Bedienungsanleitung Allied 506271-01

14 Seiten 0.28 mb
Download

Zur Seite of 14

Summary
  • Allied 506271-01 - page 1

    506271-01 Page 1 of 14 Issue 0921 Save these instructions for future reference INST ALLA TION INSTRUCTIONS RPGE/RGE Series Gas Heating/Electric Cooling Package Unit Do not store combustible materials, including gasoline and other flammable vapors and liquids, near the furnace, vent pipe, or warm air ducts. Such actions could cause property damage, ...

  • Allied 506271-01 - page 2

    Page 2 of 14 506271-01 Issue 0921 INST ALLA TION T hese instructions must be hung on or near the furnace in a conspicuous place. These furnace units are single package air conditioners with gas heat designed for outdoor installation on a roof top or a slab. The units are completely assembled. All piping, refrigerant charge, and electrical wiring ar ...

  • Allied 506271-01 - page 3

    506271-01 Page 3 of 14 Issue 0921 In the U.S., units may be installed on combustible floors made from wood or class A, B, or C roof covering material. In Canada, units may be installed on combustible floors. Units must be installed out doors. Service Access Access to all serviceable components is provided by four removable panels: blower comp artme ...

  • Allied 506271-01 - page 4

    Page 4 of 14 506271-01 Issue 0921 Minimum horizontal clearance of 4' from electric meters, gas meters, regulator , and relief equipment is required. In addition to the above requirements, consideration must be given to prevent unwanted ice buildup from the vent condensate. The vent should not be located on the side of a building where the prev ...

  • Allied 506271-01 - page 5

    506271-01 Page 5 of 14 Issue 0921 The supply and return air duct systems should be designed for the CFM and static requirement s of the job. They should not be sized by matching the dimensions of the duct connections on the unit. Filters Filters are not supplied with the unit. Filters must always be installed ahead of the evaporator coil and must b ...

  • Allied 506271-01 - page 6

    Page 6 of 14 506271-01 Issue 0921 Gas piping recommendations: • A drip leg and a ground joint union must be installed in the gas piping. A ground joint union is recommended by the manifold/valve. • When required by local codes, a manual shutoff valve may have to be installed outside of the unit. • Use pipe thread sealing compound resistant to ...

  • Allied 506271-01 - page 7

    506271-01 Page 7 of 14 Issue 0921 All wiring should be done in accordance with the National Electrical Code, ANSI/NFP A No. 70 (latest edition); Canadian Electrical Code Part 1, CSA C22.1 (latest edition); or local codes where they prevail. Use wiring with a temperature limitation of 75°C minimum. Run the 208 or 230 volt, 60 hertz electric power s ...

  • Allied 506271-01 - page 8

    Page 8 of 14 506271-01 Issue 0921 ST ART -UP Pre-St art Check List Complete the following checks before starting the unit: 1. Check the type of gas being supplied. Be sure it is the same as listed on the unit nameplate. 2 . Make sure that the vent cover has been properly installed. For Y our Safety Read Before Lighting T o Light Main Burners: 1. T ...

  • Allied 506271-01 - page 9

    506271-01 Page 9 of 14 Issue 0921 Manifold Gas Pressure Adjustment Regulator – Natural Gas For purpose of input adjustment, the minimum permissible gas supply pressure is 5" w .c. for natural gas. Gas input must never exceed the input capacity shown on the rating plate. The furnace is equipped for natural gas rated input s with manifold pres ...

  • Allied 506271-01 - page 10

    Page 10 of 14 506271-01 Issue 0921 7. After reassembly of all p arts is complete and all wires are reconnected, open the main manual gas shutoff valve; check for and correct any gas leaks. T urn electrical power on, initiate a call for heat, and check for proper burner operation. 8. Install burner access panel. Heat Anticipator The heat anticipator ...

  • Allied 506271-01 - page 11

    506271-01 Page 11 of 14 Issue 0921 10-second interval, then the ignition control will de- energize the gas valve. 6. The ignition control is designed to repeat this “trial for ignition” a total of three times. If, at the end of the third trial, flame still has not been established, then the ignition control will try to light again 1 hour later ...

  • Allied 506271-01 - page 12

    Page 12 of 14 506271-01 Issue 0921 Burners T o clean the burners, first remove them from the furnace as explained in Burner Instructions on page 9. V acuum and/or brush as required. V ent Outlet Visually inspect vent outlet periodically to make sure that there is no buildup of soot or dirt. If necessary , clean to maintain adequate opening to disch ...

  • Allied 506271-01 - page 13

    506271-01 Page 13 of 14 Issue 0921 Wiring Diagram – Single Phase Figure 8 ...

  • Allied 506271-01 - page 14

    Page 14 of 14 506271-01 Issue 0921 NOTES ...

Produzent Allied Kategorie Gas Heater

Dokumente, die wir vom Produzenten des Geräts Allied 506271-01 erhalten, können wir in mehrere Gruppen teilen. Unteranderem in:
- technische Zeichnungen Allied
- Bedienungsanleitungen 506271-01
- Produktkarten Allied
- Informationsbroschüren
- oder Energieetiketten Allied 506271-01
Jede von ihnen ist wichtig, jedoch finden wir die wichtigsten Informationen für den Nutzer des Geräts in der Bedienungsanleitung Allied 506271-01.

Die Dokumentengruppe, die als Bedienungsanleitungen bezeichnet wird, wird ebenfalls in detaillierte Arten geteilt, solche wie: Montageanleitungen Allied 506271-01, Wartungsanleitungen, Kurzanleitungen oder Benutzeranleitungen Allied 506271-01. Abhängig vom Bedarf, sollten Sie das Dokument finden, das Sie brauchen. In unserem Service können Sie sich die populärste Bedienungsanleitung des Produkts Allied 506271-01 ansehen.

Die komplette Bedienungsanleitung des Geräts Allied 506271-01, wie sollte sie aussehen?
Die Bedienungsanleitung, auch bezeichnet als Benutzerhandbuch, oder einfach nur „Anleitung”, ist ein technisches Dokument, das dem Benutzer bei der Nutzung von Allied 506271-01 hilfreich sein soll. Die Bedienungsanleitungen werden in der Regel von technischen Schriftstellern geschrieben, aber in einer Sprache, die für alle Nutzer von Allied 506271-01 verständlich ist.

Eine gänzliche Bedienungsanleitung von Allied sollte einige Grundelemente enthalten. Ein Teil von ihnen ist nicht so wichtig, wie z.B.: die Titelseite oder Autorenseiten. Die restlichen von ihnen jedoch, sollten Informationen liefern, die für den Nutzer von enormer Wichtigkeit sind.

1. Einführung und Hinweise, wie man sich in einer Bedienungsanleitung von Allied 506271-01 bewegt - Am Anfang jeder Bedienungsanleitung sollten wir Hinweise bezüglich der Nutzungsart eines bestimmten Ratgebers finden. In ihr sollten sich Informationen über die Lokalisierung des Inhaltsverzeichnisses von Allied 506271-01 befinden, FAQ oder über oft auftretende Probleme – also Stellen, die von den Benutzern in jeder Bedienungsanleitung am meisten gesucht werden
2. Inhaltsverzeichnis - Index aller Ratschläge bezüglich Allied 506271-01, die wir im aktuellen Dokument finden
3. Ratschläge zur Nutzung der Grundfunktionen des Geräts Allied 506271-01 - die uns die ersten Schritte während der Nutzung von Allied 506271-01 erleichtern sollten
4. Troubleshooting - geordneter Tätigkeitslauf, der uns bei der Diagnose und als nächstes bei der Lösung wichtiger Probleme mit Allied 506271-01 hilft
5. FAQ - häufig gestellte Fragen
6. Kontaktdaten Informationen darüber, wo man Kontakt zum Produzenten / Service von Allied 506271-01 im bestimmten Land suchen kann, wenn es nicht gelingt, das Problem selbst zu lösen.

Haben Sie eine Frage bezüglich Allied 506271-01?

Nutzen Sie das untere Formular

Wenn Sie mit Hilfe der gefundenen Bedienungsanleitung Ihr Problem mit Allied 506271-01 nicht gelöst haben, stellen Sie eine Frage, indem Sie das untere Formular nutzen. Wenn einer der Nutzer ein ähnliches Problem mit Allied 506271-01 hatte, ist es möglich, dass er mit Ihnen die Lösung teilen möchte.

Text vom Bild übertragen

Kommentare (0)