Manual Chief SL220

20 pages Not applicable
Download

Go to site of 20

Summary
  • Chief SL220 - page 1

    INSTALLATION INSTRUCTIONS I nstruccion es de in stal ación I nstal lati onsanl eitu ng I nstruções de Insta lação I struzion i di install azione I nstal lati e-i nstr ucti es I nstructi ons d ´insta llat ion This de vic e comp lies wi th part 1 5 of the FCC ru les. O perat ion is su bjec t to t he fo ll owi ng 2 co nditi on s : (1) Th is d ev ...

  • Chief SL220 - page 2

    SL2 20 Instal latio n Ins truc tion s 2 DISCLAIMER Mil est one A V Technol ogi es, and its af f iliat ed corporations an d subsi di aries ( coll ect ively , "Mil estone" ), intend t o make thi s man ual ac curate and complete. However , Miles tone mak es no cla im tha t the inf ormat ion cont ai ned her ein cover s al l detai ls , condi t ...

  • Chief SL220 - page 3

    Installa tion Ins tru cti ons SL2 20 3 TAB LE OF CONTE NTS DISCLAIMER...... ........ ....... ....... .... ....... ....... .... .... 2 TABLE OF CONTENTS......... ........ ... ........ ....... ... . 3 TOOLS REQUIRED FOR INSTALLATIO N.... .... . 4 PARTS...... ... .... .... ... .... ... ........ ....... .... ....... ....... .... 4 LEGEND........ ...... ...

  • Chief SL220 - page 4

    Installa tion Ins tru cti ons SL2 20 4 TOOLS REQUIRED FOR INSTALLA TION P AR TS I/M x1 A (1 ) [SL220 Li ft] B (1 ) [SL220 Frame] C ( 4 ) [Ver tical Brac ket] D ( 4 ) [Horizon tal Bracket ] E (4 ) 6-3 2 x 1/ 2" F ( 4 ) 6-32 x 5/ 16" H ( 1 ) [Out le t bo x at tachment pl ate] J ( 1) J1 (4 ) 1/ 16" x 25 ’ [Wir e Cabl e] J 2 ( 4) [Cabl ...

  • Chief SL220 - page 5

    Installa tion Ins tru cti ons SL2 20 5 LEGEND DIMENSIONS Tighte n F astener Apretar e le mento de f ijaci ón Befest igungst ei l fest ziehen Apertar f ixador Serrar e il f issag gio Bevestigi ng vastdraai en Serrez l es fixat ions Loosen F astener Afloj ar element o de fij ación Befest igu ngstei l lösen Desape rtar fix ador Allent are il f i ss ...

  • Chief SL220 - page 6

    SL2 20 Instal latio n Ins truc tion s 6 PREP ARING F OR INSTALLA TION Installati on Requirements The SL 220 has been de signed to be mount ed re cessed int o a suspen ded ceiling co nsist ing of 2’ x 2’ c eili ng til es and sec ured by a Wir eVi ce sys tem. Elec tri ca l Ratin g 100-25 0VAC~, 50 /60Hz, 960W Nort h Amer ica: 120 VAC, 60Hz, 8A IM ...

  • Chief SL220 - page 7

    Installa tion Ins tru cti ons SL2 20 7 Securing SL220 Frame to Ceiling Structur e 1. Examine ce iling struct ure (concre te, ste el trus s, or w o od) above SL220 f rame ( B) to ide ntif y fou r suppo rt c able anchor l ocations . Ea ch location sh oul d be a ppro ximately 15° ou tside of s uppor t hol es i n SL220 f rame (B) . Mar k loca tions wi ...

  • Chief SL220 - page 8

    SL2 20 Instal latio n Ins truc tion s 8 Wo od C eiling S tru ct ure WARNING: Anchor s mus t be in sta lled i nto woo d with a minimum thi ckness of 1 -1/2" (38. 1 mm) or greater. 1. Drill a 5/32" diameter x 1 -1/2" deep pilot hole at each marked cab le anchor suppor t l ocatio n. Ensu re hol e is at leas t 5/ 8" f rom near est w ...

  • Chief SL220 - page 9

    Installa tion Ins tru cti ons SL2 20 9 WARNING: IMPROPER INSTALLA TION CAN LEAD TO LIFT F ALLING CAUSING SEVERE PERSONAL INJUR Y OR DA MA G E T O EQ UIP ME NT ! It is the in s ta ll ers r esp on si bilit y to make ce rtain the st ruc ture to whi ch the li ft is be ing mounted i s capa ble o f suppor ting f ive times the wei ght of the lift and al l ...

  • Chief SL220 - page 10

    SL2 20 Instal latio n Ins truc tion s 10 IMPORTANT ! : Selec t power c ord ( W or X) s uitabl e for loca tion. If nei t her of tho se cor ds are su itable for your l oca tion, use a po wer cor d tha t has an attac hment pl ug on one end that meets IEC- 60320 and on the ot her en d is appr opr iate f or use with t he gro unded main out let. 2. Plug ...

  • Chief SL220 - page 11

    Installa tion Ins tru cti ons SL2 20 11 Figure 14 5. While st ill pull ing th e pr ojecto r cradle a way from the si des of the SL220 , slide fro nt cha nnel s towa rds bac k, of f of bearings and remove pr ojector cr adle from SL2 20. (See Figur e 15) Figure 15 PLACING SL220 INTO CEILING STRUCTURE 1. Orien t SL220 so t hat t he re ar of t he S L22 ...

  • Chief SL220 - page 12

    SL2 20 Instal latio n Ins truc tion s 12 Replacing Project or Cradle 1. Sli de fr ont c hannels of pr oject or cr adle fo rward ont o the SL2 20 bear ings. (See Fi gure 18) Figure 18 2. Line u p re ar spacer s wi th attach m ent ho les on SL22 0 arms. (See Figure 19 ) 3. Tight en re ar spacer s. Figure 19 4. Rec onnect gr oundi ng st rap fro m insi ...

  • Chief SL220 - page 13

    Installa tion Ins tru cti ons SL2 20 13 Adjustments 1. Adjus t pro je ctor le ft or right b y looseni ng the w ing nut s on the S L220 cr oss br ack et. (See Fi gure 22) 2. Sli de the SL220 cross b rac ket to t he lef t or ri ght as required. 3. Tight en wi ng nuts . (See F igure 22) Figure 22 4. Adjus t pro jecto r forw ard o r backward by l oosen ...

  • Chief SL220 - page 14

    SL2 20 Instal latio n Ins truc tion s 14 CAUTION: KEEP SL220 OPEN WHILE PROJ ECTOR IS RUNNING OR IN COOLING MODE! Prematur e bul b failure or damag e to elect rical compone nts may occur if l ift cl ose s. Replacing Ceiling Pan 1. Line up smal l pe g on ceili ng pan with hol e in l eg of proj ector cradle. ( See Fig ure 25) 2. Atta ch spr in g on p ...

  • Chief SL220 - page 15

    Installa tion Ins tru cti ons SL2 20 15 Fa ul t Co nd it i on IMPORTANT ! : If t he SL220 cont rol sy ste m sees a fault condi tion it wil l s top t he oper at ion an d a r ed light w ill f la sh on the cont r ol boa rd (vis ible th rou gh the con trol ho using). For m ost fau lt s: 1. Corre ct t he prob lem. (Oftent imes, t he cor d rout ing may n ...

  • Chief SL220 - page 16

    SL2 20 Instal latio n Ins truc tion s 16 RS485 Inf ormati on Communi cati on par amete rs as spe ci fied in ANSI T IA/EIA-485- A: Table 2: CO MM AND STRINGS FOR SL-220 • Th e serial c ont rol command st ring is set up as f ollows : Table 3: SERIAL CONTROL COMMAND STRING • Prod uct ID for the SL-22 0: 05 • Address controlled by dip switch sett ...

  • Chief SL220 - page 17

    Installa tion Ins tru cti ons SL2 20 17 Remote Co ntrol Capabilities The r emote c ontrol has a rang e of 20- 30ft (6-9m ), and is powered by 2 AAA bat te ries tha t are acce ssed from the back of the remot e. NOT E: If oper at ion of the mount is require d at a grea ter dist anc e than r emote co ntrol wil l allo w, th e mou nt can be co ntrol le ...

  • Chief SL220 - page 18

    SL2 20 Instal latio n Ins truc tion s 18 Table 4: WIRING TABLE ...

  • Chief SL220 - page 19

    Installa tion Ins tru cti ons SL2 20 19 ...

  • Chief SL220 - page 20

    SL2 20 Instal latio n Ins truc tion s Chief Man uf actur ing , a produ ct s divi sion of Mile sto ne A V Tec hnologi es 8820-002 009 Rev03  201 1 Milest one A V Tec hnologi es, a Ducho ssois Grou p Company www .c hiefmfg.com 08/1 1 USA/In ternati ona l A 8401 E agl e Creek Par kway , Savage , MN 553 78 P 800.5 82. 6480 / 952.894 .62 80 F 877.894 ...

Manufacturer Chief Category Flat panel support

Documents that we receive from a manufacturer of a Chief SL220 can be divided into several groups. They are, among others:
- Chief technical drawings
- SL220 manuals
- Chief product data sheets
- information booklets
- or energy labels Chief SL220
All of them are important, but the most important information from the point of view of use of the device are in the user manual Chief SL220.

A group of documents referred to as user manuals is also divided into more specific types, such as: Installation manuals Chief SL220, service manual, brief instructions and user manuals Chief SL220. Depending on your needs, you should look for the document you need. In our website you can view the most popular manual of the product Chief SL220.

Similar manuals

A complete manual for the device Chief SL220, how should it look like?
A manual, also referred to as a user manual, or simply "instructions" is a technical document designed to assist in the use Chief SL220 by users. Manuals are usually written by a technical writer, but in a language understandable to all users of Chief SL220.

A complete Chief manual, should contain several basic components. Some of them are less important, such as: cover / title page or copyright page. However, the remaining part should provide us with information that is important from the point of view of the user.

1. Preface and tips on how to use the manual Chief SL220 - At the beginning of each manual we should find clues about how to use the guidelines. It should include information about the location of the Contents of the Chief SL220, FAQ or common problems, i.e. places that are most often searched by users in each manual
2. Contents - index of all tips concerning the Chief SL220, that we can find in the current document
3. Tips how to use the basic functions of the device Chief SL220 - which should help us in our first steps of using Chief SL220
4. Troubleshooting - systematic sequence of activities that will help us diagnose and subsequently solve the most important problems with Chief SL220
5. FAQ - Frequently Asked Questions
6. Contact detailsInformation about where to look for contact to the manufacturer/service of Chief SL220 in a specific country, if it was not possible to solve the problem on our own.

Do you have a question concerning Chief SL220?

Use the form below

If you did not solve your problem by using a manual Chief SL220, ask a question using the form below. If a user had a similar problem with Chief SL220 it is likely that he will want to share the way to solve it.

Copy the text from the picture

Comments (0)