Allied 506271-01の取扱説明書

14ページ 0.28 mb
ダウンロード

ページに移動 of 14

Summary
  • Allied 506271-01 - page 1

    506271-01 Page 1 of 14 Issue 0921 Save these instructions for future reference INST ALLA TION INSTRUCTIONS RPGE/RGE Series Gas Heating/Electric Cooling Package Unit Do not store combustible materials, including gasoline and other flammable vapors and liquids, near the furnace, vent pipe, or warm air ducts. Such actions could cause property damage, ...

  • Allied 506271-01 - page 2

    Page 2 of 14 506271-01 Issue 0921 INST ALLA TION T hese instructions must be hung on or near the furnace in a conspicuous place. These furnace units are single package air conditioners with gas heat designed for outdoor installation on a roof top or a slab. The units are completely assembled. All piping, refrigerant charge, and electrical wiring ar ...

  • Allied 506271-01 - page 3

    506271-01 Page 3 of 14 Issue 0921 In the U.S., units may be installed on combustible floors made from wood or class A, B, or C roof covering material. In Canada, units may be installed on combustible floors. Units must be installed out doors. Service Access Access to all serviceable components is provided by four removable panels: blower comp artme ...

  • Allied 506271-01 - page 4

    Page 4 of 14 506271-01 Issue 0921 Minimum horizontal clearance of 4' from electric meters, gas meters, regulator , and relief equipment is required. In addition to the above requirements, consideration must be given to prevent unwanted ice buildup from the vent condensate. The vent should not be located on the side of a building where the prev ...

  • Allied 506271-01 - page 5

    506271-01 Page 5 of 14 Issue 0921 The supply and return air duct systems should be designed for the CFM and static requirement s of the job. They should not be sized by matching the dimensions of the duct connections on the unit. Filters Filters are not supplied with the unit. Filters must always be installed ahead of the evaporator coil and must b ...

  • Allied 506271-01 - page 6

    Page 6 of 14 506271-01 Issue 0921 Gas piping recommendations: • A drip leg and a ground joint union must be installed in the gas piping. A ground joint union is recommended by the manifold/valve. • When required by local codes, a manual shutoff valve may have to be installed outside of the unit. • Use pipe thread sealing compound resistant to ...

  • Allied 506271-01 - page 7

    506271-01 Page 7 of 14 Issue 0921 All wiring should be done in accordance with the National Electrical Code, ANSI/NFP A No. 70 (latest edition); Canadian Electrical Code Part 1, CSA C22.1 (latest edition); or local codes where they prevail. Use wiring with a temperature limitation of 75°C minimum. Run the 208 or 230 volt, 60 hertz electric power s ...

  • Allied 506271-01 - page 8

    Page 8 of 14 506271-01 Issue 0921 ST ART -UP Pre-St art Check List Complete the following checks before starting the unit: 1. Check the type of gas being supplied. Be sure it is the same as listed on the unit nameplate. 2 . Make sure that the vent cover has been properly installed. For Y our Safety Read Before Lighting T o Light Main Burners: 1. T ...

  • Allied 506271-01 - page 9

    506271-01 Page 9 of 14 Issue 0921 Manifold Gas Pressure Adjustment Regulator – Natural Gas For purpose of input adjustment, the minimum permissible gas supply pressure is 5" w .c. for natural gas. Gas input must never exceed the input capacity shown on the rating plate. The furnace is equipped for natural gas rated input s with manifold pres ...

  • Allied 506271-01 - page 10

    Page 10 of 14 506271-01 Issue 0921 7. After reassembly of all p arts is complete and all wires are reconnected, open the main manual gas shutoff valve; check for and correct any gas leaks. T urn electrical power on, initiate a call for heat, and check for proper burner operation. 8. Install burner access panel. Heat Anticipator The heat anticipator ...

  • Allied 506271-01 - page 11

    506271-01 Page 11 of 14 Issue 0921 10-second interval, then the ignition control will de- energize the gas valve. 6. The ignition control is designed to repeat this “trial for ignition” a total of three times. If, at the end of the third trial, flame still has not been established, then the ignition control will try to light again 1 hour later ...

  • Allied 506271-01 - page 12

    Page 12 of 14 506271-01 Issue 0921 Burners T o clean the burners, first remove them from the furnace as explained in Burner Instructions on page 9. V acuum and/or brush as required. V ent Outlet Visually inspect vent outlet periodically to make sure that there is no buildup of soot or dirt. If necessary , clean to maintain adequate opening to disch ...

  • Allied 506271-01 - page 13

    506271-01 Page 13 of 14 Issue 0921 Wiring Diagram – Single Phase Figure 8 ...

  • Allied 506271-01 - page 14

    Page 14 of 14 506271-01 Issue 0921 NOTES ...

メーカー Allied カテゴリー Gas Heater

Allied 506271-01のメーカーから受け取ることができるドキュメントは、いくつかのグループに分けられます。その一部は次の通りです:
- #BRANDの図面#
- 506271-01の取扱説明書
- Alliedの製品カード
- パンフレット
- またはAllied 506271-01の消費電力シール
それらは全部重要ですが、デバイス使用の観点から最も重要な情報は、Allied 506271-01の取扱説明書に含まれています。

取扱説明書と呼ばれる文書のグループは、Allied 506271-01の取り付け説明書、サービスマニュアル、簡易説明書、またはAllied 506271-01のユーザーマニュアル等、より具体的なカテゴリーに分類されます。ご必要に応じてドキュメントを検索しましょう。私たちのウェブサイトでは、Allied 506271-01の製品を使用するにあたって最も人気のある説明書を閲覧できます。

関連する取扱説明書

Allied 506271-01デバイスの取扱説明書はどのようなものですか?
取扱説明書は、ユーザーマニュアル又は単に「マニュアル」とも呼ばれ、ユーザーがAllied 506271-01を使用するのを助ける技術的文書のことです。説明書は通常、全てのAllied 506271-01ユーザーが容易に理解できる文章にて書かれており、その作成者はその分野の専門家です。

Alliedの取扱説明書には、基本的な要素が記載されているはずです。その一部は、カバー/タイトルページ、著作権ページ等、比較的重要度の低いものです。ですが、その他の部分には、ユーザーにとって重要な情報が記載されているはずです。

1. Allied 506271-01の説明書の概要と使用方法。説明書にはまず、その閲覧方法に関する手引きが書かれているはずです。そこにははAllied 506271-01の目次に関する情報やよくある質問、最も一般的な問題に関する情報を見つけられるはずです。つまり、それらはユーザーが取扱説明書に最も期待する情報なのです。
2. 目次。Allied 506271-01に関してこのドキュメントで見つけることができる全てのヒントの目次
3. Allied 506271-01デバイスの基本機能を使うにあたってのヒント。 Allied 506271-01のユーザーが使い始めるのを助けてくれるはずです。
4. トラブルシューティング。Allied 506271-01に関する最も重要な問題を診断し、解決するために役立つ体系化された手続き
5. FAQ。よくある質問
6. 連絡先。一人では問題を解決できない場合に、その国におけるAllied 506271-01のメーカー/サービスへの連絡先に関する情報。

Allied 506271-01についてご質問がありますか?

次のフォームを使用してください

見つけた説明書を読んでもAllied 506271-01の問題を解決できない場合、下記のフォームを使用して質問をしましょう。ユーザーのどなたかがAllied 506271-01で同様の問題を抱えていた場合、その解決方法を共有したいと考えるかもしれません。

画像のテキストを入力してください

コメント (0)