GE ZV541の取扱説明書

20ページ 0.44 mb
ダウンロード

ページに移動 of 20

Summary
  • GE ZV541 - page 1

    If you have questions , call 800.GE.CARES or visit our website at: monogram.com Installation Instructions Island V ent Hoods Models: ZV42 I ZV54 I ...

  • GE ZV541 - page 2

    2 Installation Instructions W ARNING: TO REDUCE THE RISK OF FIRE, ELECTRICAL SHOCK OR INJURY , OBSERVE THE FOLLOWING: A. Use this unit only in the manner intended by the manufacturer . If you have any questions, contact the manufacturer . B. Before servicing or cleaning unit, switch power off at the service panel and lock service panel to prevent p ...

  • GE ZV541 - page 3

    3 Design Information 42” HOOD DIMENSIONS Model ZV42 I Model ZV54 I CONTENTS Design Information Product Dimensions ......................................................................3 Duct Cover Accessories ..............................................................4 Product Clearances ........................................................ ...

  • GE ZV541 - page 4

    4 Design Information DUCT COVER ACCESSORIES ZV42 I * 9" for ceiling heights 7’11" to 8’5" using the supplied support frame and duct cover . Order ZX42DC10 for ceiling heights of 8"6" to 10’4". ZV54 I * 5" for ceiling heights 7’11" to 8’5" using the supplied support frame and duct cover . Order ...

  • GE ZV541 - page 5

    5 Advance Planning ADV ANCE PLANNING Ductwork Planning • These vent hoods are equipped for 10” round ductwork. • Determine the exact location of the vent hood. • Plan the route for venting exhaust to the outdoors. • Use the shortest and straightest duct route possible. For satisfactory performance, duct run should not exceed 150 ft. equiv ...

  • GE ZV541 - page 6

    INST ALLA TION HEIGHT REQUIREMENTS • These vent hoods must be installed 30" min. and 36" max. above the cooking surface – regardless of the ceiling height. Therefore, installation height of the hood depends on the exact ceiling height of the kitchen. • Accessories are available for ceiling heights 8’6" and up to 10’4". ...

  • GE ZV541 - page 7

    Use this chart to compute maximum permissible lengths for duct runs to outdoors. For best results, use 10" diameter duct. Note: Do not exceed maximum permissible equivalent lengths! Maximum recommended duct length for these hoods: 150 feet Flexible ducting: If flexible metal ducting is used, all the equivalent feet values in the table should b ...

  • GE ZV541 - page 8

    8 Installation Preparation TOOLS AND MA TERIALS REQUIRED (NOT SUPPLIED) Pencil and tape measure Pliers Electric or battery operated drill and 3/16", bits, Phillips and Flat Blade Screwdriver bits. 120V 60Hz. 15 or 20 Amp, 2-wire with ground. Properly grounded branch circuit. Key Hole Saw Hammer Wire cutter/stripper Step ladder Metal Snips Sabe ...

  • GE ZV541 - page 9

    9 Installation Preparation P ARTS PROVIDED Locate the parts packed with the hood. HARDW ARE P ACKAGE Locate and check contents. Screws shown actual size. 2 Grease trays (3 with 54" hood) Implement rods with standoffs Duct collar Support frame for 8 ft. ceiling with 4 large pan head screws installed on the bottom corners. 2-piece decorative duc ...

  • GE ZV541 - page 10

    10 Plan the Location of the Hood and Ductwork • Use a plumb bob to check the location. The countertop/cooktop below the hood must be centered with the hood. • The hood should extend beyond the front and rear edge of the cooking appliance. • The duct in the ceiling must be centered over the cooktop. STEP 1 CONSTRUCT CEILING SUPPORT Installatio ...

  • GE ZV541 - page 11

    11 T op View – Ceiling Joists Run Perpendicular to Front of Hood T op View – Ceiling Joists at Angle with Front of Hood Installation Instructions STEP 1 CONSTRUCT CEILING SUPPORT CONTINUED 12-3/4 ” (42 ” Hood) 17 ” (54 ” Hood) Install Cross- Framing Symmetrically About Duct/Cooktop Centerline 16 ” Joist Spacing 8 5/8 ” 10 ” Duct F ...

  • GE ZV541 - page 12

    12 STEP 1 CONSTRUCT CEILING SUPPORT CONTINUED Installation Instructions Ductwork • Use the shortest and straightest duct route possible. For satisfactory performance, duct run should not exceed 150 feet equivalent length for any duct configuration. • Refer to “ Duct Fittings ” chart to compute the maximum permissible length for duct runs to ...

  • GE ZV541 - page 13

    13 • Select the template for your hood size. • Align the template with the marks on the ceiling and tape in place. – Be sure the template is oriented correctly , with the front of the hood. • Use a plumb to check to be sure the mounting holes will provide parallel alignment with the countertop below . • Center punch all hole locations. ? ...

  • GE ZV541 - page 14

    14 Installation Instructions STEP 4 INST ALL ACCESSORY (OR SUPPLIED) SUPPOR T AND DUCT COVERS Install supplied support frame OR telescoping accessory frame • Hang the supplied support frame or telescoping accessory frame to the ceiling joists and cross framing on the 4 hex head screws by engaging the keyhole slots on the frame. • Check to be su ...

  • GE ZV541 - page 15

    15 Installation Instructions STEP 5 INST ALL DUCT TRANSITION WITH DAMPER IMPORT ANT : Remove shipping tape from damper and check that damper moves freely . • Place the transition piece over the hood exhaust and secure with 4 Screws C provided. • Use duct tape to seal the connection. Check to be sure the damper moves freely . STEP 6 INST ALL HOO ...

  • GE ZV541 - page 16

    16 Installation Instructions STEP 8 CONNECT ELECTRICAL V erify that power is turned off at the source. W ARNING: If house wiring is not 2-wire with a ground wire, a ground must be provided by the installer . When house wiring is aluminum, be sure to use UL approved anti-oxidant compound and aluminum-to-copper connectors. A TTENTION – Si le c â b ...

  • GE ZV541 - page 17

    17 Installation Instructions STEP 11 INST ALL FIL TERS • Insert the filter into the upper opening and drop into the trays. • T o remove the filters, grasp the knobs and push the filter up and lift out. STEP 12 INST ALL RODS • Use a flat blade screwdriver to install stand-offs into the bottom of the hood. • Align implement rod to stand-offs ...

  • GE ZV541 - page 18

    18 STEP 13 INST ALL SUPPLIED DUCT COVER AND TOP COVER STEP 14 FINALIZE INST ALLA TION • Check all lamps to assure tightness in sockets. • T urn power on at the circuit breaker . • Refer to the Owner ’ s Manual for operating and cleaning instructions. • Engage tabs into slots on each side at the top of the hood. The covers should lay flat ...

  • GE ZV541 - page 19

    19 STEP 15 INST ALLA TION CHECKLIST Check Blower Safety Screw ■ ■ Ensure that blower safety screw is securely tightened. See page 16, Step 9. If screw is missing, order replacement parts bag. Check Operating Sound and Proper Air -Flow ■ ■ T urn blower to each speed setting and listen for rattles and vibration. Y ou should notice an audible ...

  • GE ZV541 - page 20

    Pub. No. 49-80209-3 01-08 JR Note: While performing installations described in this book, safety glasses or goggles should be worn. For Monogram ® local ser vice in your area, call 1.800.444.1845. Note: Product improvement is a continuing endeavor at General Electric. Therefore, materials, appearance and specifications are subject to change withou ...

メーカー GE カテゴリー Ventilation Hood

GE ZV541のメーカーから受け取ることができるドキュメントは、いくつかのグループに分けられます。その一部は次の通りです:
- #BRANDの図面#
- ZV541の取扱説明書
- GEの製品カード
- パンフレット
- またはGE ZV541の消費電力シール
それらは全部重要ですが、デバイス使用の観点から最も重要な情報は、GE ZV541の取扱説明書に含まれています。

取扱説明書と呼ばれる文書のグループは、GE ZV541の取り付け説明書、サービスマニュアル、簡易説明書、またはGE ZV541のユーザーマニュアル等、より具体的なカテゴリーに分類されます。ご必要に応じてドキュメントを検索しましょう。私たちのウェブサイトでは、GE ZV541の製品を使用するにあたって最も人気のある説明書を閲覧できます。

関連する取扱説明書

GE ZV541デバイスの取扱説明書はどのようなものですか?
取扱説明書は、ユーザーマニュアル又は単に「マニュアル」とも呼ばれ、ユーザーがGE ZV541を使用するのを助ける技術的文書のことです。説明書は通常、全てのGE ZV541ユーザーが容易に理解できる文章にて書かれており、その作成者はその分野の専門家です。

GEの取扱説明書には、基本的な要素が記載されているはずです。その一部は、カバー/タイトルページ、著作権ページ等、比較的重要度の低いものです。ですが、その他の部分には、ユーザーにとって重要な情報が記載されているはずです。

1. GE ZV541の説明書の概要と使用方法。説明書にはまず、その閲覧方法に関する手引きが書かれているはずです。そこにははGE ZV541の目次に関する情報やよくある質問、最も一般的な問題に関する情報を見つけられるはずです。つまり、それらはユーザーが取扱説明書に最も期待する情報なのです。
2. 目次。GE ZV541に関してこのドキュメントで見つけることができる全てのヒントの目次
3. GE ZV541デバイスの基本機能を使うにあたってのヒント。 GE ZV541のユーザーが使い始めるのを助けてくれるはずです。
4. トラブルシューティング。GE ZV541に関する最も重要な問題を診断し、解決するために役立つ体系化された手続き
5. FAQ。よくある質問
6. 連絡先。一人では問題を解決できない場合に、その国におけるGE ZV541のメーカー/サービスへの連絡先に関する情報。

GE ZV541についてご質問がありますか?

次のフォームを使用してください

見つけた説明書を読んでもGE ZV541の問題を解決できない場合、下記のフォームを使用して質問をしましょう。ユーザーのどなたかがGE ZV541で同様の問題を抱えていた場合、その解決方法を共有したいと考えるかもしれません。

画像のテキストを入力してください

コメント (0)