIONS INSTALLATION INSTALLATION INSTALLATION INSTALLATION INSTALLATION NOTE: Refer to Figure 11for steps 1 - 7. 1. Place Vent ...

  • Utica Gas-fired Boiler - page 13

    CONNECTING GAS SERVICE CONNECTING GAS SERVICE CONNECTING GAS SERVICE CONNECTING GAS SERVICE CONNECTING GAS SERVICE 1. Connect gas service from meter to control assembly in accordance with ANSI Z223.1 and local codes or utility. A ground joint union should be installed for easy removal of gas control for servicing. A drip leg or trap must be install ...

  • Utica Gas-fired Boiler - page 14

    LIGHTING INSTRUCTIONS LIGHTING INSTRUCTIONS LIGHTING INSTRUCTIONS LIGHTING INSTRUCTIONS LIGHTING INSTRUCTIONS WARNING: WARNING: WARNING: WARNING: WARNING: IF YOU DO NOT FOLLOW THESE INSTRUCTIONS EXACTLY, A FIRE OR EXPLOSION MAY RESULT CAUSING PROPERTY DAMAGE, PERSONAL INJURY OR LOSS OF LIFE. Before any procedures are attempted on this appliance, it ...

  • Utica Gas-fired Boiler - page 15

    FIGURE 14 PAGE 14 LIGHTING PROCEDURE FOR BOILER WITH LIGHTING PROCEDURE FOR BOILER WITH LIGHTING PROCEDURE FOR BOILER WITH LIGHTING PROCEDURE FOR BOILER WITH LIGHTING PROCEDURE FOR BOILER WITH INTERMITTENT PIL INTERMITTENT PIL INTERMITTENT PIL INTERMITTENT PIL INTERMITTENT PIL O O O O O T SY T SY T SY T SY T SY STEMS STEMS STEMS STEMS STEMS . . . . ...

  • Utica Gas-fired Boiler - page 16

    LIGHTING PROCEDURE FOR BOILER LIGHTING PROCEDURE FOR BOILER LIGHTING PROCEDURE FOR BOILER LIGHTING PROCEDURE FOR BOILER LIGHTING PROCEDURE FOR BOILER WITH CONTINUOUS PIL WITH CONTINUOUS PIL WITH CONTINUOUS PIL WITH CONTINUOUS PIL WITH CONTINUOUS PIL O O O O O T T T T T FOR YOUR SAFETY READ BEFORE LIGHTING FOR YOUR SAFETY READ BEFORE LIGHTING FOR YO ...

  • Utica Gas-fired Boiler - page 17

    9. Push in gas control knob or reset button if so equipped, all the way in and hold. Immediately light the pilot with a match. Continue to hold the gas control knob or reset button in for about 1 minute after the pilot is lit. Release knob or button, and it will pop up back up. Pilot should remain lit. If it goes out, repeat steps 5 through 9. * If ...

  • Utica Gas-fired Boiler - page 18

    GENERAL INSTRUCTIONS GENERAL INSTRUCTIONS GENERAL INSTRUCTIONS GENERAL INSTRUCTIONS GENERAL INSTRUCTIONS Before seasonal start-up, have a competent service agency check the boiler for soot and scale in the flues, clean the burners and check the gas input rate to maintain high operating efficiency. CA CA CA CA CA UTION: UTION: UTION: UTION: UTION: L ...

  • Utica Gas-fired Boiler - page 19

    FIGURE 19 FIGURE 20 PAGE 18 the mirror positioned above the burners, the flue gas passageways can be checked for soot or scale. The following procedure should be followed to clean the flue gas passageways: 1. Remove the burners from the combustion chamber by raising the burners up from the manifold orifices and pulling toward the front of the boile ...

  • Utica Gas-fired Boiler - page 20

    The burners and pilot should be checked for signs of corrosion, rust or scale buildup. The area around the boiler must be kept clear and free of combustible materials, gasoline and other flammable vapors and liquids. The free flow of combustion and ventilating air to the boiler and boiler room must not be restricted or blocked. It is recommended th ...

  • Utica Gas-fired Boiler - page 21

    PAGE 20 CHECK SAFETY CONTROL CIRCUIT, after burner adjustments are made, for satisfactory operation. 1. Pilot: With main burner operating, turn the pilot gas adjusting screw clockwise until pilot gas is turned off. See figures 14, 15, & 16 on pages 14 & 15. Within 90 seconds the main gas control should close, shutting off the gas to the mai ...

  • Utica Gas-fired Boiler - page 22

    MGB SERIES REPLA MGB SERIES REPLA MGB SERIES REPLA MGB SERIES REPLA MGB SERIES REPLA CEMENT P CEMENT P CEMENT P CEMENT P CEMENT P AR AR AR AR AR TS - PIL TS - PIL TS - PIL TS - PIL TS - PIL O O O O O TS TS TS TS TS FIGURE 25 PAGE 21 1 1520001 THERMOCOUPLE Q309A 1 2 HW-009.01 SCREW #8-18X1/2 4 3 PB-011.03 PILOT STDG Q380 NAT 1 PB-011.04 PILOT STDG Q ...

  • Utica Gas-fired Boiler - page 23

    MGB SERIES REPLA MGB SERIES REPLA MGB SERIES REPLA MGB SERIES REPLA MGB SERIES REPLA CEMENT P CEMENT P CEMENT P CEMENT P CEMENT P AR AR AR AR AR TS - B TS - B TS - B TS - B TS - B ASE ASE ASE ASE ASE FIGURE 26 PAGE 22 1 3352401 BURNER TUBE 1.3/4" MGB50 (1) MGB75 (2) MGB100 (2) MGB125 (3) MGB150 (3) MGB175 (4) MGB200 (4) MGB250 (5) MGB300 (6) 2 ...

  • Utica Gas-fired Boiler - page 24

    MGB SERIES REPLA MGB SERIES REPLA MGB SERIES REPLA MGB SERIES REPLA MGB SERIES REPLA CEMENT P CEMENT P CEMENT P CEMENT P CEMENT P AR AR AR AR AR TS - J TS - J TS - J TS - J TS - J A A A A A CKETS CKETS CKETS CKETS CKETS FIGURE 27 PAGE 23 1 31621501 PANEL - TOP MGB50 1 31621502 PANEL - TOP MGB75 & 100 31621503 PANEL - TOP MGB125 31621504 PANEL - ...

  • Utica Gas-fired Boiler - page 25

    MGB SERIES REPLA MGB SERIES REPLA MGB SERIES REPLA MGB SERIES REPLA MGB SERIES REPLA CEMENT P CEMENT P CEMENT P CEMENT P CEMENT P AR AR AR AR AR TS TS TS TS TS HEA HEA HEA HEA HEA T EX T EX T EX T EX T EX CHANGER CHANGER CHANGER CHANGER CHANGER FIGURE 28 PAGE 24 ITEM NO P /N DESCRIPTION QTY. 1 100-2-2.01 B-LEFT HAND SECTION 1 2 100-2-1.01 B-CENTER ...

  • Utica Gas-fired Boiler - page 26

    MGB SERIES REPLA MGB SERIES REPLA MGB SERIES REPLA MGB SERIES REPLA MGB SERIES REPLA CEMENT P CEMENT P CEMENT P CEMENT P CEMENT P AR AR AR AR AR TS TS TS TS TS PIPING & CONTROLS PIPING & CONTROLS PIPING & CONTROLS PIPING & CONTROLS PIPING & CONTROLS FIGURE 29 PAGE 25 ITEM NO P/N DESCRIPTION QTY. 1 37513301 WIRE ROLLOUT/SPILL 28& ...

  • Utica Gas-fired Boiler - page 27

    § § § ** † ∆ ∆ ∆ ∆ ∆ Natural Propane Boiler A.G.A. Heating I=B=R NetRating No. Recommended Gas Orifice Water No. Input Capacity NetOutput S q . F t. H W o f Air Cushion Orifice Drill Content Btu/Hr. Btu/Hr. Btu/Hr @ 1 70 o Burners Tank Drill Size Size (Gals.) MGB 50 50,000 42,000 37,000 24 3 1 15 30 47 2.4 MGB 75 75,000 63,000 55,000 ...

  • Utica Gas-fired Boiler - page 28

    * Pump size Boiler Natural Dimensions Supply & No. Ga s Return Inlet A B C D E F Tappings MGB 50 1/2" 11.1/8" 5.1/2" 4" 30.3/4" 36.1/4" 6" 1.1/4" MGB 75 1/2" 15 7.1/2" 5" 30.3/4" 37.3/4" 6" 1.1/4" MGB 100 1/2" 15 7.1/2" 6" 30.3/4" 37.1/4" 6.1/2&q ...

メーカー Utica カテゴリー Boiler

Utica Gas-fired Boilerのメーカーから受け取ることができるドキュメントは、いくつかのグループに分けられます。その一部は次の通りです:
- #BRANDの図面#
- Gas-fired Boilerの取扱説明書
- Uticaの製品カード
- パンフレット
- またはUtica Gas-fired Boilerの消費電力シール
それらは全部重要ですが、デバイス使用の観点から最も重要な情報は、Utica Gas-fired Boilerの取扱説明書に含まれています。

取扱説明書と呼ばれる文書のグループは、Utica Gas-fired Boilerの取り付け説明書、サービスマニュアル、簡易説明書、またはUtica Gas-fired Boilerのユーザーマニュアル等、より具体的なカテゴリーに分類されます。ご必要に応じてドキュメントを検索しましょう。私たちのウェブサイトでは、Utica Gas-fired Boilerの製品を使用するにあたって最も人気のある説明書を閲覧できます。

関連する取扱説明書

Utica Gas-fired Boilerデバイスの取扱説明書はどのようなものですか?
取扱説明書は、ユーザーマニュアル又は単に「マニュアル」とも呼ばれ、ユーザーがUtica Gas-fired Boilerを使用するのを助ける技術的文書のことです。説明書は通常、全てのUtica Gas-fired Boilerユーザーが容易に理解できる文章にて書かれており、その作成者はその分野の専門家です。

Uticaの取扱説明書には、基本的な要素が記載されているはずです。その一部は、カバー/タイトルページ、著作権ページ等、比較的重要度の低いものです。ですが、その他の部分には、ユーザーにとって重要な情報が記載されているはずです。

1. Utica Gas-fired Boilerの説明書の概要と使用方法。説明書にはまず、その閲覧方法に関する手引きが書かれているはずです。そこにははUtica Gas-fired Boilerの目次に関する情報やよくある質問、最も一般的な問題に関する情報を見つけられるはずです。つまり、それらはユーザーが取扱説明書に最も期待する情報なのです。
2. 目次。Utica Gas-fired Boilerに関してこのドキュメントで見つけることができる全てのヒントの目次
3. Utica Gas-fired Boilerデバイスの基本機能を使うにあたってのヒント。 Utica Gas-fired Boilerのユーザーが使い始めるのを助けてくれるはずです。
4. トラブルシューティング。Utica Gas-fired Boilerに関する最も重要な問題を診断し、解決するために役立つ体系化された手続き
5. FAQ。よくある質問
6. 連絡先。一人では問題を解決できない場合に、その国におけるUtica Gas-fired Boilerのメーカー/サービスへの連絡先に関する情報。

Utica Gas-fired Boilerについてご質問がありますか?

次のフォームを使用してください

見つけた説明書を読んでもUtica Gas-fired Boilerの問題を解決できない場合、下記のフォームを使用して質問をしましょう。ユーザーのどなたかがUtica Gas-fired Boilerで同様の問題を抱えていた場合、その解決方法を共有したいと考えるかもしれません。

画像のテキストを入力してください

コメント (0)