n o n o i t a m r o f n i g n i k e e s n e h W . r o t c a r t n o c g n i t a e h r u o y l l a c , r e l i o b o t s r i a p e r r o e c i v r e s r o F . l e b a L g n i t a R n o n w o h s s a r e b m u N l a i r e S d n a r e b m u N l e d o M r e l i o B e d i v o r p , r e l i o b r e b m u N l e d o M r e l i o Br e b m u N l a i r e S r e ...
-
Burnham SM-6 - page 2
2 IMPORT ANT INFORMA TION PLEASE READ THIS P AGE CAREFULL Y This boiler has a limited warranty , a copy of which is printed on the back page of this manual. All heating systems should be designed by competent contractors and only persons knowledgeable in the layout and installation of hydronic heating systems should attempt installation of any boil ...
-
Burnham SM-6 - page 3
3 MAXIMUM DESIGN WORKING PRESSURE – 45 PSI; W A TER ONL Y Figure 1 SP ACEMASTER W ALL MOUNTED GAS BOILER – DIMENSIONAL DA T A I. General Installation Requirements ................... 4 II. Installation Instructions ..................................... 7 III. Operating Instructions ....................................... 13 IV . Service ....... ...
-
Burnham SM-6 - page 4
4 I. General Installation Requirements 1 INSPECT SHIPMENT carefully for any signs of damage. All equipment is carefully manufactured, inspected and packed. Our responsibility ceases upon delivery of Boiler to the carrier in good condition. Any claims for damage or shortage in shipment must be fi led immediately against the carrier by the consignee ...
-
Burnham SM-6 - page 5
5 Minimum listed clearances from combustible materials for non-closet installation or closet installation. (See Figure 3). T op — 6” *Left Side —1” Rear — 0” Right Side — 1” *Front — 2” Flue — 0” Floor — 6” Since the above dimensions are measured between boiler jacket and combustible walls or ceiling, practical service c ...
-
Burnham SM-6 - page 6
6 T ABLE II *NOTE – For all practical purposes, each 90° elbow can be considered as the following equivalent in length of straight pipe: ½” – 1.6 ft. 1” – 2.6 ft. ¾” – 2.1 ft. f o t e e F c i b u C n i g n i p i P f o y t i c a p a C m u m i x a M r u o H r e P s a G d n a r e t a W " 5 . 0 f o p o r D e r u s s e r P a n o d ...
-
Burnham SM-6 - page 7
7 II. Installation Instructions DETERMINE BEST MOUNTING LOCA TION for boiler which meets site requirements outlined in Section I, pages 4 through 6. 1 INSTALLING BOILER MOUNTING WALL BRACKET (See Figure 5). a. Locate wall bracket packed in miscellaneous parts carton. b. Hold wall bracket in desired location. On studded walls, mounting bracket must ...
-
Burnham SM-6 - page 8
8 h. Secure boiler to boiler mounting wall bracket with fi ve (5) ¼”-20 x ¾” long machine screws and washers provided. NOTE: T ools required — 7/16” socket, extension bar(s) and drive ratchet i. Secure interior telescoping intake air duct to back plate of boiler . Pull duct forward until duct and weld studs are engaged through 4½” x 5 ...
-
Burnham SM-6 - page 9
9 b. Drill four (4) pilot holes, properly sized for the non-corrosive fasteners (stainless steel, brass or aluminum) to be used to secure the wall fl ange to wall. c. Attach four (4) ½” long threaded aluminum spacers to the outer fl anges of the exterior telescoping intake air duct wall fl ange with four (4) #10-32 x ¼” long stainless stee ...
-
Burnham SM-6 - page 10
10 e. A hot water boiler installed above radiation level must be provided with a low water cutoff device as part of the installation. If a low water cut-off is required, it must be mounted in the system piping above the boiler . The minimum safe water level of a hot water boiler is just above the highest water containing cavity of the boiler; that ...
-
Burnham SM-6 - page 11
11 Figure 7 RECOMMENDED PIPING FOR COMBINA TION HEA TING & COOLING (REFRIGERA TION) SYSTEMS Figure 9 EXPLODED JACKET ASSEMBL Y ...
-
Burnham SM-6 - page 12
12 support the removable door . (See Figure 9). Place jacket top panel over top side panels with ventilation louvers to the left. Secure top panel with four (4) #8 x ½” long sheet metal screws provided. e. Lift jacket bottom panel up to bottom of side panels with front channel forward and ventilation louvers to the left. Secure bottom panel with ...
-
Burnham SM-6 - page 13
13 Safe lighting and other performance criteria were met with the gas manifold and control assembly provided on the boiler when the boiler underwent tests speci fi ed in ANSI Z21.13. 1 INSPECT INSTALLATION BEFORE STARTING. 2 INITIAL START a . FILL ENTIRE HEATING SYSTEM WITH WATER and vent air from system. V ent air from all heat distributing units ...
-
Burnham SM-6 - page 14
14 NOTE: YOUR BOILER IS EQUIPPED WITH A HONEYWELL VR8204 OR VR8304 GAS V AL VE. PLEASE FOLLOW THESE OPERA TING INSTRUCTIONS: ...
-
Burnham SM-6 - page 15
15 Figure 1 1 SCHEMA TIC WIRING DIAGRAM ...
-
Burnham SM-6 - page 16
16 Figure 12 LADDER WIRING DIAGRAM ...
-
Burnham SM-6 - page 17
17 SEQUENCE OF OPERA TION 1. When the thermostat calls for heat, relay coil (1M) is energized closing two sets of NO contacts. One set (1M2) energizes the 24 volt limit circuit and the other set (1M1) completes the 120 volt circulator circuit. 2. W ith the thermal cutout switch (on the burner access panel), the high limit switch, and the suction pr ...
-
Burnham SM-6 - page 18
18 Use the T rouble Shooting Guide (pages 19 to 21) to assist in locating where a malfunction in the control system is occurring. 4 PROCEDURE FOR MEASURING FAN DIFFERENTIAL PRESSURE (See Figure 13). a. W ith boiler off, remove black silicone tubing from low side of pressure switch. b. W ith tee and ¼” aluminum stubs, connect manometer as shown w ...
-
Burnham SM-6 - page 19
19 ...
-
Burnham SM-6 - page 20
20 ...
-
Burnham SM-6 - page 21
21 ...
-
Burnham SM-6 - page 22
22 6 CHECK PILOT FLAME. Flame should be a blue medium hard fl ame enveloping approximately 3/8” of the end of the sensing probe, see Figure 14. 7 CHECK THERMOST A T OPERA TION. Raise and lower thermostat setting as required to start and stop burners. 8 CHECK HIGH LIMIT CONTROL. Allow boiler to operate until burners are shut down by limit control ...
-
Burnham SM-6 - page 23
23 IV . Service 1 GENERAL — Inspection should be conducted annually . Service as frequently as speci fi ed in paragraphs below . While service or maintenance is being done, Electrical Power and all Gas Supply to the Boiler must be “off.” N O I T U A C n e h w n o i t c e n n o c s i d o t r o i r p s e r i w l l a l e b a L e s u a c n a c s ...
-
Burnham SM-6 - page 24
24 where conditions warrant) to fl ush out the sediment chamber so the device will be free to function properly . Low water fuel cutof fs and water feeders should be dismantled annually by quali fi ed personnel, to the extent necessary to insure freedom from obstructions and proper functioning of the working parts. Inspect connecting lines to boi ...
-
Burnham SM-6 - page 25
25 W arning : This product contains refractory ceramic fi bers (RCF). RCF has been classi fi ed as a possible human carcinogen. After this product is fi red, RCF may , when exposed to extremely high temperature (>1800F), change into a known human carcinogen. When disturbed as a result of servicing or repair , RCF becomes airborne and, if inha ...
-
Burnham SM-6 - page 26
26 All Spacemaster™ Repair Parts may be obtained through your local Burnham Wholesale distributor . Should you require assistance in locating a Burnham distributor in your area, or have questions regarding the availability of Burnham products or repair parts, please contact Burnham Customer Service at (717) 481-8400 or Fax (717) 481-8408. V . Rep ...
-
Burnham SM-6 - page 27
27 A 24 V AC L WCO is used primarily for gas fi red boilers where a 24 volt control circuit exists within the boiler . However , a 24 V AC L WCO can only be used if the boiler manufacturer has provided piping and wiring connections and instructions to allow for this application. How to T est Shut off fuel supply . Lower water level until water lev ...
-
Burnham SM-6 - page 28
Boiler Co ., Inc. recommendations and hydronics industry standards. These warranties will be inapplicab le if the residential grade w ater boiler is used or operated ov er its rated capacity , is subjected to unauthor ized modifi cation, or is damaged as a result of being otherwise improperly operated or serviced including, but not limited to , da ...
Burnham SM-6についてご質問がありますか?
次のフォームを使用してください
見つけた説明書を読んでもBurnham SM-6の問題を解決できない場合、下記のフォームを使用して質問をしましょう。ユーザーのどなたかがBurnham SM-6で同様の問題を抱えていた場合、その解決方法を共有したいと考えるかもしれません。