Pelco SB1900の取扱説明書

20ページ 0.21 mb
ダウンロード

ページに移動 of 20

Summary
  • Pelco SB1900 - page 1

    SB19/SB1900 Series Discr eet Surveillance Enclosures Installation/Operation Manual C467M-D (5/95) ® Pelco • 3500 W. Pontiac Way, Clovis, CA 93612-5699 • USA • www.pelco.com (800) 289-9100 or (1-559) 292-1981 • FAX (800) 289-9150 or (1-559) 292-3827 ...

  • Pelco SB1900 - page 2

    REVISION HISTORY Manual # Date Comments C467M 2/90 Original Version. C467M 3/90 Rev. A. “Scope” section expanded to include warnings. Updated model and options section. Figure 5 Added. C467M 11/90 Rev. B. Addendum incorporated @ Figure 19 Exploded Assy Diagram. Wiring diagram changes added. Previous Figure 3 deleted; wiring table made up. C467M ...

  • Pelco SB1900 - page 3

    Pelco Manual C467M-D (5/95) 1 Please thoroughly familiarize yourself with the information in this manual prior to installation and operation. This symbol indicates that dangerous voltage constituting a risk of electric shock is present within this unit. CAUTION : TO REDUCE THE RISK OF ELECTRICAL SHOCK, DO NOT REMOVE COVER. NO USER-SERVICEABLE PARTS ...

  • Pelco SB1900 - page 4

    2 Pelco Manual C467M-D (5/95) 2.0 SCOPE The information contained within this manual covers the SB19/SB1900 Series of Discreet Surveillance En- closures. 3.0 DESCRIPTION The SB19 is a low profile, hemisphere, discreet sur- veillance dome for CCD type cameras designed for ease of installation, relocation, and servicing in hard ceiling applications o ...

  • Pelco SB1900 - page 5

    Pelco Manual C467M-D (5/95) 3 Figure 1. SB1900 Series Wiring Diagram ...

  • Pelco SB1900 - page 6

    4 Pelco Manual C467M-D (5/95) 4.3 MOUNTING INSTRUCTIONS Determine the type of mounting desired. The enclo- sure can be mounted in a hard ceiling, completely re- place a standard 2' x 2' suspended ceiling tile using the APSB19 optional faceplate, or be inserted through a cut-out in a standard 2' x 2' suspended ceiling tile. Handl ...

  • Pelco SB1900 - page 7

    Pelco Manual C467M-D (5/95) 5 7. Slide the back box through the ceiling tile and mounting plate and replace the four (4) 1/4-20 bolts and tighten to secure the back box to the mounting plate. 8. Check the alignment of the back box to the ceiling tile by attaching the 12.5" round faceplate trim to the bottom of the back box, aligning the two st ...

  • Pelco SB1900 - page 8

    6 Pelco Manual C467M-D (5/95) 13. Attach the dome to the pan/tilt by aligning the two ball studs protruding through the flange of the dome with the two holes in the dome attachment brack- ets and engaging the studs. 14. Attach the safety chain on the side of the back box to the short 4-40 threaded screw in the 12.5" round faceplate trim with t ...

  • Pelco SB1900 - page 9

    Pelco Manual C467M-D (5/95) 7 4.3.1.2 Suspended Ceiling Tile Replacement Mounting T o mount the enclosure into a suspended ceiling grid where the tile is replaced, perform the following steps. 1. Determine the location for mounting the enclosure and remove the appropriate ceiling tile. IMPORT ANT : When installing the enclo- sure in a 2' x 4&a ...

  • Pelco SB1900 - page 10

    8 Pelco Manual C467M-D (5/95) 12. Attach the safety chain on the side of the back box to the short 4-40 threaded screw in the 12.5" round faceplate trim with the provided hardware. 13. Attach the faceplate trim to the back box by align- ing the two serrated studs with two of the holes in the edges of the back box and engaging the studs. 14. Op ...

  • Pelco SB1900 - page 11

    Pelco Manual C467M-D (5/95) 9 12. Attach the faceplate trim to the back box by align- ing the two serrated studs with two of the holes in the edges of the back box and engaging the studs. 13. Operate the pan/tilt to verify that there are no ob- structions or dragging cables within the back box or dome. 4.4 CONNECTOR ASSEMBL Y T o install and test t ...

  • Pelco SB1900 - page 12

    10 Pelco Manual C467M-D (5/95) 5.0 CARE AND MAINTENANCE Regularly scheduled maintenance will prolong the op- erational life and appearance of the equipment. IMPORT ANT : The lower dome of the en- closure is an optical surface. When cleaning the inner surface of the dome and viewing window , treat as carefully as you would a fine camera lens. Do not ...

  • Pelco SB1900 - page 13

    Pelco Manual C467M-D (5/95) 11 6.0 EXPLODED ASSEMBL Y DIAGRAM Refer to Figure 7 for an exploded assembly diagram of the SB19 enclosure. Figure 7. SB19 Exploded Assembly Diagram PP ONL Y NON SL ONL Y * ** EXP ASB1900 EXP ASB1900PP ...

  • Pelco SB1900 - page 14

    12 Pelco Manual C467M-D (5/95) 7.0 EXPLODED ASSEMBL Y MECHANICAL PARTS LIST Item Qty Description Pelco Part Number 1 1 UL, Pad, camera, black .062" thick EH200010004 2 1 PCB assembly , pan/tilt PCB3000100ASSY 3 1 Bushing, 3/8" tilt shaft PT180010001 4 1 Shaft, tilt table PT18004002COMP 5 1 Sprocket .25" bore with pin and SS PT1800400 ...

  • Pelco SB1900 - page 15

    Pelco Manual C467M-D (5/95) 13 7.0 EXPLODED ASSEMBL Y MECHANICAL PARTS LIST (continued) Item Qty Description Pelco Part Number 48 Not used 49 Not used 50 Not used 51 1 Slip ring, 24 circuit for presets 250010000 52 Not used 53 Not used 54 Not used 55 1 Bracket, tilt pot PT18044012COMP 56 1 Bracket, LPP lens connector PT18044013COMP 57 1 Gear , 1.87 ...

  • Pelco SB1900 - page 16

    14 Pelco Manual C467M-D (5/95) 8.0 MODELS DD1900 Dome drive unit for SB1900. (UL) DD1900-PP Dome drive unit for SB1900-PP . DD1900-SL Dome drive unit for SB1900-SL. (UL) DD1900SL-PP Dome drive unit for SB1900SL-PP . SB19 Drop ceiling discreet surveillance enclosure with black opaque lower dome with less than 1 f-stop light at- tenuation and all alu ...

  • Pelco SB1900 - page 17

    Pelco Manual C467M-D (5/95) 15 9.2 MODELS SB1900, SB1900-SL, SB1900-PP AND SB1900SL-PP CM7500 Series Coaxitron Matrix Switcher/Control System rack mount card cage with CPU and power supply . Capable of up to 64 inputs and up to 4 monitor outputs. (See C584 product specifi- cation sheet for details). CM8500 Series Matrix Switcher/Control System ca- ...

  • Pelco SB1900 - page 18

    16 Pelco Manual C467M-D (5/95) Pan Speed: 24 ° /sec ± 1 ° T ilt: -9 0 ° movement from horizontal plane T ilt Speed: 12 ° /sec ± .5 ° Maximum Load: 10 lbs (4.6 kg) Gearing: Chain drive Bearings: Pan Heavy duty ball bearing and Oilite bronze bushing T ilt Oilite bronze bushing Braking: Friction ELECTRICAL Input V oltage: 24 V AC required for p ...

  • Pelco SB1900 - page 19

    Pelco Manual C467M-D (5/95) 17 12.0 W ARRANTY AND RETURN INFORMA TION This equipment contains electrical or electronic components that must be recycled properly to comply with Directive 2002/96/EC of the European Union regarding the disposal of waste electrical and electronic equipment (WEEE). Contact your local dealer for procedures for recycling ...

  • Pelco SB1900 - page 20

    18 Pelco Manual C467M-D (5/95) Pelco 3500 Pelco Way • Clovis, CA 93612-5699 (559) 292-1981 • (800) 289-9100 FAX (800) 289-9150 or (559) 292-3827 International customers call 1-559-292-1981 or FAX 1-559-348-1120 (Product specifications subject to change without notice.) ...

メーカー Pelco カテゴリー Home Security System

Pelco SB1900のメーカーから受け取ることができるドキュメントは、いくつかのグループに分けられます。その一部は次の通りです:
- #BRANDの図面#
- SB1900の取扱説明書
- Pelcoの製品カード
- パンフレット
- またはPelco SB1900の消費電力シール
それらは全部重要ですが、デバイス使用の観点から最も重要な情報は、Pelco SB1900の取扱説明書に含まれています。

取扱説明書と呼ばれる文書のグループは、Pelco SB1900の取り付け説明書、サービスマニュアル、簡易説明書、またはPelco SB1900のユーザーマニュアル等、より具体的なカテゴリーに分類されます。ご必要に応じてドキュメントを検索しましょう。私たちのウェブサイトでは、Pelco SB1900の製品を使用するにあたって最も人気のある説明書を閲覧できます。

関連する取扱説明書

Pelco SB1900デバイスの取扱説明書はどのようなものですか?
取扱説明書は、ユーザーマニュアル又は単に「マニュアル」とも呼ばれ、ユーザーがPelco SB1900を使用するのを助ける技術的文書のことです。説明書は通常、全てのPelco SB1900ユーザーが容易に理解できる文章にて書かれており、その作成者はその分野の専門家です。

Pelcoの取扱説明書には、基本的な要素が記載されているはずです。その一部は、カバー/タイトルページ、著作権ページ等、比較的重要度の低いものです。ですが、その他の部分には、ユーザーにとって重要な情報が記載されているはずです。

1. Pelco SB1900の説明書の概要と使用方法。説明書にはまず、その閲覧方法に関する手引きが書かれているはずです。そこにははPelco SB1900の目次に関する情報やよくある質問、最も一般的な問題に関する情報を見つけられるはずです。つまり、それらはユーザーが取扱説明書に最も期待する情報なのです。
2. 目次。Pelco SB1900に関してこのドキュメントで見つけることができる全てのヒントの目次
3. Pelco SB1900デバイスの基本機能を使うにあたってのヒント。 Pelco SB1900のユーザーが使い始めるのを助けてくれるはずです。
4. トラブルシューティング。Pelco SB1900に関する最も重要な問題を診断し、解決するために役立つ体系化された手続き
5. FAQ。よくある質問
6. 連絡先。一人では問題を解決できない場合に、その国におけるPelco SB1900のメーカー/サービスへの連絡先に関する情報。

Pelco SB1900についてご質問がありますか?

次のフォームを使用してください

見つけた説明書を読んでもPelco SB1900の問題を解決できない場合、下記のフォームを使用して質問をしましょう。ユーザーのどなたかがPelco SB1900で同様の問題を抱えていた場合、その解決方法を共有したいと考えるかもしれません。

画像のテキストを入力してください

コメント (0)