Pelco C1555M-Fの取扱説明書

67ページ 3.87 mb
ダウンロード

ページに移動 of 67

Summary
  • Pelco C1555M-F - page 1

    ADDENDUM Pelco Worldwide Headquarters • 3500 Pelco W ay • Clovis, California 93612 USA • www .pelco.com USA & Canada •T el: 800/289-9100 • Fax: 800/289-9150 International •T el: 1-559/292-1981 • Fax: 1-559/348-1120 Addendum No. C1573M Date February 1, 2006 Manuals Affected C1572M, C1555M-F , C1566M-C Manual Update The front and re ...

  • Pelco C1555M-F - page 2

    ® INSTALLATION/OPERATION System 9770 C1555M-F (10/05) ...

  • Pelco C1555M-F - page 3

    ...

  • Pelco C1555M-F - page 4

    C1555M-F (10/05) 3 Contents Contents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 List of Illustrations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ...

  • Pelco C1555M-F - page 5

    4 C1555M-F (10/05) List of Illustrations 1 CM9770-MXB Mounting Baffle . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 2 Mounting the CM9770-MXB on T op of the Mounting Baffle . . . . . . . . . . . . . . . . . . . . . . . . . . ...

  • Pelco C1555M-F - page 6

    C1555M-F (10/05) 5 List of T ables A LEDs Illuminated During a Basic Check . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16 B Data Connections—Single Node Systems Without a Hot Switch . . . . . . . . . . . . . . . . . . . . . . . . . . ...

  • Pelco C1555M-F - page 7

    6 C1555M-F (10/05) Description The System 9770 is a full-featured video matrix switching control system that allows users to view and control up to 2,048 cameras and 512 monitors on a single node. The System 9770 has the following basic components: • CM9700-CC1—This is the system CPU; connect matrix bays, keyboards, PTZ camera control lines, an ...

  • Pelco C1555M-F - page 8

    C1555M-F (10/05) 7 MODELS Controller and CPU Components CM9700-CC1 CPU controller; 120 V AC, 60 Hz or 230 VAC, 50 Hz. CM9700-SER Serial communication card (RS-422 SERCOM); provides 8 communications ports to interface peripheral equipment (4 maximum per CPU). CM9700-SER-32 Port expansion unit; 32 serial communication (SERCOM) ports per unit. Up to t ...

  • Pelco C1555M-F - page 9

    8 C1555M-F (10/05) Keyboards The following keyboards are compatible with the System 9770: CM9760-KBD Full-function desktop variable-speed keyboard; 120 V AC, 60 Hz. CM9760-KBD-X Same as CM9760-KBD except 230 V AC, 50 Hz. CM9760-KBR Full-function 19-inch EIA rack mount keyboard; 120 V AC, 60 Hz. CM9760-KBR-X Same as CM9760-KBR except 230 V AC, 50 Hz ...

  • Pelco C1555M-F - page 10

    C1555M-F (10/05) 9 Installation UNPACKING 1. Unpack and inspect all equipment, and verify delivery according to the packing slip. Before shipping, Pelco connects, tests, and programs each system according to the individual sales order . Contact Pelco immediately if there is any discrepancy in the equipment that you receive. CM9700-CC1 The following ...

  • Pelco C1555M-F - page 11

    10 C1555M-F (10/05) MOUNTING Install the System 9770 in EIA-standard 19-inch (48.26 cm) racks. CM9770-MXB 1. Install the CM9770-MXB mounting baffle first (refer to Figure 1). The mounting baffle uses 1 rack unit (RU), and it has front and rear mounting ears, which are attached to the front and rear mounting racks. The rear mounting brackets are ...

  • Pelco C1555M-F - page 12

    C1555M-F (10/05) 11 Figure 2. Mounting the CM9770-MXB on T op of the Mounting Baffle (Optional) Install additional CM9770-MXB mounting trays and matrix bays to the side of and below the first unit, as necessary . 3. Use the RJ-45 data cables supplied with each CM9770-MXB to connect the MXBs to the CC1. Refer to the Data Connections section and th ...

  • Pelco C1555M-F - page 13

    12 C1555M-F (10/05) c. Attach the ear of the rear -mounting support rail to the rear of the equipment rack using four 10-32 x 0.375-inch flat head screws. (The holes in the ear of the rail should align with the threaded holes in the equipment rack.) 4. T ighten the three 8-32 x 0.375-inch pan head screws and washers that were attached to the front ...

  • Pelco C1555M-F - page 14

    C1555M-F (10/05) 13 V IDEO INPUT/OUTPUT CONNECTIONS The following steps provide an overview of how to connect video input and output sources. More complete procedures are provided in the subsequent sections. 1. Install the CM9770-VCC and CM9770-VMC cards in the matrix bay . Refer to the Installing Video Input Cards (CM9770-VCC) section and the Inst ...

  • Pelco C1555M-F - page 15

    14 C1555M-F (10/05) INSTALLING VIDEO INPUT CARDS (CM9770-VCC) The first video input card is inserted into slot 1; the next card is inserted into slot 2 (refer to Figure 4). T o add a video ca rd, slide the card into the first available slot. The CM9770-MXB can contain a maximum of eight viideo input cards. How to T urn On the Pelco V-Sync Signal ...

  • Pelco C1555M-F - page 16

    C1555M-F (10/05) 15 INSTALLING MONITOR OUTPUT CARDS (CM9770-VMC) The monitor output card located in slot 10 is the primary card, and it handles video for monitors 1-16. Refer to Figure 5. Note that the CM9770-MXB will not function without a CM9770-VMC card inserted into slot 10. An optional secondary VMC card can be installed in slot 9. This card r ...

  • Pelco C1555M-F - page 17

    16 C1555M-F (10/05) PERFORMING A BASIC LED CHECK Y ou should perform a basic LED check before you connect any video input or output to the matrix bay . The LED check allows you to ensure that the system is operating properly . 1. T urn on the power switch on the rear of the matrix bay . The front cover can either be open or closed during the LED ch ...

  • Pelco C1555M-F - page 18

    C1555M-F (10/05) 17 INSTALLING REAR PANEL BNC CARDS The following rear panel cards can be used with the CM9770-MXB matrix bay: • CM9770-RPC—the BNC card for video connections • CM9770-RPM—the BNC card for monitor connections • CM9770-DFC—this is a downframe card and cable assembly used to connect multiple matrix bays; refer to the Downf ...

  • Pelco C1555M-F - page 19

    18 C1555M-F (10/05) Change the T ermination Jumpers on a Rear Panel Video BNC Card In a single-bay , non-looping configuration (up to 256 cameras and 32 monitors), the jumpers must be set in the terminated position. Refer to the Installing Additional Matrix Bays—Sideframing and Downframing section in the Appendix for details on termination jumpe ...

  • Pelco C1555M-F - page 20

    C1555M-F (10/05) 19 Looping Video When looping video out to another device (such as a DVR, VCR, or switcher), the connection instructions depend on the size of your system, as follows: • In a system containing 32 monitors or fewer (the video is not downframed), use the CM9700-VPP panels to loop the video out. Connect the DFC cables that are provi ...

  • Pelco C1555M-F - page 21

    20 C1555M-F (10/05) Insert or Replace a Rear Panel Monitor BNC Card (CM9770-RPM) 1. Slide the monitor BNC card into the card guides at the rear of the bay . From the rear of the bay , the slot at the far left provides the connection point for the primary monitor output card inserted in the front of the bay into slot 10. 2. Push the BNC card into pl ...

  • Pelco C1555M-F - page 22

    C1555M-F (10/05) 21 V IDEO INPUT/OUTPUT CAPACITY Single Bay A single CM9770-MXB can support up to 256 camera inputs (in increments of 32) and 32 monitor outputs (in increments of 16). Refer to Figure 12. Figure 12. Sample CM9770 System with 256 Cameras and 32 Monitors .................. CM9770 MXB CM9700-CC1 CAM 1 CAM 17 CAM 256 MONITOR 32 MONITOR ...

  • Pelco C1555M-F - page 23

    22 C1555M-F (10/05) Multiple Bays, Single Node In a single-node system with one CM9700-CC1 (not networked), you can connect multiple CM9770-MXBs using “sideframing” and “downframing” for a maximum capacity of 2,048 camera inputs and 256 monitor outputs. • Sideframing—T o expand the matrix video inputs beyond 256, you can use multiple ba ...

  • Pelco C1555M-F - page 24

    C1555M-F (10/05) 23 Figure 14. Sample Sideframing System Using an Output Bay CM9700-CC1 MONITOR 1 OUTPUT BAY TO CM9700-CC1 MONITOR 32 OPTIONAL: ADD CM9770-VCC INPUT CARDS AND BNC INPUT CARDS AS NECESSARY TO CONNECT SIDEFRAME CABLES FROM ADDITIONAL BAYS OR TO CONNECT CAMERAS DIRECTLY TO THE OUTPUT BAY (WHEN USING SEVEN MATRIX BAYS OR FEWER) TO CM970 ...

  • Pelco C1555M-F - page 25

    24 C1555M-F (10/05) • Downframing—T o expand the matrix video outputs beyond 32, you can loop the video from the first CM9770-MXB to subsequent CM9770-MXB units for an additional 32 monitor outputs on each matrix bay . Refer to Figure Figure 15.. Y ou can connect a maximum of eight bays in a downframing configuration for a total MXB capacity ...

  • Pelco C1555M-F - page 26

    C1555M-F (10/05) 25 Networked System A networked system with multiple nodes uses an NIU (network interface unit) to combine up to 24 CM9700-CC1 systems into a network—each CC1 system is called a “node.” Multiple CM9770-MXB units can be connected to each CC1 through sideframing and downframing. An NIU is a CM9700-CC1 loaded with networking sof ...

  • Pelco C1555M-F - page 27

    26 C1555M-F (10/05) THE POWER SUPPLY MODULE (CM9700-MPS) Y ou can add a backup power supply module (CM9700-MPS) to a System 9770 matrix bay to provide redundancy to the bay’ s power supply . INSTALL A BACKUP POWER SUPPLY 1. Open the matrix bay front cover . 2. Remove the blank-off plate from the empty power input slot. 3. Slide the power input mo ...

  • Pelco C1555M-F - page 28

    C1555M-F (10/05) 27 HOW TO REPLACE THE FUSE IN A POWER SUPPLY MODULE The matrix bay is shipped from the factory configured for the correct input power . The power input panel, on the rear panel of the matrix bay, provides two separate power input receptacles, one for each power supply . Each power input receptacle is equipped with a fuse assembly ...

  • Pelco C1555M-F - page 29

    28 C1555M-F (10/05) HOW TO T URN OFF THE AUDIBLE POWER SUPPLY ALARM The power supply module contains an audible alarm, which operates in conjunction with the fault LEDs located on the power supply front panel. T o turn off this alarm, complete the following steps: 1. T urn off the matrix bay power . 2. Remove the power supply module from the matrix ...

  • Pelco C1555M-F - page 30

    C1555M-F (10/05) 29 SYSTEM DEVICE CONNECTIONS 1. T urn off power to all system devices and disconnect all power line cords while connecting system devices. 2. Complete the following steps to connect one or more CM9760-KBD system keyboards. a. Connect the keyboard to the CM9505-UPS using the straight cable supplied with the keyboard. b. Connect the ...

  • Pelco C1555M-F - page 31

    30 C1555M-F (10/05) Figure 22. CM9700-MGR PC Pin-Out Detail 6. Install any additional system peripheral devices. Refer to the manuals for the individual devices for instructions. Refer to the Data Connections section and your Port Assignments table for directions on which port to use for each device. 7. Connect all power line cords to the equipment ...

  • Pelco C1555M-F - page 32

    C1555M-F (10/05) 31 RS-422 COM PORT (“SERCOM”) CONNECTIONS All peripheral equipment in a System 9770 connect through the RS-422 COM ports on the CM9700-CC1 rear panel. (These ports are also known as “sercom” ports, short for “serial communication” ports.) If you exceed the number of CM9700-CC1 rear panel ports available, you can add por ...

  • Pelco C1555M-F - page 33

    32 C1555M-F (10/05) T able D. Data Connections—Single Node, Hot-Switched System T able E. Data Connections—Networked, Hot-Switched System MXB connection(s) CC1 port 6 and next consecutive ports, as necessary—connected through the hot switch. Hot Switch connection CC1 port 5. Other peripherals Any available port(s)— connected through the hot ...

  • Pelco C1555M-F - page 34

    C1555M-F (10/05) 33 Figure 23. Sample CM9770-MXB to CM9700-CC1 Connection Figure 24. Sample CM9770-MXB and CM9700-CC1 Connections in a Networked System CM9700-CC1 CM9770-MXB PIN 1 PIN 8 REVERSED CABLE CM9770-MXB RJ-45 PIN-OUTS CM9700-CC1 RJ-45 PIN-OUTS REVERSED DATA CABLE PIN 1 = PIN 2 = PIN 7 = PIN 8 = TX+ TX- RX- RX+ PIN 1 = PIN 2 = PIN 7 = PIN 8 ...

  • Pelco C1555M-F - page 35

    34 C1555M-F (10/05) System Start-Up T o start up your system you must complete the following tasks: 1. Install the CM9700-MGR on a PC connected to the CC1. Refer to System Device Connections in the Installation section for instructions on connecting a PC to the CC1. Refer to the CM9700-MGR Software Guide for instructions on installing the CM9700-MG ...

  • Pelco C1555M-F - page 36

    C1555M-F (10/05) 35 V ERIFY SYSTEM OPERATION 1. Power up all the remaining equipment. 2. After the CM9700-CC1 loads the configuration files, “SYSTEM 97XX” appears on the CM9760-KBD LCD. 3. Enter the default operator password on the CM9760-KBD keypad. “ENTER MONITOR #” appears on the LCD. 4. Enter 1, and then press the MON key . (Note: if ...

  • Pelco C1555M-F - page 37

    36 C1555M-F (10/05) DISPLAY THE CM9770-MXB SOFTWARE V ERSION LEVEL T o display the software version level on a system monitor , complete the following steps: 1. Enter the monitor number , and then press the MON key . 2. Enter 999997, and then press the CAM key . The software version number appears on the monitor . DISPLAY A BLUE RASTER SCREEN T o d ...

  • Pelco C1555M-F - page 38

    C1555M-F (10/05) 37 Programming Y our System When you open CM9700-MGR, the Getting Started dialog box appears.. Figure 27. Getting Started Dialog Box The CM9700-MGR provides the following configuration options: • Setup Wizard: This option opens the Setup Wizard (a series of dialog boxes), which provides assistance in setting up a new system. • ...

  • Pelco C1555M-F - page 39

    38 C1555M-F (10/05) GETTING HELP USING CM9700-MGR Instructions for how to use CM9700-MGR are provided throughout the software. The CM9700-MGR provides wizards to help users complete tasks, such as adding a device or a group. Each wizard screen contains instructions and explanatory text. Figure 28. Sample Wizard Page When you are working within the ...

  • Pelco C1555M-F - page 40

    C1555M-F (10/05) 39 Operation A brief description of System 9770 operation is provided here. OPERATING Y OUR SYSTEM 9770 System 9770 can be operated with a CM9760-KBD or KBD300A keyboard. Operation instructions are provided below , but you should become familiar with the detailed instructions provided in the appropriate keyboard manual. Switch Moni ...

  • Pelco C1555M-F - page 41

    40 C1555M-F (10/05) Appendix SYSTEM ARCHITECTURE The System 9770 is similar to Pelco’ s System 9760 but uses different matrix bay hardware and provides more features. Users familiar with the System 9760 should note the following differences: • Each System 9770 video input card (CM9770-VCC) receives input from 32 video connections (from the CM97 ...

  • Pelco C1555M-F - page 42

    C1555M-F (10/05) 41 INSTALLING ADDITIONAL MATRIX BAYS—SIDEFRAMING AND DOWNFRAMING When either more cameras and/or more monitors are needed than can be accommodated by one matrix bay (256 x 32), you can install additional matrix bays in either of the following configurations: • Sideframing—This option increases the number of available video i ...

  • Pelco C1555M-F - page 43

    42 C1555M-F (10/05) Downframing T o expand the matrix video outputs beyond 32, you can downframe the video from the first CM9770-MXB to subsequent CM9770-MXB units for an additional 32 monitor outputs on each matrix bay . Refer to Figure 31. Y ou can connect a maximum of eight bays in a downframing configuration for a total MXB capacity of 256 mo ...

  • Pelco C1555M-F - page 44

    C1555M-F (10/05) 43 Refer to the Downframing section on the following page for instructions on setting the termination jumpers in the downframed bays. Figure 31. Downframing with DFC Cards Figure 32. Looping Video Out in a Downframed Configuration ...

  • Pelco C1555M-F - page 45

    44 C1555M-F (10/05) A downframe cable is used to connect the bottom connector of the RPC card to a downframe card. Figure 33. DFC Cable Downframe Cards The following downframe cards are available for the System 9770: • CM9770-DFC—This is the “no looping” downframe card. • CM9770-DFL—This is the “looping” downframe card. If you are d ...

  • Pelco C1555M-F - page 46

    C1555M-F (10/05) 45 Figure 34. DFC Card Figure 35. CM9770-DFL Card INPUT FROM BAY ABOVE (LOWER-NUMBERED SLOT) INPUT FROM BAY ABOVE (HIGHER-NUMBERED SLOT) OUTPUT TO BAY BELOW (HIGHER-NUMBERED SLOT) OUTPUT TO BAY BELOW (LOWER-NUMBERED SLOT) JP16 JP15 JP14 JP13 JP12 JP11 JP10 JP9 JP8 JP7 JP6 JP5 JP4 JP3 JP2 JP1 JP32 JP31 JP30 JP29 JP28 JP27 JP26 JP25 ...

  • Pelco C1555M-F - page 47

    46 C1555M-F (10/05) HOW TO INSTALL OR REPLACE A CM9700-SER CARD IN THE CC1 If you have ordered a replacement or additional CM9700-SER serial communication card, complete the following steps to configure the jumpers on the CC1 board for the slot position the new SER card will occupy . 1. T urn off the CC1 power switch. 2. Remove the top cover of th ...

  • Pelco C1555M-F - page 48

    C1555M-F (10/05) 47 Figure 37. SER Card Jumper Assignments 4. Insert the new SER card into an available ISA slot. The default CM9700-CC1 configuration provides SER cards in ISA slots 1 and 2, so you will most likely insert the new card into slot 3 or 4. Refer to Figure 38. 5. Replace the top cover of the CC1. 6. Power up the CC1. Figure 38. How to ...

  • Pelco C1555M-F - page 49

    48 C1555M-F (10/05) V IDEO INPUT CARD (CM9770-VCC) DETAIL Figure 39. CM9770-VCC Card T able H. Video Input Card (CM9770-VCC) LEDs Front Panel Label Color When LED Is On + Green The +5 VDC power source is functioning properly . - Green The -5 VDC power source is functioning properly. HB Amber The CPU is active; this “heartbeat” LED blinks at a d ...

  • Pelco C1555M-F - page 50

    C1555M-F (10/05) 49 MONITOR OUTPUT CARD (CM9770-VMC) DETAIL Figure 40. CM9770-VMC Card T able I. Monitor Output Card (CM9770-VMC) LEDs Front Panel Label Color When LED is on or blinking + Green The +5 VDC power source is functioning properly . - Green The -5 VDC power source is functioning properly. HB Amber The CPU is active; this “heartbeat” ...

  • Pelco C1555M-F - page 51

    50 C1555M-F (10/05) The monitor output card DIP switch selects various options. These switches are set in the proper position at the factory , but they can be changed, if necessary . T able J. Monitor Output Card DIP Switch Switch 1 ON OFF Color System PA L NTSC Switch 3 OFF ON OFF ON Switch 2 OFF OFF ON ON Port 1 RS-422 Baud Rate 9600 19200* 57600 ...

  • Pelco C1555M-F - page 52

    C1555M-F (10/05) 51 NETWORKING Networking of systems is required when the following conditions apply: • T wo or more individual systems need to share video and control features. The CM9700-NW1 network interface unit (NIU) allows you to link any combination of the following systems into a network: – One or more System 9740 or 9760 systems (note ...

  • Pelco C1555M-F - page 53

    52 C1555M-F (10/05) CONNECTING SATELLITE DEVICES Y ou can connect a CM6800E-48X8 matrix switcher or a CM9760-SA T device to the System 9770. Refer to the CM9760-SA T Installation/Operation manual or to the CM6800E-48X8 Installation/Operation manual for instructions. The procedure for using a satellite device with a CM9700-CC1 is the same as for a C ...

  • Pelco C1555M-F - page 54

    C1555M-F (10/05) 53 HOW TO INSTALL V IDEO PATCH PANELS (CM9700-VPP) There are two ways you can mount a CM9700-VPP video patch panel into a rack. 1. Single panels onto a rack 2. Up to 16 panels using the CM9700-VPP-RK The following illustration shows how to mount a single panel onto a rack. The panel is mounted horizontally . Figure 44. CM9700-VPP H ...

  • Pelco C1555M-F - page 55

    54 C1555M-F (10/05) MOUNTING THE CM9770-MXB IN AN OPEN RACK Figure 46. Mounting the CM9770-MXB in an Open Rack ...

  • Pelco C1555M-F - page 56

    C1555M-F (10/05) 55 DOS ENVIRONMENT AND COMMAND REFERENCE DOS stands for Disk Operating System. Every time you turn on the CM9700-CC1 or every time you reboot (Alt +Ctrl +Del), the computer loads DOS from the CC1 disk into the memory (RAM). Once loaded DOS lets you run other programs, in particular , the CM9700.EXE program. On factory-configured s ...

  • Pelco C1555M-F - page 57

    56 C1555M-F (10/05) File Names and DOS File names in DOS are limited to eight characters. If you issue a command to change the name of the configuration files in the 9700 directory to a name exceeding eight characters, the name is truncated to eight characters. The Windows-based CM9700-MGR program does not allow you to use more than eight alphanu ...

  • Pelco C1555M-F - page 58

    C1555M-F (10/05) 57 If you entered the same command again (CD..) at the c:9700> prompt and pressed the ENTER key , you would finally end up again at the root directory as previously done. T o proceed directly from the directory you are in to another directory , no matter where in the directory tree you are, enter the total directory path of th ...

  • Pelco C1555M-F - page 59

    58 C1555M-F (10/05) DOS REFERENCE The following table provides a list of the most common DOS commands that you are most likely to use when operating the CC1. In addition, you can use the command HELP to access the MS-DOS command reference on the CC1. T able K. DOS Command Reference Directory NOTE: In DOS, the backslash symbol (“ “) used alone ...

  • Pelco C1555M-F - page 60

    C1555M-F (10/05) 59 COMMAND EXAMPLE(S) SWITCHES COMMENTS FASTHELP C:> F ASTHELP Lists and briefly describes every command provided with MS-DOS. This list is much less detailed than the list you get using the “HELP” command. C:>FASTHELP DIR Specifies the name of the command that you wish F ASTHELP to give information about. In this exa ...

  • Pelco C1555M-F - page 61

    60 C1555M-F (10/05) T roubleshooting Problems with the CC1 Problems with the CC1 as part of a 9770 system may occur in the following areas: • The CC1 itself • Setup files (also known as configuration files) • Peripheral devices connected to the CC1 • DOS operating system A log is recommended for keeping track of changes made to the syste ...

  • Pelco C1555M-F - page 62

    C1555M-F (10/05) 61 Monitor Display Problems Problem: T ext characters (such as in camera titles) do not display properly . Solution: The CM9770-VMC monitor output card in the matrix bay may not be set for the correct video format (NTSC or P AL). Check switch 1 on the DIP switch and verify that the switch is in the correct position, as identified ...

  • Pelco C1555M-F - page 63

    62 C1555M-F (10/05) Specifications CM9700-CC1 ELECTRICAL Input V oltage 120 V AC, 60 Hz or 230 VAC, 50 Hz, autoranging Power Consumption 57 watts Processor Pentium ® class CPU Clock Speed 733 MHz Memory 64 MB RAM Disk Drive 3.5-inch, 1.44 MB Flash Disk Storage 32 MB solid-state flash memory Diagnostic Monitor Output 1, VGA I/O Ports Sixteen RS-4 ...

  • Pelco C1555M-F - page 64

    C1555M-F (10/05) 63 CM9770-MXB ELECTRICAL Input V oltage 100-240 V AC, 50/60 Hz, autoranging Power Consumption 60 watts maximum (fully populated) Communication Full duplex RS-422 using an RJ-45 connector VIDEO Inputs Card slots support up to 256 inputs per bay Outputs T wo output card slots for supporting 32 outputs per bay Video Input Level 0.5 to ...

  • Pelco C1555M-F - page 65

    64 C1555M-F (10/05) Regulatory Notices CM9780-MXB This device complies with Part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) this device may not cause harmful interference, and (2) this device must accept any interference received, including interference that may cause undesired operation. RADIO AND TELEVISION INT ...

  • Pelco C1555M-F - page 66

    PRODUCT WARRANTY AND RETURN INFORMA TION WARRANTY Pelco will repair or replace, without charge, any merchandise proved defective in material or workmanship for a period of one year after the date of shipment. Exceptions to this warranty are as noted below: • Five years on FT/FR8000 Series fiber optic products. • Three years on Genex ® Series ...

  • Pelco C1555M-F - page 67

    W orldwide Headquarters 3500 Pelco W ay Clovis, California 93612 USA USA & Canada T el: 800/289-9100 Fax: 800/289-9150 International T el: 1-559/292-1981 Fax: 1-559/348-1120 www .pelco.com ISO 9001 United States | Canada | United Kingdom | The Netherlands | Singapore | Spain | Scandinavia | France | Middle East ...

メーカー Pelco カテゴリー Security Camera

Pelco C1555M-Fのメーカーから受け取ることができるドキュメントは、いくつかのグループに分けられます。その一部は次の通りです:
- #BRANDの図面#
- C1555M-Fの取扱説明書
- Pelcoの製品カード
- パンフレット
- またはPelco C1555M-Fの消費電力シール
それらは全部重要ですが、デバイス使用の観点から最も重要な情報は、Pelco C1555M-Fの取扱説明書に含まれています。

取扱説明書と呼ばれる文書のグループは、Pelco C1555M-Fの取り付け説明書、サービスマニュアル、簡易説明書、またはPelco C1555M-Fのユーザーマニュアル等、より具体的なカテゴリーに分類されます。ご必要に応じてドキュメントを検索しましょう。私たちのウェブサイトでは、Pelco C1555M-Fの製品を使用するにあたって最も人気のある説明書を閲覧できます。

関連する取扱説明書

Pelco C1555M-Fデバイスの取扱説明書はどのようなものですか?
取扱説明書は、ユーザーマニュアル又は単に「マニュアル」とも呼ばれ、ユーザーがPelco C1555M-Fを使用するのを助ける技術的文書のことです。説明書は通常、全てのPelco C1555M-Fユーザーが容易に理解できる文章にて書かれており、その作成者はその分野の専門家です。

Pelcoの取扱説明書には、基本的な要素が記載されているはずです。その一部は、カバー/タイトルページ、著作権ページ等、比較的重要度の低いものです。ですが、その他の部分には、ユーザーにとって重要な情報が記載されているはずです。

1. Pelco C1555M-Fの説明書の概要と使用方法。説明書にはまず、その閲覧方法に関する手引きが書かれているはずです。そこにははPelco C1555M-Fの目次に関する情報やよくある質問、最も一般的な問題に関する情報を見つけられるはずです。つまり、それらはユーザーが取扱説明書に最も期待する情報なのです。
2. 目次。Pelco C1555M-Fに関してこのドキュメントで見つけることができる全てのヒントの目次
3. Pelco C1555M-Fデバイスの基本機能を使うにあたってのヒント。 Pelco C1555M-Fのユーザーが使い始めるのを助けてくれるはずです。
4. トラブルシューティング。Pelco C1555M-Fに関する最も重要な問題を診断し、解決するために役立つ体系化された手続き
5. FAQ。よくある質問
6. 連絡先。一人では問題を解決できない場合に、その国におけるPelco C1555M-Fのメーカー/サービスへの連絡先に関する情報。

Pelco C1555M-Fについてご質問がありますか?

次のフォームを使用してください

見つけた説明書を読んでもPelco C1555M-Fの問題を解決できない場合、下記のフォームを使用して質問をしましょう。ユーザーのどなたかがPelco C1555M-Fで同様の問題を抱えていた場合、その解決方法を共有したいと考えるかもしれません。

画像のテキストを入力してください

コメント (0)