  • Crown Boiler BWC120 - page 1

    BWC070, BWC090, BWC120 Installation Manual Supplement June 12 th , 2007 The following pages are copied from the latest edition of the installation manual for the above boilers, which is not yet in print. These pages cover new vent options that have been added for these boilers and which are not shown in the current manual. These options include: 1) ...

  • Crown Boiler BWC120 - page 2

    VII V enting W ARNING F AILURE T O VENT THIS BOILER IN ACCORDANCE WITH THESE INSTRUCTIONS COULD CAUSE FLUE GAS T O ENTER THE BUILDING RESUL TING IN SEVERE PROPER TY DAMAGE, PERSONAL INJUR Y , OR DEA TH: * Do not attempt to vent this boiler with galvanized, PVC, or any other vent components not listed in T able 7.4. * Do not attempt to mix component ...

  • Crown Boiler BWC120 - page 3

    12 2) Maximum V ent and Air Intake Lengths - The maximum length of the vent air intake piping depends upon the vent option selected and the boiler size. See T able 7.1 or 7.9 for the maximum vent length. In horizontal vent systems, the lengths shown in T able 7.1 are in addition to the first standard elbow on top of the boiler . For vertical vent ...

  • Crown Boiler BWC120 - page 4

    13 T ABLE 7.1: SUMMAR Y OF HORIZONT AL VENTING OPTIONS VENT OPTION # 1 2 3 CLASSIFICA TION USED IN THIS MANUAL HORIZONT AL CONCENTRIC HORIZONT AL TWIN PIPE HORIZONT AL CONCENTRIC ILLUSTRA TED IN FIGURE 7.2 7.3 7.2 VENT PIPE PENETRA TION THROUGH STRUCTURE W ALL W ALL W ALL AIR INT AKE PIPE PENETRA TION THROUGH STRUCTURE W ALL W ALL W ALL VENT PIPE S ...

  • Crown Boiler BWC120 - page 5

    14 FIGURE 7.2: HORIZONT AL CONCENTRIC VENTING (VENT OPTION 1,3) FIGURE 7.3: HORIZONT AL TWIN PIPE VENTING (VENT OPTION 2) ...

  • Crown Boiler BWC120 - page 6

    15 T ABLE 7.4a: CROWN CONCENTRIC 60/100 VENT COMPONENTS (VENT OPTION 1) CROWN PN DESCRIPTION SIZE USED ON VENT OPTION # COMMENTS 230521 80/125 x 60/100mm REDUCING ELBOW 80/125 x 60/100mm 1 INCLUDED WITH ST ANDARD BOILER 230520 TERMINAL SECTION 60/100mm 1 INCLUDED WITH ST ANDARD BOILER 230522 W ALL GROMMET 60/100mm 1 INCLUDED WITH ST ANDARD BOILER 2 ...

  • Crown Boiler BWC120 - page 7

    6) Permitted T erminals for V ertical V enting - • V ent Option 5 - A straight termination is installed in the end of the vent pipe. V ent manufacturer part numbers for these screens are shown in T able 7.5. The air inlet terminal consists of a 180 degree elbow (or two 90 degree elbows) with a rodent screen as shown in Figure 7.10. • V ent Opti ...

  • Crown Boiler BWC120 - page 8

    FIGURE 7.6a: LOCA TION OF VENT TERMINAL RELA TIVE TO WINDOWS, DOORS, GRADE FIGURE 7.6b: LOCA TION OF VENT TERMINAL RELA TIVE TO METERS AND FORCED AIR INLETS FIGURE 7.6c: POSITIONING VENT TERMINAL UNDER OVERHANGS 17 ...

  • Crown Boiler BWC120 - page 9

    18 9) Pitch of Horizontal Piping - Pitch all horizontal piping so that any condensate which forms in the piping will run towards the boiler: • Pitch Crown horizontal concentric venting 5/8” per foot • Pitch Stainless steel venting 1/4” per foot. 10) Supporting Pipe - V ertical and horizontal sections of pipe must be properly supported: • ...

  • Crown Boiler BWC120 - page 10

    19 T ABLE 7.9: SUMMAR Y OF VER TICAL VENTING OPTIONS VENT OPTION # 5 6 CLASSIFICA TION USED IN THIS MANUAL VER TICAL TWIN PIPE VER TICAL CONCENTRIC ILLUSTRA TED IN FIGURE 7.10 7.1 1 VENT PIPE PENETRA TION THROUGH STRUCTURE ROOF ROOF AIR INT AKE PIPE STRUCTURE THROUGH STRUCTURE ROOF ROOF VENT PIPE SIZE 3” 80/125 mm CONCENTRIC AIR INT AKE PIPE SIZE ...

  • Crown Boiler BWC120 - page 11

    20 FIGURE 7.10: VER TICAL TWIN PIPE VENT SYSTEM (VENT OPTION 5) FIGURE 7.1 1: VER TICAL CONCENTRIC VENT SYSTEM (VENT OPTION 6) ...

  • Crown Boiler BWC120 - page 12

    B. Removing an Existing Boiler From a Common Chimney Read this only if the BWC boiler is replacing an existing boiler that is being removed from a common chimney . This section does not apply to the installation of a BWC boiler . In some cases, when an existing boiler is removed from a common chimney , the common venting system may be too large for ...

  • Crown Boiler BWC120 - page 13

    22 C. Assembly of Crown 60/100mm Concentric V enting (IMPOR T ANT - Skip to Section D for 80/125mm Concentric V ent Assembly) W ARNING Failure to follow the instructions could r esult in flue gas leakage into the combustion air or indoor air , resulting in unsafe or unr eliable operation. • Do not lubricate concentric gaskets with anything other ...

  • Crown Boiler BWC120 - page 14

    FIGURE 7.21: DIMENSION “L” 23 FIGURE 7.20: INST ALLA TION OF REDUCING ELBOW ON CONCENTRIC BOILER COLLAR ...

  • Crown Boiler BWC120 - page 15

    24 6) Use locking bands provided to join adjacent sections of non-cuttable pipe as well as fittings. The male end of the terminal section and other cuttable sections must be held to the female end of the adjoining pipe with at least three #10 x 1/2” sheet metal screws. Drill a 1/8 hole through both outer pipes to start this screw . Use a drill s ...

  • Crown Boiler BWC120 - page 16

    FIGURE 7.25: A TT ACHING 60/100mm TERMINAL SECTION 25 FIGURE 7.24: PREP ARING 60/100mm TERMINAL SECTION FOR INST ALLA TION IN THE W ALL ...

  • Crown Boiler BWC120 - page 17

    D. Assembly of Crown 80/125mm Concentric V enting (IMPOR T ANT - See Section C for 60/100mm Concentric V ent Assembly) W ARNING Failure to follow the instructions could r esult in flue gas leakage into the combustion air or indoor air , resulting in unsafe or unr eliable operation. • Do not lubricate concentric gaskets with anything other than w ...

  • Crown Boiler BWC120 - page 18

    T o cut the straight sections listed above refer to Figure 7.31 and the following instructions: a) Determine the required length of the outer pipe. When doing this allow an additional 1” of length for insertion into the female end of the adjoining pipe. Mark the cut line on the outer pipe. b) Remove the plastic inner pipe by pulling it out from t ...

  • Crown Boiler BWC120 - page 19

    3) Joining Pipe - a) Start assembly of the vent system at the boiler . Lubricate the brown gasket in the boiler vent collar with a few drops of water . b) Push the male end of the first fitting into the boiler collar until it bottoms out. The male end of cuttable sections should go 1” into the collar until the insertion mark (made in Step 2d ab ...

  • Crown Boiler BWC120 - page 20

    4) 80/125mm Horizontal T erminal Installation - a) Cut a 5-1/2” diameter hole through the exterior wall at the planned location of the horizontal terminal. b) Measure distance “L” from the outside surface of the exterior wall to the end of the last fitting as shown in Figure 7.33a. c) Add 1-1/4” to distance “L”. Carefully mark this len ...

  • Crown Boiler BWC120 - page 21

    FIGURE 7.33c: CUTTING INNER PIPE OF 80/125mm HORIZONT AL TERMINAL FIGURE 7.33d: COMPLETING 80/125mm HORIZONT AL TERMINAL INST ALLA TION 30 ...

  • Crown Boiler BWC120 - page 22

    5) Snorkel T erminal Installation - The Snorkel Kit (PN 230540) consists of the following (Also see Figure 7.34): Key # Part # Description 1 230541 Support Elbow 2 230542 Lower W all Bracket 3 230543 Air Intake Section 4 230544 W all Bracket 5 230545 T erminal Elbow 6 230546 Exhaust T erminal 7 230527 Standard Elbow 8 230547 W all Penetration Secti ...

  • Crown Boiler BWC120 - page 23

    d) Complete the vent system inside the structure. The support elbow sits on the M10 x 35 screw as shown in Figure 7.34. Cut the W all Penetration Section to the length required to connect the interior vent system to the Support Elbow following the instructions on Page 26. e) Remove the Support Elbow from the Lower Support Bracket and attach it to t ...

  • Crown Boiler BWC120 - page 24

    FIGURE 7.35b: CUTTING VER TICAL TERMINAL FIGURE 7.35c: COMPLETING VER TICAL TERMINAL INST ALLA TION 33 ...

  • Crown Boiler BWC120 - page 25

    FIGURE 7.36: CHIMNEY CHASE INST ALLA TION 7) Chimney Chase Installation - A vertical 80/125mm vent system can be installed in an unused masonry chimney . This installation is similar to other vertical installations with the following exceptions (Also see Figure 7.36): a) The chimney chase elbow kit (PN230530) is used at the base of the chimney . Th ...

  • Crown Boiler BWC120 - page 26

    CAUTION V ent systems made by Heat Fab, Protech, Z-Flex, and Metal-Fab rely on gaskets for proper sealing. When these vent systems are used, take the following precautions: • Make sure that gasket is in position and undamaged in the female end of the pipe. • Make sure that both the male and female pipes are free of damage prior to assembly . ? ...

  • Crown Boiler BWC120 - page 27

    36 3) Assembly of Metal-Fab Corr/Guard V ent System: a) Corr/Guard General Notes: • Do not cut Corr/Guard vent components. • Refer to Corr/Guard installation instructions for proper methods of support. • Orient Corr/Guard components so that the males ends of all fittings point in the direction of the boiler . b) Start assembly of the vent sy ...

Manufacturer Crown Boiler Category Boiler

Documents that we receive from a manufacturer of a Crown Boiler BWC120 can be divided into several groups. They are, among others:
- Crown Boiler technical drawings
- BWC120 manuals
- Crown Boiler product data sheets
- information booklets
- or energy labels Crown Boiler BWC120
All of them are important, but the most important information from the point of view of use of the device are in the user manual Crown Boiler BWC120.

A group of documents referred to as user manuals is also divided into more specific types, such as: Installation manuals Crown Boiler BWC120, service manual, brief instructions and user manuals Crown Boiler BWC120. Depending on your needs, you should look for the document you need. In our website you can view the most popular manual of the product Crown Boiler BWC120.

A complete manual for the device Crown Boiler BWC120, how should it look like?
A manual, also referred to as a user manual, or simply "instructions" is a technical document designed to assist in the use Crown Boiler BWC120 by users. Manuals are usually written by a technical writer, but in a language understandable to all users of Crown Boiler BWC120.

A complete Crown Boiler manual, should contain several basic components. Some of them are less important, such as: cover / title page or copyright page. However, the remaining part should provide us with information that is important from the point of view of the user.

1. Preface and tips on how to use the manual Crown Boiler BWC120 - At the beginning of each manual we should find clues about how to use the guidelines. It should include information about the location of the Contents of the Crown Boiler BWC120, FAQ or common problems, i.e. places that are most often searched by users in each manual
2. Contents - index of all tips concerning the Crown Boiler BWC120, that we can find in the current document
3. Tips how to use the basic functions of the device Crown Boiler BWC120 - which should help us in our first steps of using Crown Boiler BWC120
4. Troubleshooting - systematic sequence of activities that will help us diagnose and subsequently solve the most important problems with Crown Boiler BWC120
5. FAQ - Frequently Asked Questions
6. Contact detailsInformation about where to look for contact to the manufacturer/service of Crown Boiler BWC120 in a specific country, if it was not possible to solve the problem on our own.

Do you have a question concerning Crown Boiler BWC120?

Use the form below

If you did not solve your problem by using a manual Crown Boiler BWC120, ask a question using the form below. If a user had a similar problem with Crown Boiler BWC120 it is likely that he will want to share the way to solve it.

Copy the text from the picture

Comments (0)