Manual Redring L318

13 pages 0.18 mb
Download

Go to site of 13

Summary
  • Redring L318 - page 1

    P age 1 of 13 Redring Hotbox Boiler Models L318 and L P 330 User and Installer Instructions Please keep these instructions safe, should y ou move house, please hand them over to the next occupier. COM P LIANT TO : BS EN 60335-2, BS EN 55014-2 and BS EN 50081 -1 ...

  • Redring L318 - page 2

    P age 2 of 13 Redring Hotbox Boiler THE HALOGEN BOILER, L318, LP330 HALOGEN P OWERED WALLMOUNTED BOILER USER&INSTALLERS INSTRUCTIONS P LEASE KEE P THESE INSTRUCTIONS SA F E. SHOULD YOU MOVE HOUSE, P LEASE HAND THEM OVER TO THE NEXT OCCU P IER. 1. Introduction The Halo g en Boiler is a wall - m ounted appliance, suitable for installation onto s ...

  • Redring L318 - page 3

    P age 3 of 13 Overall Di m ensions & Mini m u m Clearances Clearances Operational Maintenance Side mm 5 5 Top mm 200 200 Bottom mm 200 200 Front mm 5 500 3. Installation Requirements Statutory Requirements The installation should also be in accordance with the rele v ant reco mm endations in the current editions of the followin g British Standa ...

  • Redring L318 - page 4

    P age 4 of 13 I f the boiler is to be placed in a c upboard this cupboard should not be used as a stora g e cupboard. Ventilation should be pro v ided as detailed below. Ventilation This boiler does not require a purpose pro v ided air v entilation in the roo m , howe v er it does require roo m air to circulate throu g h the boiler to ensure the co ...

  • Redring L318 - page 5

    P age 5 of 13 Exa m ple: 30L s y ste m total capacit y requires an expansion v essel capacit y of 30 x 0.0833 = 2.5 litres with a 0.5 bar v essel char g e and s y ste m cold fill pressure. Filling Point The heatin g s y ste m m ust be pro v ided with a suitable fillin g m echanis m to both co m plete the initia l fill and top up the s y ste m if ne ...

  • Redring L318 - page 6

    P age 6 of 13 Location Before installin g the boiler chec k that the chosen location is suitable, ensurin g a dequate clearance is a v ailable for both installation and ser v icin g. The appliance m ust be m ounted on a flat v ertical wall. Prepare the Appliance Re m o v e the front panel b y unscrewin g the two screws at the botto m of the case. R ...

  • Redring L318 - page 7

    P age 7 of 13 Allow the heatin g s y ste m to reach operatin g te m perature and then exa m ine for water lea k s. Turn off the boiler and drain whilst still hot. Refill and v ent the heatin g s y ste m ensurin g all air is cleared fro m the s y ste m and the cold fill pressure is set at the desi g n pressure. The pressure g au g e should be at 0.5 ...

  • Redring L318 - page 8

    P age 8 of 13 Replacing a bulb • Re m o v e the lid fro m the bulb box, re m o v e t he fault y bulb and replace with a new bulb. Do not touch the bulb with bare fin g ers, as this will reduce the life of the bulb. Use clean tissue paper or si m ilar to hold the bulb. • Chec k that the bulb is seated correctl y on the contacts. • Replace the ...

  • Redring L318 - page 9

    P age 9 of 13 Replacing the e x pansion vessel • I solate the boiler usin g the appliance isolation v al v es on the flow and return connections to the boiler. • Re m o v e the expansion v essel fro m the pipe wor k. • Refit a replace m ent expansion v essel in re v erse order usin g a reco g nised m ethod of sealin g the threaded j oint. • ...

  • Redring L318 - page 10

    P age 10 of 13 Fault Finding Chart I f the radiators do not g et hot or do not reach the boiler flow operatin g te m perature follow the g uide below to establish the possible cause. ...

  • Redring L318 - page 11

    P age 11 of 13 9. Wiring Diagram ...

  • Redring L318 - page 12

    P age 12 of 13 10. Spare Parts Infor m ation Item Part Number Description Quantity 1 97392070 . 300 W linear halo g en bulb Model dependant 2 97392071 . Hot box replace m ent head 1 3 97392072 . Pressure relief v al ve 1 4 97392073 . Pressure g au ge 1 5 97392074 . Control ther m ostat 1 6 97392075 . Li m it Ther m ostat Model dependant 7 97392076 ...

  • Redring L318 - page 13

    P age 13 of 13 GUARANTEE Ter m s and Conditions for U K & R OI (outside U K & R OI contact your local distributor) We, A pplied E ne r g y Products Li m ited, guarantee this product for do m estic use onl y , f or t he period o f 12 m o nths f ro m the date o f purchase. Within the guarantee period w e w il l resolve, free of charge, an y m ...

Manufacturer Redring Category Boiler

Documents that we receive from a manufacturer of a Redring L318 can be divided into several groups. They are, among others:
- Redring technical drawings
- L318 manuals
- Redring product data sheets
- information booklets
- or energy labels Redring L318
All of them are important, but the most important information from the point of view of use of the device are in the user manual Redring L318.

A group of documents referred to as user manuals is also divided into more specific types, such as: Installation manuals Redring L318, service manual, brief instructions and user manuals Redring L318. Depending on your needs, you should look for the document you need. In our website you can view the most popular manual of the product Redring L318.

Similar manuals

A complete manual for the device Redring L318, how should it look like?
A manual, also referred to as a user manual, or simply "instructions" is a technical document designed to assist in the use Redring L318 by users. Manuals are usually written by a technical writer, but in a language understandable to all users of Redring L318.

A complete Redring manual, should contain several basic components. Some of them are less important, such as: cover / title page or copyright page. However, the remaining part should provide us with information that is important from the point of view of the user.

1. Preface and tips on how to use the manual Redring L318 - At the beginning of each manual we should find clues about how to use the guidelines. It should include information about the location of the Contents of the Redring L318, FAQ or common problems, i.e. places that are most often searched by users in each manual
2. Contents - index of all tips concerning the Redring L318, that we can find in the current document
3. Tips how to use the basic functions of the device Redring L318 - which should help us in our first steps of using Redring L318
4. Troubleshooting - systematic sequence of activities that will help us diagnose and subsequently solve the most important problems with Redring L318
5. FAQ - Frequently Asked Questions
6. Contact detailsInformation about where to look for contact to the manufacturer/service of Redring L318 in a specific country, if it was not possible to solve the problem on our own.

Do you have a question concerning Redring L318?

Use the form below

If you did not solve your problem by using a manual Redring L318, ask a question using the form below. If a user had a similar problem with Redring L318 it is likely that he will want to share the way to solve it.

Copy the text from the picture

Comments (0)