-
Pelco CM9700-SER-32 - page 1
CM9700-SER-32 Port Expander INSTALLATION/OPERATION C579M-A (5/05) ...
-
Pelco CM9700-SER-32 - page 2
...
-
Pelco CM9700-SER-32 - page 3
C579M-A (5/05) 3 Contents Regulatory Notices . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ...
-
Pelco CM9700-SER-32 - page 4
4 C579M-A (5/05) Regulatory Notices This device complies with Part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) this device may not cause harmful interference, and (2) this device must accept any interference received, including interference that may cause undesired operation. RADIO AND TELEVISION INTERFERENCE This ...
-
Pelco CM9700-SER-32 - page 5
C579M-A (5/05) 5 Installation The CM9700-SER-32 port expander assembly increases by 32 the number of available Sercom (serial communication) ports in a node-based CM9700-CC1 via the installation of an RP (rocket port) PCI expansion card. A maximum of 120 total ports can be achieved by using three CM9700-SER-32 assemblies in conjunction with the Ser ...
-
Pelco CM9700-SER-32 - page 6
6 C579M-A (5/05) e. Reinstall the top cover and secure with mounting screws. Figure 2. Removing the CC1 T op Cover Figure 3. CC1 Internal Layout 3. Mount external hardware. Refer to Figure 1 and do the following: a. Mount the port expansion unit so that the two supplied data cables will reach the CC1 unit. The data cables are three feet in length. ...
-
Pelco CM9700-SER-32 - page 7
C579M-A (5/05) 7 e. Connect peripherals to desired expansion ports. Refer to RP1 in Figure 4. Figure 4. Rocket Card to Expansion Port Control Association 4. Apply power to the CC1. After applying power , press the Delete key on the keyboard to enter into the BIOS menu settings, and then do the following: a. After “ENTER CURRENT P ASSWORD” appea ...
-
Pelco CM9700-SER-32 - page 8
8 C579M-A (5/05) 4 SERCOM CARDS, 2 ROCKET PORT CARDS, COM 2 UNAVAILABLE (96 T OTAL PORTS) 1. T urn off all power to the CC1. Disconnect and label all attached cabling. 2. Install the RP cards into the CC1. Refer to Figure 2 and Figure 3 and do the following: a. Remove the top cover mounting screws. b. From the rear , tilt the top cover up at a slig ...
-
Pelco CM9700-SER-32 - page 9
C579M-A (5/05) 9 8. Scroll down to PERIPHERAL SETTINGS, press Enter , and then do the following: a. Scroll down to ONBOARD SERIAL PORT 2. b. Change the setting to DISABLED by pressing Page Down. c. Press Esc. d. Scroll down to SA VE SETTINGS AND EXIT and type Y e. Press Enter . 9. Reboot machine by pressing Ctrl+Alt+Del. 3 SERCOM CARDS, 2 ROCKET PO ...
-
Pelco CM9700-SER-32 - page 10
10 C579M-A (5/05) Figure 5. Sercom Card Mounting Plate Removal NOTE: If the VGA card is present in PCI slot 2, remove the retaining screw and gently pull the card up. Reinstall the card into PCI slot 4 (follow steps d, e, and f, applying them to the VGA card and PCI slot 4). d. Remove the retaining screw and slot cover for PCI slot 2. Slide the cov ...
-
Pelco CM9700-SER-32 - page 11
C579M-A (5/05) 11 Figure 7. CM9700-ADP-120 Adapter Plate Installation 6. Reinstall the top cover and secure with mounting screws. 7. Mount external hardware. Refer to Figure 1 and do the following: NOTE: This procedure is for each individual port expansion assembly (one RP card and port expansion unit) and is to be duplicated for each RP card insta ...
-
Pelco CM9700-SER-32 - page 12
12 C579M-A (5/05) 3 SERCOM CARDS, 3 ROCKET PORT CARDS, COM 2 UNAVAILABLE (120 T OTAL PORTS) 1. T urn off all power to the CC1. Disconnect and label all attached cabling. 2. Remove the top cover mounting screws (refer to Figure 2). 3. From the rear , tilt the top cover up at a slight angle, and then pull backwards away from the front edge to remove ...
-
Pelco CM9700-SER-32 - page 13
C579M-A (5/05) 13 7. Mount external hardware. Refer to Figure 1 and do the following: NOTE: This procedure is for each individual port expansion assembly (one RP card and port expansion unit) and is to be duplicated for each RP card installed in the CM9700-CC1. Power should not be applied until all physical connections have been secured. a. Mount t ...
-
Pelco CM9700-SER-32 - page 14
14 C579M-A (5/05) ...
-
Pelco CM9700-SER-32 - page 15
PRODUCT WARRANTY AND RETURN INFORMA TION WARRANTY Pelco will repair or replace, without charge, any merchandise proved defective in material or workmanship for a period of one year after the date of shipment. Exceptions to this warranty are as noted below: • Five years on FT/FR8000 Series fiber optic products. • Three years on Genex ® Series ...
-
Pelco CM9700-SER-32 - page 16
W orldwide Headquarters 3500 Pelco W ay Clovis, California 93612 USA USA & Canada T el: 800/289-9100 Fax: 800/289-9150 International T el: 1-559/292-1981 Fax: 1-559/348-1120 www .pelco.com ISO 9001 United States | Canada | United Kingdom | The Netherlands | Singapore | Spain | Scandinavia | France | Middle East ...
Pelco CM9700-SER-32についてご質問がありますか?
次のフォームを使用してください
見つけた説明書を読んでもPelco CM9700-SER-32の問題を解決できない場合、下記のフォームを使用して質問をしましょう。ユーザーのどなたかがPelco CM9700-SER-32で同様の問題を抱えていた場合、その解決方法を共有したいと考えるかもしれません。