-
Zanussi CH 250 - page 1
INTEGRA TED COOKER HOOD CH 250 INSTRUCTION BOOKLET ...
-
Zanussi CH 250 - page 2
2 Thank you for buying a Zanussi product. T o enable you to use your appliance effectively and safely , please read this instruction book carefully before using the appliance and retain for future reference. If you require guidance in the use of the appliance or require further information on Zanussi Products, please contact our Customer Care Depar ...
-
Zanussi CH 250 - page 3
3 IMPORT ANT SAFETY INFORMA TION These warnings are provided in the interests of your safety . Ensure that you understand them all before installing or using this appliance. Y our safety is of paramount importance. If you are unsure about any of the meanings of these warnings contact the Customer Care Department. Installation • Any installation w ...
-
Zanussi CH 250 - page 4
4 YOUR APPLIANCE OPERA TING INSTRUCTIONS This cooker hood is designed to extract unpleasant odours from the kitchen, it will not extract steam. T o obtain the best performance it is advisable to switch on the hood a few minutes before you start cooking and leave it running for approximately 15 minutes after finishing. The cooker hood controls are l ...
-
Zanussi CH 250 - page 5
5 The appliance can be installed to recirculate or extract contaminated air . The cooker hood is more effective when used in the extraction mode. Recirculation The cooker hood is supplied specified for use in the recirculation mode with the charcoal filter fitted. In the recirculation mode contaminated air is passed through the charcoal filter to b ...
-
Zanussi CH 250 - page 6
6 MAINTENANCE AND CLEANING Before carrying out any maintenance or cleaning isolate the cooker hood from the mains supply . The cooker hood must be kept clean, a build up of grease or fat can be a fire hazard. External Cleaning Wipe the cooker hood frequently with warm soapy water using a mild detergent. Always wear protective gloves when cleaning t ...
-
Zanussi CH 250 - page 7
7 Synthetic Paper Grease Filter The filter has saturation indicators, which are small squares made from a series of dots. When the white paper inside the squares becomes saturated with grease the coloured dots start to run and spread across the paper , indicating that the filter has reached saturation point and must be replaced. The synthetic paper ...
-
Zanussi CH 250 - page 8
8 SOMETHING NOT WORKING SERVICE AND SP ARE P ARTS If, having followed these instructions carefully , your cooker hood fails to work properly please carry out the following checks. Symptom The cooker hood will not start The cooker hood is not working effectively The cooker hood has switched off during operation If after all these checks, the problem ...
-
Zanussi CH 250 - page 9
9 PEACE OF MIND FOR TWENTY FOUR MONTHS ST ANDARD GUARANTEE CONDITIONS We, Zanussi Ltd., undertake that if within twenty four months of the date of the purchase this Zanussi built-in appliance or any part there of is proved to be defective by reason only of faulty workmanship or materials, the company will, at our option repair or replace the same F ...
-
Zanussi CH 250 - page 10
10 INST ALLA TION INSTRUCTIONS It is dangerous to alter the specifications or attempt to modify this product in any way . T echnical Information DIMENSIONS HEIGHT : 15 cm WIDTH: 60 cm DEPTH: 48 cm WEIGHT GROSS: 8,5 kg NET : 7,4 kg ELECTRICAL SUPPL Y : V oltage (50Hz) 220-240 V POWER CONSUMPTION: 190 W F AN MOTOR: 1 10 W LAMP: 2 x 40 80 W SUIT ABLE ...
-
Zanussi CH 250 - page 11
11 INST ALLING THE COOKER HOOD Please ensure that when the appliance is installed it is easily accessible to an engineer in the event of a breakdown. All installations must comply with the local authorities requirements for the discharge of exhaust air. Incorrect installation may affect the safety of this cooker hood. Installation Requirements Befo ...
-
Zanussi CH 250 - page 12
12 A: Built-in Electric Hob: 650mm minimum clearance B: Built-in Gas hob: 700mm minimum clearance C: Slot-in Electric Cooker: 685mm minimum clearance D: Slot-in Gas Cooker: 787mm minimum clearance Hob Clearance Height A minimum clearance height of 650mm (25 1 / 2 ”) is required when installed above a built-in electric hob, or 700mm (27 1 / 2 ”) ...
-
Zanussi CH 250 - page 13
13 V enting The hood is more effective when used in the extraction setting (ducted to the outside). V enting kits maybe purchased through your retailer or DIY store, and must be ducted to an outside vent of 100mm (4”) minimum. The ducting used must be manufactured from fire retardant material which should conform to the relevant British Standard ...
-
Zanussi CH 250 - page 14
14 W all Cabinet Fitting Before fitting the cooker hood beneath any type of wall cabinet ensure it is firmly fixed to the wall in accordance with the manufacturers instructions. 1. Use the paper template provided to mark the hole positions on the underside of the cabinet. Ensure the front edges of the template are aligned with the front edge of the ...
-
Zanussi CH 250 - page 15
15 5. T urn the screws clockwise to lift the front edge of the hood and use a spirit level to check the hood is positioned at right angles to the wall before fitting the security system. 6. The wall brackets have two studs and when the cooker hood is hung onto the brackets the studs project trought the holes above the levelling screws. 7. When the ...
-
Zanussi CH 250 - page 16
4324165 02 - 230300 © Electrolux Household Appliances Limited 2000 ...
Zanussi CH 250についてご質問がありますか?
次のフォームを使用してください
見つけた説明書を読んでもZanussi CH 250の問題を解決できない場合、下記のフォームを使用して質問をしましょう。ユーザーのどなたかがZanussi CH 250で同様の問題を抱えていた場合、その解決方法を共有したいと考えるかもしれません。