Инструкция обслуживания Fluke 960PS-200

16 страниц 0.11 mb
Скачать

Перейти на страницу of 16

Summary
  • Fluke 960PS-200 - page 1

    Victoreen ® 960PS-200 & 960PS-210 Power Supply Modules Operators Manual March 2005 Manual No. 960PS-200-1 Rev. 2 © 2004, 2005 Fluke Corporat i on, All rights reserved . Printed in U .S.A. All product names are trademar ks of their respective companies ...

  • Fluke 960PS-200 - page 2

    Fluke Biomedical Radiation Management Services 6045 Cochran Road Cleveland, Ohio 44139 440.498.2564 120 Andrews Road Hicksville, New York 1180 1 516.870.0100 www.flukebiomedical.com/rms ...

  • Fluke 960PS-200 - page 3

    i Table of Contents Section 1: Introductio n ................................................................................................ 1-1 1.1 General De scription ..................................................................................... 1-1 1.2 Applicat ion ........................................................................ ...

  • Fluke 960PS-200 - page 4

    (Blank Page) ...

  • Fluke 960PS-200 - page 5

    Introduction General Description 1 1-1 Section 1 Introduction 1.1 General Description The 960PS Power Supply is used to su pply power to the modules that are pl ugged into the 960MB/961MB motherboards. The power supply is mou nted outside of the 960CC Ca rd Cage Module, the wall mounted Local Cont rol Unit enclosure, or control room cabinet. The in ...

  • Fluke 960PS-200 - page 6

    Victoreen 960PS-200 & 960PS-210 Operators Manual 1-2 NOTE Figure 1-1. Power Supply Functional Bloc k Diagram 1.4 Receiving Inspection and Storage Receiving Inspection Upon receipt of the unit: 1. Inspect the carton(s) and contents for damage. If damage i s evident, file a claim with the carrier and notify Fluke Biomedical, Radiation Manageme nt ...

  • Fluke 960PS-200 - page 7

    Introduction Receiving Inspection and Storage 1 1-3 2. Requirements for proper storag e must be documented and written pro c edures or instructions must be established. 3. In the event of fire, post-fire evaluation must be in accordance with ANSI N45.2.2 (1972), Section 6.4.3. 4. Removal of items from storage must be i n accordan ce with ANSI N45.2 ...

  • Fluke 960PS-200 - page 8

    Victoreen 960PS-200 & 960PS-210 Operators Manual (Blank page) ...

  • Fluke 960PS-200 - page 9

    Operation 960PS-200 Power Supply 2 2-1 Section 2 Operation 2.1 960PS-200 Power Supply The 960PS-200 supplies thre e different DC voltage outputs to the 960 modules through the 960MB/961MB motherboard. 115 VAC is connecte d to te rminal strip A3, part of the front panel. The AC line voltage is fed to a bridge rectifier circuit and re ctified by diod ...

  • Fluke 960PS-200 - page 10

    Victoreen 960PS-200 & 960PS-210 Operators Manual 2-2 2.5 960PS-210 Power Supply The 960PS-210 Power Supply is similar in operati on to the 960PS-200, with the exception that it incorporates an additional 24 VDC output, an input voltage sensing circuit, and a comm on and differential mode choke. Refer to schematic drawi ng 960PS-210-53. ...

  • Fluke 960PS-200 - page 11

    Maintenance, Calibration, and Troubleshooting Maintenance 3 3-1 Section 3 Maintenance, Calibration and Troubleshooting 3.1 Maintenance No periodic maintenan ce is required for the modul e. The output voltage levels, howe ver, should be verified periodically. If a maintenance question arises and cannot be resolved by using this manual, please contac ...

  • Fluke 960PS-200 - page 12

    Victoreen 960PS-200 & 960PS-210 Operators Manual 3-2 If a problem develops, verify that the volt ages at connection point inputs and out puts are present and that all wiring is secure. Ensure fuse F1 is n ot open for the 960PS-210 Power Supply. Refer to Appendi x B for drawings. The 960PS-200 and 960P S-210 Power Supply Modules mu st be returne ...

  • Fluke 960PS-200 - page 13

    Appendix Connector Designations A A-1 Appendix A Connector Designations A.1 Connector Designations Terminal Designations, 960PS-200 Pin Description 1 GND 2 AC Line Voltage 3 AC Line Voltage 4 -15 @ 2 A 5 +15 @ 2 A 6 RETURN 7 +5 V Return Sense 8 +5 V@ 10 A 9 + 5 V SENSE 10 CHASSIS GND Terminal Designations, 960PS-21 0 Pin Description 1 AC Line Volta ...

  • Fluke 960PS-200 - page 14

    Victoreen 960PS-200 & 960PS-210 Operators Manual (Blank page) ...

  • Fluke 960PS-200 - page 15

    Appendix Applicable Drawings and Bill of Materials B B-1 Appendix B Applicable Drawings and Bill of Materials B.1 Applicable Drawings Drawing Number De scription 960PS-200-50 Power Supply Assembly 960PS-200-53 Schematic Diagram 960PS-210-5 Power Supply Assembly 960PS-210-53 Schematic Diagram B.2 Applicable Bill of Materials The 960PS-200 Power Supp ...

  • Fluke 960PS-200 - page 16

    Fluke Biomedical Radiation Management Services 6045 Cochran Road Cleveland, Ohio 44139 440.498.2564 120 Andrews Road Hicksville, New York 1180 1 516.870.0100 www.flukebiomedical.com/rms ...

Производитель Fluke Категория Power Supply

Документы, которые мы получаем от производителя устройства Fluke 960PS-200 мы можем разделить на несколько групп. Это в частности:
- технические чертежи Fluke
- инструкции обслуживания 960PS-200
- паспорта изделия Fluke
- информационные брошюры
- энергетические этикетки Fluke 960PS-200
Все из них важны, однако самую важную информацию с точки зрения пользователя мы найдем в инструкции обслуживания Fluke 960PS-200.

Группа документов, определяемая как инструкции обслуживания, делится также на более подробные типы, такие как: Инструкции монтажа Fluke 960PS-200, инструкции обслуживания, короткие инструкции или инструкции пользователя Fluke 960PS-200. В зависимости от потребностей, Вам необходимо поискать требуемый документ. На нашем сайте Вы можете просмотреть самую популярную инструкцию использования изделия Fluke 960PS-200.

Похожие инструкции обслуживания

Полная инструкция обслуживания устройства Fluke 960PS-200, как должна выглядеть?
Инструкция обслуживания, определяемая также как пособие пользователя, или просто "руководство" - это технический документ, цель которого заключается в использовании Fluke 960PS-200 пользователями. Инструкции пишет, как правило технический писатель, языком, доступным для всех пользователей Fluke 960PS-200.

Полная инструкция обслуживания Fluke, должна заключать несколько основных элементов. Часть из них менее важная, как например: обложка / титульный лист или авторские страницы. Однако остальная часть, должна дать нам важную с точки зрения пользователя информацию.

1. Вступление и рекомендации, как пользоваться инструкцией Fluke 960PS-200 - В начале каждой инструкции, необходимо найти указания, как пользоваться данным пособием. Здесь должна находится информация, касающаяся местонахождения содержания Fluke 960PS-200, FAQ и самых распространенных проблем - то есть мест, которые чаще всего ищут пользователи в каждой инструкции обслуживания
2. Содержание - индекс всех советов, касающихся Fluke 960PS-200, которое найдем в данном документе
3. Советы по использованию основных функций устройства Fluke 960PS-200 - которые должны облегчить нам первые шаги во время использования Fluke 960PS-200
4. Troubleshooting - систематизированный ряд действия, который поможет нам диагностировать а в дальнейшем очередность решения важнейших проблем Fluke 960PS-200
5. FAQ - чаще всего задаваемые вопросы
6. Контактные данные Информация о том, где искать контактные данные производителя / сервисного центра Fluke 960PS-200 в данной стране, если самостоятельно не получится решить проблему.

У вас вопрос, касающийся Fluke 960PS-200?

Воспользуйтесь формуляром, находящимся ниже

Если с помощью найденной инструкции Вы не решили свою проблему с Fluke 960PS-200, задайте вопрос, заполнив следующий формуляр. Если у какого то из пользователей была похожая проблема с Fluke 960PS-200 со всей вероятностью он захочет поделиться методом ее решения.

Перепишите текст с картинки

Комментарии (0)