-
GE Advantium PSB1200BB - page 1
Installation Instructions Advantium ® 120V Built-In SpeedCook Ovens PSB1200 PSB1201 ZSC1201 ZSC1202 For a Spanish version of this manual, visit our Website at ge.com. Para consultar una version en español de este manual de instrucciones, visite nuestro sitiode internet ge.com. 49-40593-1 MFL59060901 12-08 JR ...
-
GE Advantium PSB1200BB - page 2
Safety Information 2 CONTENTS Design Information Models Available ......................................................................2 Product Dimensions and Clearances ............................3 T ools and Parts Required ....................................................3 Parts Supplied ..................................................... ...
-
GE Advantium PSB1200BB - page 3
Design Information 3 PRODUCT DIMENSIONS AND CLE ARANCES NOTE: Appearance will vary by model. 19 1/32” 29 3/4” T OOLS AND P AR TS REQUIRED (NO T SUPPLIED ) • #2 Phillips screwdriv er • Hand-held drill • High speed drill bit , 3/32 ″ diameter • 3/8 ″ slot-head scr ewdriver • Level • Saw • 2 x 4 or 2 x 2 lumber for installing run ...
-
GE Advantium PSB1200BB - page 4
Installation Pr eparation 4 ELECTRICAL REQUIREMENTS Single Advantium 120 Installation: This product r equires a 120-volt , 60 Hz, 15-amp circuit and draws 1.8 kilowatts. This pr oduct must be connected to a supply circuit of the pr oper voltage and frequency. • Wire size must conform to the requir ements of the National Electrical Code or the pre ...
-
GE Advantium PSB1200BB - page 5
5 Installation Pr eparation Pr eparation WITHOUT an Accessory St orage Drawer PREP ARE THE OPENING (cont .) Installation over a GE/Monogram Warming Drawer : NO TE: Additional clearances between the cutouts may be requir ed. Check to be sure the oven supports above the Warming Drawer location do not obstruct the requir ed interior depth and height . ...
-
GE Advantium PSB1200BB - page 6
Installation Pr eparation 6 Pr eparation WITHOUT an Accessory St orage Drawer PREP ARE THE OPENING (cont .) Installation over a GE/Monogram Oven and Warming Drawer : NO TE: Additional clearances between the cutouts may be requir ed. Check to be sure the oven supports above the Warming Drawer location do not obstruct the requir ed interior depth and ...
-
GE Advantium PSB1200BB - page 7
7 Installation Pr eparation Pr eparation WITHOUT an Accessory St orage Drawer PREP ARE THE OPENING (cont .) Installation under a GE/Monogram Microwave Oven and over a W arming Drawer : NO TE: Additional clearances between the cutouts may be requir ed. Check to be sure the oven supports above the Warming Drawer location do not obstruct the requir ed ...
-
GE Advantium PSB1200BB - page 8
PREP ARE THE OPENING (cont .) Installation beside another GE/Monogram Built-in Speedcook Oven: • If you are mounting one Under -the-Counter GE/Monogram oven beside the other , use the dimensions shown. The middle rail separating the two openings may need to be larger than the 4-1/2 ″ minimum shown. 25-1/4 ″ 17-1/2 ″ Installation Pr eparatio ...
-
GE Advantium PSB1200BB - page 9
9 Installation Pr eparation Pr eparation WITH an Accessory St orage Drawer NO TE: MODEL ZSC1201 CAN ONL Y BE INST ALLED WITH AN A CCESSORY ST ORAGE DRA WER IF INST ALLED ABOVE 36-3/4 ″ . MODEL ZSC1202 CANNO T BE INST ALLED WITH AN ACCESSORY ST ORAGE DRA WER. SEE INST ALL A TION PREPARA TION WITHOUT AN AC CESSORY STORA GE DRAWER FOR THIS MODEL. In ...
-
GE Advantium PSB1200BB - page 10
10 Installation Pr eparation Pr eparation WITH an Accessory St orage Drawer NO TE: MODEL ZSC1201 CAN ONL Y BE INST ALLED WITH AN A CCESSORY ST ORAGE DRA WER IF INST ALLED ABOVE 36-3/4 ″ . MODEL ZSC1202 CANNO T BE INST ALLED WITH AN ACCESSORY ST ORAGE DRA WER. SEE INST ALL A TION PREPARA TION WITHOUT AN AC CESSORY STORA GE DRAWER FOR THIS MODEL. P ...
-
GE Advantium PSB1200BB - page 11
11 Installation Pr eparation Pr eparation WITH an Accessory St orage Drawer NO TE: MODEL ZSC1201 CAN ONL Y BE INST ALLED WITH AN A CCESSORY ST ORAGE DRA WER IF INST ALLED ABOVE 36-3/4 ″ . MODEL ZSC1202 CANNO T BE INST ALLED WITH AN ACCESSORY ST ORAGE DRA WER. SEE INST ALL A TION PREPARA TION WITHOUT AN AC CESSORY STORA GE DRAWER FOR THIS MODEL. P ...
-
GE Advantium PSB1200BB - page 12
12 Installation Pr eparation Cooktop Cooktop 25 ″ 1-1/2 ″ Min. 4 ″ High T oekick 23-1/2 ″ 25-1/4 ″ 21 ″ 36 ″ Countertop Height PREP ARE THE OPENING (cont .) Installation beside another GE/Monogram Built-in Speedcook Oven: • If you are mounting one Under -the-Counter GE/Monogram oven beside the other , use the dimensions shown. The m ...
-
GE Advantium PSB1200BB - page 13
REMOVE THE P ACKA GING AND P ARTS 1 13 Installation Instructions • Remove all packing material and tape. • Locate parts package containing mounting screws. • Remove the oven fr om the carton. Do not lift unit by handle or conduit . Two people are r equired to lift this oven. • Open the door and remove any packaging in ov en. Owner ’s Manu ...
-
GE Advantium PSB1200BB - page 14
Installation Instructions 14 SLIDE THE OVEN INT O THE CUTOUT CA UTION: Two people are r equired to lift the oven into the opening. Grasp the bottom at front and r ear . DO NOT USE THE HANDLE T O LIF T THE OVEN. DAMA GE WILL OCCUR . • Lift and hold the oven at the fr ont of the opening. Hold the oven at an angle and plug in the power cord. • Car ...
-
GE Advantium PSB1200BB - page 15
15 Installation Instructions INST ALL MOUNTING SCREWS • Slide the oven the remaining w ay into the opening so that the side flanges and control panel ar e against the cabinet frame. Make sure that the ov en is centered in the opening. • Open the door , place a turntable tray in the oven and make sure that the tray in the unit is lev el. • Dri ...
-
GE Advantium PSB1200BB - page 16
16 GE Consumer & Industrial Appliances Assembly Instructions Advantium ® Built -In Accessory St orage Drawer JX2200, JX2201, ZX2201 NO TE: Appearance will vary by model. BEFORE YOU BEGIN Read these instructions completely and caref ully. Read the Installation Instructions for the Advantium 120V or 240V oven completely and caref ully for cutout ...
-
GE Advantium PSB1200BB - page 17
UNDER-THE-COUNTER (UT C) MOUNTING BRACKET INST ALL A TION NO TE: For UTC models PSB1200, PSB1201 and ZSC1201 only. Open the accessory drawer so you have access to the top bracket . Remove the three scr ews securing the top bracket . Install the new UTC mounting brack et using the screws r emoved previously. Close the drawer and proceed with the ins ...
-
GE Advantium PSB1200BB - page 18
18 ASSEMBLING THE OVEN T O DRA WER (cont .) Remove the fr ont two bottom screws on each side of the oven and the top center screw on each side of the storage drawer . Place the side supports into the tabs on the drawer and secure using the scr ews supplied and the screws r emoved in Step C. The oven and storage drawer assembly is now ready to be in ...
-
GE Advantium PSB1200BB - page 19
19 Notes ...
-
GE Advantium PSB1200BB - page 20
Printed in Korea NOTE: While performing installations described in this book , safety glasses or goggles should be worn. NOTE: Product improv ement is a continuing endeavor at General Electric. Therefore, materials, appearance and specifications are subject to change without notice. GE Consumer & Industrial Appliances General Electric Company L ...
Do you have a question concerning GE Advantium PSB1200BB?
Use the form below
If you did not solve your problem by using a manual GE Advantium PSB1200BB, ask a question using the form below. If a user had a similar problem with GE Advantium PSB1200BB it is likely that he will want to share the way to solve it.