Инструкция обслуживания New Buck Corporation FP-BR-10-ZC

38 страниц 1.35 mb
Скачать

Перейти на страницу of 38

Summary
  • New Buck Corporation FP-BR-10-ZC - page 1

    MODEL FP-BR-10-ZC VENT -FREE WA R N I N G : If the information in this manual is not followed exactly , a fire or explosion may result causing property dama ge, personal injury or loss of life. − Do not store or use gasoline or other flammable vapors and liqui ds in the vicinity of this or any other appliance. WHAT TO DO IF YOU SMELL GAS • Do n ...

  • New Buck Corporation FP-BR-10-ZC - page 2

    ...

  • New Buck Corporation FP-BR-10-ZC - page 3

    T ABLE OF CONTENTS Safety Information and Warnings ................................................................................. 3 Installation .................................................................................................................. ... 6 Fireplace and Framing Dim ensions ............................................... ...

  • New Buck Corporation FP-BR-10-ZC - page 4

    Page 2 ...

  • New Buck Corporation FP-BR-10-ZC - page 5

    SAFETY INFORMA TION WA R N I N G S IMPORTANT: READ THIS OW NER’S MANUAL CAREFUL LY AND COMPLETELY BEFORE TRYING TO ASSEMBLE, OPERATE, OR SERVICE THIS AP PLIANCE. IMPROPER USE OF THESE LOGS CAN CAUSE SERIOUS INJURY OR DEAT H FROM BURNS, FIRE, EXPLOSION, AND CARBON MON OXIDE POISONING. Early signs of carbon monoxide poisoning resemble the flu, with ...

  • New Buck Corporation FP-BR-10-ZC - page 6

    5. If this heater is used with propane gas, do not place propane supply tank (s) inside any structure. 6. What To Do IF You Smell Gas: Shut off gas suppl y. - Do not try to light any appliance. - Do not touch any electrical switch; do n ot use any phone in your building. - Immediately call your gas supplier from a neighbor’s phone. Follow the gas ...

  • New Buck Corporation FP-BR-10-ZC - page 7

    21. All heater screens must be ke pt clean when operating the gas logs. 22. . ”WARNING: Failure to keep the primary air opening( s) of the burner(s) clean may result in sooting and property damage.” 24. Do not use this heater for burning trash or cooki ng. Never place matches, paper, garbage, or any other material on top of log s or into the fl ...

  • New Buck Corporation FP-BR-10-ZC - page 8

    INST ALLA TION The Model FP-BR10-ZC V ent-Fre e gas fi re place may be installed in any r oom in a Residential home or an After -Market* Manufactured Home. (E xception: This appliance may not be installed in a bathroom.) * (After Market: Completion of sale, not for the purpose of resale from the manufacturer). For After-Market Manufactured Home ins ...

  • New Buck Corporation FP-BR-10-ZC - page 9

    Fireplace and Framing Dimensions (ins.) FIGURE 2 24” 25 1/8” 26 1/8” 20 3/8” 11 5/8” 26 1/8” 25 1/8” 1 3/4” 13 1/2” 8” GAS LINE WARNING:Installation and repairs should be performed by a qualified service person. The appliance should be inspected before use and at least annually by a professional service person. More frequent cle ...

  • New Buck Corporation FP-BR-10-ZC - page 10

    This list of specific instructions will help you make certai n that every installation operation is pe rformed correctly. Complete the installation steps in the sequence shown. STA TE AND LOCAL BUILDING CODES SHOULD BE CONSULTED IN ALL CASES AS T O THE PARTI CULAR RE QUIREME NTS CONCERNING THE INSTALLATION OF A FA CTORY BUILT FIRE PLACES. S elect t ...

  • New Buck Corporation FP-BR-10-ZC - page 11

    There is a wide variety of finishing material available for your fireplace from form al wall treatments with marble and m antels, to r ustic wood pa neling, stone or brick. Non-Combustible materials used in this installation such as slate, til e, marble, etc. must be at least 1/2" thick. IT IS IMPORTANT THAT THE BLACK FACE OF THE FIREPLACE NOT ...

  • New Buck Corporation FP-BR-10-ZC - page 12

    MANTEL PROFILES FOR ZE RO CLEARANCE CABINET MUST BE FOLLOWED 2" 42" COMBUSTIBLE MATERIAL STAND OFF FP-BR10-ZC LOUVERS HOOD CEILING MANTELS WITH 3/4" BASE 2" COMBUSTIBLE MATERIAL STAND OFF FP-BR10-ZC LOUVERS HOOD 12" 3" SUPPORT 10" 2" COMBUSTIBLE MATERIAL STAND OFF FP-BR10-ZC LOUVERS HOOD Bottom of 3/4" B ...

  • New Buck Corporation FP-BR-10-ZC - page 13

    INST ALLA TION OF MODEL FP - BR10- ZC WITH OPTIONAL WOODEN MANTEL (1) When choosing the right location for your heat er and mantel keep the following in mind: NOTE: Due to high temperatures, this heater should be located out of traffic and aw ay from furniture and draperies. NOTE: Kit No. (PA KDMH10) Deluxe Wooden Mantel for FP-BR10-ZC. Kit No. (PA ...

  • New Buck Corporation FP-BR-10-ZC - page 14

    FIGURE 6 MANTEL BASE TOP MANTEL REAR OF HEATER 1/2" WOOD SCREWS (9) Page 12 ...

  • New Buck Corporation FP-BR-10-ZC - page 15

    CHECK GAS TYPE : Use only the type of gas indicated on the valve rating plate. If the type of gas vlisted on the plate is not your type of gas supply, DO NOT INSTALL . Contact your de aler for proper model. Always use an external regulator for all LP heat ers to reduce the supply tank pressure to a maximum of 13” W.C. This in addition to the regu ...

  • New Buck Corporation FP-BR-10-ZC - page 16

    PRODUCING ADEQUA TE VENTILA TION This section is for residential o r manufactured (mobile) installation “This heater shall not be installed in a conf ined space or unusually tight co nstruction unless provisions are provided for adequate combustion and ventilation air.” The National Fuel Gas Code, ANSI Z223.1/NFPA 54 defines a confined space as ...

  • New Buck Corporation FP-BR-10-ZC - page 17

    DETERMINING FRESH-AIR FLOW FOR HEA TER LOCA TION DETERMINE IF YOU HAVE A CONF INED OR UNCONFINED SPACE Use this worksheet to determine if you have confined or unconfined space. SPACE: Includes the room in which you will in st all heater plus adjoining rooms with doorless passageways or ventilati on grills between the rooms. 1. Determine the volume ...

  • New Buck Corporation FP-BR-10-ZC - page 18

    VENTILA TION AIR VENTILA TION AIR FROM INSIDE BUILDING This fresh air would come from an adjoining unconfined sp ace. When venting to an adjoining space, you must provide two permanent openings: one wit hin 12" of the ceiling and one within 12" of the floor on the wall connecting the two spaces. (See Options 1 and 2, Figure 7.) You can al ...

  • New Buck Corporation FP-BR-10-ZC - page 19

    VENTILA TION AIR FROM OUTDOORS Provide extra fresh air by using ventilation gri lls or ducts. You must provide two perm anent openings: one within 12" of the ceiling and one w ithin 12" of the floor. Connect these items directly to the outdoors. These spaces includ e attics and crawl spaces. Follow the National Fuel Gas Code NFPA 54/ANSI ...

  • New Buck Corporation FP-BR-10-ZC - page 20

    GAS PRESSURE CHECK Check the inlet pressure to the burner to insur e that it is as shown in the ta ble below. NOTE: The pressure check point is located on the right side of the valve facing burner. The appliance and its appliance main gas valve must be disconnected from the gas supply piping system during any pressure testing of th at system at tes ...

  • New Buck Corporation FP-BR-10-ZC - page 21

    LOG PLACEMENT Logs are shipped secured in unit. NOTE: When operated for the first time, logs may emit a “paper burning” smell. This smell will gradually diminish and will be tota lly elimin ated after the first few hours of operation. Do not use the blower at this time. Front View of Logs W ARNING “FAILURE TO POSITION THE PA RTS IN ACCORDANCE ...

  • New Buck Corporation FP-BR-10-ZC - page 22

    LIGHTING INSTRUCTIONS MODULA TING V AL VE(MAXITROL) FOR YOUR SA FETY , READ BEFORE LIGHTING W ARNING IF YOU DO NOT FOLLOW THESE INST RUCTIONS EXACTLY, A FIRE OR EX- PLOSION MAY RESULT CAUSING PROPER T Y DAMAGE, PERSONAL INJURY OR LOSS OF LIFE. A. This appliance has a pilot which must be li ghted by hand. When lighting th e pilot, follow thes e inst ...

  • New Buck Corporation FP-BR-10-ZC - page 23

    LIGHTING INSTRUCTIO NS 1. STOP! Read the safety information on the previous page. 2. Make sure m anual shutoff valve is fully closed. 3. Open access panel door, located in lo wer front center of base for access to control knobs. 4. Turn off all electric power to the app liance. 5. Set the rmostat (flame control) to lowest se tting. 6. Push in and t ...

  • New Buck Corporation FP-BR-10-ZC - page 24

    PILOT PILOT BURNER IGNITER ELECTRODE THERMO-COUPLE O.D.S 13. Close the access panel door. 14. “Turn on all electric po wer to the appliance.” CAUTION DO NOT TR Y TO ADJUST HEA TING LEVELS BY USING THE MANUAL SHUTOFF V AL VE. T O TURN OFF GAS T O APPLIANCE SHUTTING OFF UNIT: 1. Open access panel door, located in lo wer front center of base for a ...

  • New Buck Corporation FP-BR-10-ZC - page 25

    THERMOST A T CONTROL OPERA TION The thermostat contro l used on this heater differs from standard therm ostats. Standard thermostats simply turn the burner on and off. Th e therm ostat used on this heater senses the room temperature and adjusts the amount of gas flow to the burner. This will increase or decrease the flame height. At times, the room ...

  • New Buck Corporation FP-BR-10-ZC - page 26

    FLAME CHECK A periodic check of the flames should be made. The pilot flam e should always be present when the gas logs are in operation. FLAME: Propane (LP) should produce a flame that is 3"-4" above rear log. This flame should be yellow. Natural gas should produce a flame that is 3"-4" above rear log. This flame should be mostl ...

  • New Buck Corporation FP-BR-10-ZC - page 27

    W ARNING: CHILDREN AND ADUL TS SHOU LD BE ALERTED TO THE HAZARDS OF HIGH SURFACE TEMPERATU RE AND SHOULD STAY AWAY TO AVOID BURNS OR CLOTHING IGNITION . YOUNG CHILDREN SHOULD BE CAREFULLY SUPERVISED WHEN THEY ARE IN THE SAME ROOM WITH THE APPLIANCE. W ARNING: DO NOT PLACE CLOTHING OR OTHER FLAMMABLE MATERIALS ON OR NEAR THE APP LIANCE. WIRING DIAGR ...

  • New Buck Corporation FP-BR-10-ZC - page 28

    W ARNING: ELECTRICAL GROUNDING INSTRUCTION: THIS APPLIANCE IS EQUIPPED WITH A TH REE-PR ONG (GROUNDING) PLUG F OR YOUR PROTECTION AGAINST SHOCK HAZ ARD AND SHOULD BE PLUGGED DIRECTLY INTO A PROPERLY GROU NDED THREE-PRONG RECEPTACLE. NOTE: #PESBRO84 Blower Motor Rating: 120 volts/60HZ/0.54 Amps. 1 P.H NOTE: For convenience, allow licensed elec trici ...

  • New Buck Corporation FP-BR-10-ZC - page 29

    IMPOR T ANT SAFEGUARDS Although your gas logs are very realistic in appearan ce, it is not a real burning fireplace and must not be used for burning rejected material. • To avoid irreparable damage to the heater or pers onal injury, m atches, paper, garbage, or any other material must not be placed or thrown on top of the logs or into the flames. ...

  • New Buck Corporation FP-BR-10-ZC - page 30

    TROUBLESHOOTING W ARNING TURN OFF BURNER, UNPLUG HEATER AND LET COOL BEFORE SERVICING. ONLY A QUALIFIE D SERVICE PERSON SHOULD SERVICE AND REPAIR HEATER. CAUTION NEVER USE A WIRE, NEEDLE, OR SIMILAR OBJECT TO CLEAN ODS/PILOT. THIS CAN DAMAGE ODS/PILOT. OBSERVED PROBLEM 1. Igniter button is pressed, no spark at ODS/Pilot 2. Igniter button is pressed ...

  • New Buck Corporation FP-BR-10-ZC - page 31

    3 . ODS/Pilot lights but flame goes out when control knob is released 4. Burner does not light after ODS/Pilot is lit 5. Delayed ignition of burner 5. Depleted gas supply 6. ODS/Pilot is clogged 7. Gas regulator setting is not correct 1. Control knob is not fully pressed in 2. Control knob not pressed in long enough 3. Safety interlock system has b ...

  • New Buck Corporation FP-BR-10-ZC - page 32

    6. Burner backfiring during combustion 7. Slight smoke or odor during initial operation 8. Heater produces a whist- ling noise when burner is lit 1. Burner orifice is clogged or damaged 2. Burner damaged 3. Gas regulator defective 1. Residues from manufacturing process 1. Turning control knob to “HI” position when burner is cold (if equipped wi ...

  • New Buck Corporation FP-BR-10-ZC - page 33

    9. Heater produces a clinking/ticking noise just after burner is lit or shut off 10. Heater produces unwanted odors 11. Heater shuts off in use (ODS operates) 12. Gas odor even when control knob is in “OFF” position 13. Gas odor during combustion 1. Metal expands while heating or contracts while cooling. 1. Heater burning vapors from paint, hai ...

  • New Buck Corporation FP-BR-10-ZC - page 34

    SER VICING Repair and replacement work should only be perf ormed by a qualified service technician. Always shut off the gas supply and make sure heater is cool before beginning any service operation. Check for gas leaks after servicing. R E PA I R PA R T S A parts list with exploded view follows. Always include correct name, part number, and model ...

  • New Buck Corporation FP-BR-10-ZC - page 35

    P AR TS LIST Maxitr ol V alve KEY # PART # DESCRIPTION QUANTITY 1 GV 30B5A2L7B Maxitrol LP Valve 1 1A GV 30B5A2N7B Maxitrol Nat. Valve 1 2 PE 4966 3/8" - 3/8" Elbow 1 3 PS 112736 Maxitrol Regulator Holder 1 4 PS 1024 BR 10 Burner Base 1 5 PO BR10 Burn Single Burner 1 6 PE TPT100/433 Thermo-couple/ (Copreci) 1 7 PE 21500053 Copreci ODS Nat ...

  • New Buck Corporation FP-BR-10-ZC - page 36

    BLOWN UP VIEW OF BURNER ASSEMBL Y *16 Not shown on this pa ge. See page 25, figure 1 0 for wiring diagram . Page 34 ...

  • New Buck Corporation FP-BR-10-ZC - page 37

    NEW BUCK CORPORA TION We reserve the right to amend these specifica tions at any time without notice. The only warranty applicable is o ur standard written warra nty. We offer no other warranty, expressed or implied. LIMITED W ARRANTY MODEL FP-BR10-ZC New Buck warrants this product to be free from defects in materials and components for two (2) yea ...

  • New Buck Corporation FP-BR-10-ZC - page 38

    Page 36 ...

Производитель New Buck Corporation Категория Indoor Fireplace

Документы, которые мы получаем от производителя устройства New Buck Corporation FP-BR-10-ZC мы можем разделить на несколько групп. Это в частности:
- технические чертежи New Buck Corporation
- инструкции обслуживания FP-BR-10-ZC
- паспорта изделия New Buck Corporation
- информационные брошюры
- энергетические этикетки New Buck Corporation FP-BR-10-ZC
Все из них важны, однако самую важную информацию с точки зрения пользователя мы найдем в инструкции обслуживания New Buck Corporation FP-BR-10-ZC.

Группа документов, определяемая как инструкции обслуживания, делится также на более подробные типы, такие как: Инструкции монтажа New Buck Corporation FP-BR-10-ZC, инструкции обслуживания, короткие инструкции или инструкции пользователя New Buck Corporation FP-BR-10-ZC. В зависимости от потребностей, Вам необходимо поискать требуемый документ. На нашем сайте Вы можете просмотреть самую популярную инструкцию использования изделия New Buck Corporation FP-BR-10-ZC.

Похожие инструкции обслуживания

Полная инструкция обслуживания устройства New Buck Corporation FP-BR-10-ZC, как должна выглядеть?
Инструкция обслуживания, определяемая также как пособие пользователя, или просто "руководство" - это технический документ, цель которого заключается в использовании New Buck Corporation FP-BR-10-ZC пользователями. Инструкции пишет, как правило технический писатель, языком, доступным для всех пользователей New Buck Corporation FP-BR-10-ZC.

Полная инструкция обслуживания New Buck Corporation, должна заключать несколько основных элементов. Часть из них менее важная, как например: обложка / титульный лист или авторские страницы. Однако остальная часть, должна дать нам важную с точки зрения пользователя информацию.

1. Вступление и рекомендации, как пользоваться инструкцией New Buck Corporation FP-BR-10-ZC - В начале каждой инструкции, необходимо найти указания, как пользоваться данным пособием. Здесь должна находится информация, касающаяся местонахождения содержания New Buck Corporation FP-BR-10-ZC, FAQ и самых распространенных проблем - то есть мест, которые чаще всего ищут пользователи в каждой инструкции обслуживания
2. Содержание - индекс всех советов, касающихся New Buck Corporation FP-BR-10-ZC, которое найдем в данном документе
3. Советы по использованию основных функций устройства New Buck Corporation FP-BR-10-ZC - которые должны облегчить нам первые шаги во время использования New Buck Corporation FP-BR-10-ZC
4. Troubleshooting - систематизированный ряд действия, который поможет нам диагностировать а в дальнейшем очередность решения важнейших проблем New Buck Corporation FP-BR-10-ZC
5. FAQ - чаще всего задаваемые вопросы
6. Контактные данные Информация о том, где искать контактные данные производителя / сервисного центра New Buck Corporation FP-BR-10-ZC в данной стране, если самостоятельно не получится решить проблему.

У вас вопрос, касающийся New Buck Corporation FP-BR-10-ZC?

Воспользуйтесь формуляром, находящимся ниже

Если с помощью найденной инструкции Вы не решили свою проблему с New Buck Corporation FP-BR-10-ZC, задайте вопрос, заполнив следующий формуляр. Если у какого то из пользователей была похожая проблема с New Buck Corporation FP-BR-10-ZC со всей вероятностью он захочет поделиться методом ее решения.

Перепишите текст с картинки

Комментарии (0)