Инструкция обслуживания AGA Fired Earth

12 страниц 2.35 mb
Скачать

Перейти на страницу of 12

Summary
  • AGA Fired Earth - page 1

    Floor Tiling Installation Guide Ancillar y Products A full range of high quality fixing and sealing products, researched and developed to meet Fired Earth standards, are available for both professional and DIY use. Read the instructions on the packaging of Adhesives, Grouts and Sealants very carefully . W ebsite - www .f iredearth.com All our insta ...

  • AGA Fired Earth - page 2

    Floor Tiling Installation Guide Contents Substrates 4 Planning 6 Fixing 7 Cutting 8 Sealing 9 Grouting 1 0 Terracotta Tiles 1 1 Presealed Terracotta, Geometric, Roman Mosaic and Encaustic Tiles 13 Slate and Lubelska Bricks 14 Natural Stone Tiles and Mosaics 15 P orcelain and Glass Tiles 16 External Floor Tiling 16 Glossary 16 Product Selector 1 18 ...

  • AGA Fired Earth - page 3

    5 Substrates If your tiling is to last, it is essential that the surface onto which the tiles are to be laid is sound. Careful consideration must be given to the floor surface to confirm that the surface is level, clean, dry , free of dust, grease and any loose material. Y our tiler must confirm the suitability of the subfloor before tiling. Sand a ...

  • AGA Fired Earth - page 4

    Step 4. When tiling commences you should start at point ‘X’, so check that the lines you have marked make a perfect right angle and the side line runs parallel to the centre line. Grout joints The width of grout joints will vary between 3–12mm. Large joints will be necessary on rustic tiles such as terracotta and slate. Please refer to the Fi ...

  • AGA Fired Earth - page 5

    9 8 Cutting Due to the thickness and make-up of the majority of Fired Earth floor tiles, it is recommended that either a diamond cutter or an angle grinder is used to cut the tiles. Water cooled diamond cutters are available from tool hire shops. Please wear suitable protective eyewear and protective clothing when cutting tiles. P orcelain tiles re ...

  • AGA Fired Earth - page 6

    Grouting Grouting refers to the process of filling the spaces between the individual tiles and thus completing the floor surface. Before grouting can commence, the adhesive used must have cured, which usually takes between 12–24 hours for Fired Earth Floor Adhesive* and 3 hours for Fired Earth Fastset Adhesive*. The depth of adhesive, ambient tem ...

  • AGA Fired Earth - page 7

    P ammets because salt pits cannot be 'blended in' without the use of wax polish. Maintenance Terracotta floors should be swept or vacuumed regularly to remove all loose dirt. It is important to use the correct Fired Earth products when maintaining your floor , as these have been formulated to both clean the floor and be gentle on the seal ...

  • AGA Fired Earth - page 8

    15 14 Slate and Lubelska Bricks Sealing Before grouting apply one or two coats of Fired Earth Stone Shield* using a clean, fluff-free cloth. Allow approximately 2 hours between applications and do not apply more sealer than can be fully absorbed by the tiles within 20 minutes. Surplus sealer should be removed with white spirit. Lubelska Bricks can ...

  • AGA Fired Earth - page 9

    17 P orcelain and Glass Tiles These tiles do not require any sealing or finishing products. After grouting, the tiles should be polished with a soft, clean cloth to remove any remaining grout film. The grout can be sealed with MN Stain Stop* to prevent staining. Maintenance Clean your floor with an MN Easy Care* when required. Colour change - As th ...

  • AGA Fired Earth - page 10

    Substrate Sand and Cement Screed Concrete/Brickwork Timber Floorboards (sound and secure) Timber Floorboards overlaid with WBP Plywood (min depth 18mm) Timber Floating Floors Quarry , Clay , Glazed Tiles Vinyl Tiles, Flooring Grade Asphalt (internal use only) Underfloor Heating Watch P oints New concrete should be allowed to dry for at least 6 week ...

  • AGA Fired Earth - page 11

    Substrate Sand and Cement Screed Concrete/Brickwork Timber Floorboards (sound and secure) Timber Floorboards overlaid with WBP Plywood (min depth 18mm) Timber Floating Floors Quarry , Clay , Glazed Tiles Vinyl Tiles, Flooring Grade Asphalt (internal use only) Underfloor Heating Watch P oints New concrete should be allowed to dry for at least 6 week ...

  • AGA Fired Earth - page 12

    Product Sealant Finish Cleaner Maintenance Terracotta (inc. Reclaimed terracotta) Fired Earth Linseed Sealer* Wax paste (high protection/high maintenance/ colour enhancer) Cotto Rapid (low maintenance, less protective)* For waxed floors, use Fired Earth Super Floor; for Cotto Rapid floors, use Clean Stone 1* For waxed floors it is advisable to appl ...

Производитель AGA Категория Flooring

Документы, которые мы получаем от производителя устройства AGA Fired Earth мы можем разделить на несколько групп. Это в частности:
- технические чертежи AGA
- инструкции обслуживания Fired Earth
- паспорта изделия AGA
- информационные брошюры
- энергетические этикетки AGA Fired Earth
Все из них важны, однако самую важную информацию с точки зрения пользователя мы найдем в инструкции обслуживания AGA Fired Earth.

Группа документов, определяемая как инструкции обслуживания, делится также на более подробные типы, такие как: Инструкции монтажа AGA Fired Earth, инструкции обслуживания, короткие инструкции или инструкции пользователя AGA Fired Earth. В зависимости от потребностей, Вам необходимо поискать требуемый документ. На нашем сайте Вы можете просмотреть самую популярную инструкцию использования изделия AGA Fired Earth.

Похожие инструкции обслуживания

Полная инструкция обслуживания устройства AGA Fired Earth, как должна выглядеть?
Инструкция обслуживания, определяемая также как пособие пользователя, или просто "руководство" - это технический документ, цель которого заключается в использовании AGA Fired Earth пользователями. Инструкции пишет, как правило технический писатель, языком, доступным для всех пользователей AGA Fired Earth.

Полная инструкция обслуживания AGA, должна заключать несколько основных элементов. Часть из них менее важная, как например: обложка / титульный лист или авторские страницы. Однако остальная часть, должна дать нам важную с точки зрения пользователя информацию.

1. Вступление и рекомендации, как пользоваться инструкцией AGA Fired Earth - В начале каждой инструкции, необходимо найти указания, как пользоваться данным пособием. Здесь должна находится информация, касающаяся местонахождения содержания AGA Fired Earth, FAQ и самых распространенных проблем - то есть мест, которые чаще всего ищут пользователи в каждой инструкции обслуживания
2. Содержание - индекс всех советов, касающихся AGA Fired Earth, которое найдем в данном документе
3. Советы по использованию основных функций устройства AGA Fired Earth - которые должны облегчить нам первые шаги во время использования AGA Fired Earth
4. Troubleshooting - систематизированный ряд действия, который поможет нам диагностировать а в дальнейшем очередность решения важнейших проблем AGA Fired Earth
5. FAQ - чаще всего задаваемые вопросы
6. Контактные данные Информация о том, где искать контактные данные производителя / сервисного центра AGA Fired Earth в данной стране, если самостоятельно не получится решить проблему.

У вас вопрос, касающийся AGA Fired Earth?

Воспользуйтесь формуляром, находящимся ниже

Если с помощью найденной инструкции Вы не решили свою проблему с AGA Fired Earth, задайте вопрос, заполнив следующий формуляр. Если у какого то из пользователей была похожая проблема с AGA Fired Earth со всей вероятностью он захочет поделиться методом ее решения.

Перепишите текст с картинки

Комментарии (0)