Manuale per l’uso GE ZV541

20 pagine 0.44 mb
Scarica

Vai alla pagina of 20

Summary
  • GE ZV541 - page 1

    If you have questions , call 800.GE.CARES or visit our website at: monogram.com Installation Instructions Island V ent Hoods Models: ZV42 I ZV54 I ...

  • GE ZV541 - page 2

    2 Installation Instructions W ARNING: TO REDUCE THE RISK OF FIRE, ELECTRICAL SHOCK OR INJURY , OBSERVE THE FOLLOWING: A. Use this unit only in the manner intended by the manufacturer . If you have any questions, contact the manufacturer . B. Before servicing or cleaning unit, switch power off at the service panel and lock service panel to prevent p ...

  • GE ZV541 - page 3

    3 Design Information 42” HOOD DIMENSIONS Model ZV42 I Model ZV54 I CONTENTS Design Information Product Dimensions ......................................................................3 Duct Cover Accessories ..............................................................4 Product Clearances ........................................................ ...

  • GE ZV541 - page 4

    4 Design Information DUCT COVER ACCESSORIES ZV42 I * 9" for ceiling heights 7’11" to 8’5" using the supplied support frame and duct cover . Order ZX42DC10 for ceiling heights of 8"6" to 10’4". ZV54 I * 5" for ceiling heights 7’11" to 8’5" using the supplied support frame and duct cover . Order ...

  • GE ZV541 - page 5

    5 Advance Planning ADV ANCE PLANNING Ductwork Planning • These vent hoods are equipped for 10” round ductwork. • Determine the exact location of the vent hood. • Plan the route for venting exhaust to the outdoors. • Use the shortest and straightest duct route possible. For satisfactory performance, duct run should not exceed 150 ft. equiv ...

  • GE ZV541 - page 6

    INST ALLA TION HEIGHT REQUIREMENTS • These vent hoods must be installed 30" min. and 36" max. above the cooking surface – regardless of the ceiling height. Therefore, installation height of the hood depends on the exact ceiling height of the kitchen. • Accessories are available for ceiling heights 8’6" and up to 10’4". ...

  • GE ZV541 - page 7

    Use this chart to compute maximum permissible lengths for duct runs to outdoors. For best results, use 10" diameter duct. Note: Do not exceed maximum permissible equivalent lengths! Maximum recommended duct length for these hoods: 150 feet Flexible ducting: If flexible metal ducting is used, all the equivalent feet values in the table should b ...

  • GE ZV541 - page 8

    8 Installation Preparation TOOLS AND MA TERIALS REQUIRED (NOT SUPPLIED) Pencil and tape measure Pliers Electric or battery operated drill and 3/16", bits, Phillips and Flat Blade Screwdriver bits. 120V 60Hz. 15 or 20 Amp, 2-wire with ground. Properly grounded branch circuit. Key Hole Saw Hammer Wire cutter/stripper Step ladder Metal Snips Sabe ...

  • GE ZV541 - page 9

    9 Installation Preparation P ARTS PROVIDED Locate the parts packed with the hood. HARDW ARE P ACKAGE Locate and check contents. Screws shown actual size. 2 Grease trays (3 with 54" hood) Implement rods with standoffs Duct collar Support frame for 8 ft. ceiling with 4 large pan head screws installed on the bottom corners. 2-piece decorative duc ...

  • GE ZV541 - page 10

    10 Plan the Location of the Hood and Ductwork • Use a plumb bob to check the location. The countertop/cooktop below the hood must be centered with the hood. • The hood should extend beyond the front and rear edge of the cooking appliance. • The duct in the ceiling must be centered over the cooktop. STEP 1 CONSTRUCT CEILING SUPPORT Installatio ...

  • GE ZV541 - page 11

    11 T op View – Ceiling Joists Run Perpendicular to Front of Hood T op View – Ceiling Joists at Angle with Front of Hood Installation Instructions STEP 1 CONSTRUCT CEILING SUPPORT CONTINUED 12-3/4 ” (42 ” Hood) 17 ” (54 ” Hood) Install Cross- Framing Symmetrically About Duct/Cooktop Centerline 16 ” Joist Spacing 8 5/8 ” 10 ” Duct F ...

  • GE ZV541 - page 12

    12 STEP 1 CONSTRUCT CEILING SUPPORT CONTINUED Installation Instructions Ductwork • Use the shortest and straightest duct route possible. For satisfactory performance, duct run should not exceed 150 feet equivalent length for any duct configuration. • Refer to “ Duct Fittings ” chart to compute the maximum permissible length for duct runs to ...

  • GE ZV541 - page 13

    13 • Select the template for your hood size. • Align the template with the marks on the ceiling and tape in place. – Be sure the template is oriented correctly , with the front of the hood. • Use a plumb to check to be sure the mounting holes will provide parallel alignment with the countertop below . • Center punch all hole locations. ? ...

  • GE ZV541 - page 14

    14 Installation Instructions STEP 4 INST ALL ACCESSORY (OR SUPPLIED) SUPPOR T AND DUCT COVERS Install supplied support frame OR telescoping accessory frame • Hang the supplied support frame or telescoping accessory frame to the ceiling joists and cross framing on the 4 hex head screws by engaging the keyhole slots on the frame. • Check to be su ...

  • GE ZV541 - page 15

    15 Installation Instructions STEP 5 INST ALL DUCT TRANSITION WITH DAMPER IMPORT ANT : Remove shipping tape from damper and check that damper moves freely . • Place the transition piece over the hood exhaust and secure with 4 Screws C provided. • Use duct tape to seal the connection. Check to be sure the damper moves freely . STEP 6 INST ALL HOO ...

  • GE ZV541 - page 16

    16 Installation Instructions STEP 8 CONNECT ELECTRICAL V erify that power is turned off at the source. W ARNING: If house wiring is not 2-wire with a ground wire, a ground must be provided by the installer . When house wiring is aluminum, be sure to use UL approved anti-oxidant compound and aluminum-to-copper connectors. A TTENTION – Si le c â b ...

  • GE ZV541 - page 17

    17 Installation Instructions STEP 11 INST ALL FIL TERS • Insert the filter into the upper opening and drop into the trays. • T o remove the filters, grasp the knobs and push the filter up and lift out. STEP 12 INST ALL RODS • Use a flat blade screwdriver to install stand-offs into the bottom of the hood. • Align implement rod to stand-offs ...

  • GE ZV541 - page 18

    18 STEP 13 INST ALL SUPPLIED DUCT COVER AND TOP COVER STEP 14 FINALIZE INST ALLA TION • Check all lamps to assure tightness in sockets. • T urn power on at the circuit breaker . • Refer to the Owner ’ s Manual for operating and cleaning instructions. • Engage tabs into slots on each side at the top of the hood. The covers should lay flat ...

  • GE ZV541 - page 19

    19 STEP 15 INST ALLA TION CHECKLIST Check Blower Safety Screw ■ ■ Ensure that blower safety screw is securely tightened. See page 16, Step 9. If screw is missing, order replacement parts bag. Check Operating Sound and Proper Air -Flow ■ ■ T urn blower to each speed setting and listen for rattles and vibration. Y ou should notice an audible ...

  • GE ZV541 - page 20

    Pub. No. 49-80209-3 01-08 JR Note: While performing installations described in this book, safety glasses or goggles should be worn. For Monogram ® local ser vice in your area, call 1.800.444.1845. Note: Product improvement is a continuing endeavor at General Electric. Therefore, materials, appearance and specifications are subject to change withou ...

Fabbricante GE Categoria Ventilation Hood

I documenti che otteniamo dal fabbricante del dispositivoGE ZV541 possono essere suddivisi in diversi gruppi. Questi sono tra gli altri:
- disegni tecnici GE
- manuali per l’uso ZV541
- schede prodotto GE
- opuscoli
- o etichette energetiche GE ZV541
Tutti sono importanti, ma le informazioni più importanti dal punto di vista di utilizzo del dispositivo possono essere trovate nel manuale per l’uso GE ZV541.

Un gruppo di documenti denominato manuali per l’uso, è anche suddiviso in tipi più specifici, come: Manuali di installazione GE ZV541, manuali di manutenzione, brevi manuali o manuali utente GE ZV541. A seconda delle esigenze, si dovrebbe cercare il documento necessario. Nel nostro sito web, puoi visualizzare il manuale più popolare per l'uso del prodotto GE ZV541.

Manuali per l’uso simili

Manuale completo del dispositivo GE ZV541, come deve essere?
Il manuale per l’uso, denominato anche istruzioni per l’uso, o semplicemente il manuale è un documento tecnico progettato per aiutare ad utilizzare GE ZV541 dagli utenti. I manuali sono di solito scritti da uno scrittore tecnico, ma in un linguaggio accessibile a tutti gli utenti GE ZV541.

Il manuale per l’uso completo GE, dovrebbe includere vari elementi di base. Alcuni di loro sono meno importanti, come ad esempio: copertina / pagina del titolo o pagina di autore. Tuttavia, la parte rimanente, dovrebbe fornire informazioni importanti dal punto di vista dell'utente.

1. Introduzione e la guida su come utilizzare il manuale GE ZV541 - All'inizio di ogni manuale, dovremmo trovare indizi su come utilizzare il documento. Dovrebbe contenere informazioni sulla posizione dell’indice GE ZV541, FAQ o i problemi più comuni : i punti che sono più spesso cercati dagli utenti di ogni manuale
2. Indice - elenco di tutti i suggerimenti per GE ZV541 che possono essere trovati nel documento corrente
3. Suggerimenti su come utilizzare le funzioni di base del dispositivo GE ZV541 - che ci dovrebbe aiutare nei primi passi durante l'uso GE ZV541
4. Troubleshooting - sequenza sistematica delle attività che vi aiuterà a diagnosticare e, successivamente, risolvere i problemi più importanti del GE ZV541
5. FAQ - domande più frequenti
6. Dettagli di contatto Informazioni su dove cercare il contatto con il fabbricante / servizio GE ZV541 in un dato paese, se il problema non può essere risolto da noi stessi.

Hai una domanda su GE ZV541?

Utilizza il modulo sottostante

Se non hai risolto il problema con GE ZV541 con l'aiuto del manuale che hai trovato, fai una domanda utilizzando il modulo sottostante. Se un utente ha avuto un problema simile con GE ZV541 è probabile che voglia condividere il modo di risolverlo.

Riscrivi il testo dall’immagine

Commenti (0)