GE 229C4053P447-3 1の取扱説明書

12ページ 0.74 mb
ダウンロード

ページに移動 of 12

Summary
  • GE 229C4053P447-3 1 - page 1

    Skill Level: High A verage Low Completion Time: 1 to 3 Hours Proper installation is the responsibility of the installer . Product failure due to improper installation is not covered under the GE Appliance W arranty . See the Owners Manual for warranty information. CAUTION: Before you begin Read these instructions carefully and completely . • IMPO ...

  • GE 229C4053P447-3 1 - page 2

    All rough-in and spacing dimensions must be met for safe use of your range. Electricity to the range can be disconnected at the outlet without moving the range if the outlet is in the preferred location (remove lower drawer). T o reduce the risk of burns or fire when reaching over hot surface elements, cabinet storage space above the cooktop should ...

  • GE 229C4053P447-3 1 - page 3

    3 Installation Instructions Pre- Installation Checklist Preparing the Range Open oven door and remove literature pack, broiler pan and grid, and oven racks. Remove packaging materials. Any packaging materials must be removed during installation. This will include adhesive tape, wire ties, cardboard and protective plastic. Failure to remove these ma ...

  • GE 229C4053P447-3 1 - page 4

    4 Installation Instructions Installation Required Clearances A ***6" MIN **30" MIN **15" MIN *0" *0" See Ilustrations below for all rough-in and spacing dimensions. The range may be placed with 0 ” clearance (flush) at the back wall and side walls of the cabinet. MINIMUM DIMENSIONS BETWEEN COOKTOP , W ALLS, AND ABOVE THE ...

  • GE 229C4053P447-3 1 - page 5

    5 Installation Instructions Electrical Connections B B1 Making the Electrical Connection Remove the wire cover (on the back of the range) by removing 5 screws using a 1/4 ” nut driver . Do not discard these screws. B2 All new constructions, mobile homes and installations where local codes do not allow grounding through neutral. This appliance mus ...

  • GE 229C4053P447-3 1 - page 6

    Installation Instructions Electrical Connections cont. B B3 Complete 4 wire cord kit. Below are step by step instructions on how to install the kit. B4 Remove the screws on the terminal block with a 1/4 ” nut driver or phillips screwdriver . Remove 3 screws B5 B6 Remove the ground screw using a 5/16 ” nut driver , then remove and discard the gr ...

  • GE 229C4053P447-3 1 - page 7

    Installation Instructions Electrical Connections cont. B B3a Complete 3 wire cord kit. Below are step by step instructions on how to install the kit. B4a Remove the screws on the terminal block with a 1/4 ” nut driver or phillips screwdriver . Remove 3 screws B5a B6a Install the three-wire cord and strain relief through the hole in the connection ...

  • GE 229C4053P447-3 1 - page 8

    8 Installation Instructions Installing the Anti-Tip Bracket C a. For concrete installation you will need two 1/4"x 1-1/2" lag screws, and two sleeve anchors. b. Locate the center of the four holes identified in Fig. 1 as Floor-Concrete and Wall. Drill the recommended size holes in each. c. Install the sleeve anchors into the predrilled co ...

  • GE 229C4053P447-3 1 - page 9

    9 Installation Instructions Installing the Range D D4 When installation is complete and the range is in place, inspect to be sure the rear leveling leg is fully inserted into the slot of the Anti-Tip Bracket. Final Check of the Anti-Tip Bracket D1 Pull the drawer out until it stops Storage Drawer Removal D2 Lift the front of the drawer until the st ...

  • GE 229C4053P447-3 1 - page 10

    10 Installation Instructions Installing the Range cont. D Place the drawer rail on the guides. Replacing the Storage Drawer D13 Push the drawer in until it stops. D14 Lift the front of the drawer and push in until the stops clear the guides. IF DRA WER WON'T CLOSE Remove and replace, making sure the power cord is not obstructing the drawer and ...

  • GE 229C4053P447-3 1 - page 11

    11 Final Check List Operation Check List Check to make sure the circuit breaker is closed (Reset) or the circuit fuses are replaced. Be sure power is in service to the building. Check to be sure that all packing materials and tape on metal panel (if applicable) under control knobs have been removed. Check to make sure the Clock display is energized ...

  • GE 229C4053P447-3 1 - page 12

    12 NOTES Pub. No. 31-10463 229C 4053P447-3 ...

メーカー GE カテゴリー Range

GE 229C4053P447-3 1のメーカーから受け取ることができるドキュメントは、いくつかのグループに分けられます。その一部は次の通りです:
- #BRANDの図面#
- 229C4053P447-3 1の取扱説明書
- GEの製品カード
- パンフレット
- またはGE 229C4053P447-3 1の消費電力シール
それらは全部重要ですが、デバイス使用の観点から最も重要な情報は、GE 229C4053P447-3 1の取扱説明書に含まれています。

取扱説明書と呼ばれる文書のグループは、GE 229C4053P447-3 1の取り付け説明書、サービスマニュアル、簡易説明書、またはGE 229C4053P447-3 1のユーザーマニュアル等、より具体的なカテゴリーに分類されます。ご必要に応じてドキュメントを検索しましょう。私たちのウェブサイトでは、GE 229C4053P447-3 1の製品を使用するにあたって最も人気のある説明書を閲覧できます。

関連する取扱説明書

GE 229C4053P447-3 1デバイスの取扱説明書はどのようなものですか?
取扱説明書は、ユーザーマニュアル又は単に「マニュアル」とも呼ばれ、ユーザーがGE 229C4053P447-3 1を使用するのを助ける技術的文書のことです。説明書は通常、全てのGE 229C4053P447-3 1ユーザーが容易に理解できる文章にて書かれており、その作成者はその分野の専門家です。

GEの取扱説明書には、基本的な要素が記載されているはずです。その一部は、カバー/タイトルページ、著作権ページ等、比較的重要度の低いものです。ですが、その他の部分には、ユーザーにとって重要な情報が記載されているはずです。

1. GE 229C4053P447-3 1の説明書の概要と使用方法。説明書にはまず、その閲覧方法に関する手引きが書かれているはずです。そこにははGE 229C4053P447-3 1の目次に関する情報やよくある質問、最も一般的な問題に関する情報を見つけられるはずです。つまり、それらはユーザーが取扱説明書に最も期待する情報なのです。
2. 目次。GE 229C4053P447-3 1に関してこのドキュメントで見つけることができる全てのヒントの目次
3. GE 229C4053P447-3 1デバイスの基本機能を使うにあたってのヒント。 GE 229C4053P447-3 1のユーザーが使い始めるのを助けてくれるはずです。
4. トラブルシューティング。GE 229C4053P447-3 1に関する最も重要な問題を診断し、解決するために役立つ体系化された手続き
5. FAQ。よくある質問
6. 連絡先。一人では問題を解決できない場合に、その国におけるGE 229C4053P447-3 1のメーカー/サービスへの連絡先に関する情報。

GE 229C4053P447-3 1についてご質問がありますか?

次のフォームを使用してください

見つけた説明書を読んでもGE 229C4053P447-3 1の問題を解決できない場合、下記のフォームを使用して質問をしましょう。ユーザーのどなたかがGE 229C4053P447-3 1で同様の問題を抱えていた場合、その解決方法を共有したいと考えるかもしれません。

画像のテキストを入力してください

コメント (0)