Manual Pelco SB1900

20 pages 0.21 mb
Download

Go to site of 20

Summary
  • Pelco SB1900 - page 1

    SB19/SB1900 Series Discr eet Surveillance Enclosures Installation/Operation Manual C467M-D (5/95) ® Pelco • 3500 W. Pontiac Way, Clovis, CA 93612-5699 • USA • www.pelco.com (800) 289-9100 or (1-559) 292-1981 • FAX (800) 289-9150 or (1-559) 292-3827 ...

  • Pelco SB1900 - page 2

    REVISION HISTORY Manual # Date Comments C467M 2/90 Original Version. C467M 3/90 Rev. A. “Scope” section expanded to include warnings. Updated model and options section. Figure 5 Added. C467M 11/90 Rev. B. Addendum incorporated @ Figure 19 Exploded Assy Diagram. Wiring diagram changes added. Previous Figure 3 deleted; wiring table made up. C467M ...

  • Pelco SB1900 - page 3

    Pelco Manual C467M-D (5/95) 1 Please thoroughly familiarize yourself with the information in this manual prior to installation and operation. This symbol indicates that dangerous voltage constituting a risk of electric shock is present within this unit. CAUTION : TO REDUCE THE RISK OF ELECTRICAL SHOCK, DO NOT REMOVE COVER. NO USER-SERVICEABLE PARTS ...

  • Pelco SB1900 - page 4

    2 Pelco Manual C467M-D (5/95) 2.0 SCOPE The information contained within this manual covers the SB19/SB1900 Series of Discreet Surveillance En- closures. 3.0 DESCRIPTION The SB19 is a low profile, hemisphere, discreet sur- veillance dome for CCD type cameras designed for ease of installation, relocation, and servicing in hard ceiling applications o ...

  • Pelco SB1900 - page 5

    Pelco Manual C467M-D (5/95) 3 Figure 1. SB1900 Series Wiring Diagram ...

  • Pelco SB1900 - page 6

    4 Pelco Manual C467M-D (5/95) 4.3 MOUNTING INSTRUCTIONS Determine the type of mounting desired. The enclo- sure can be mounted in a hard ceiling, completely re- place a standard 2' x 2' suspended ceiling tile using the APSB19 optional faceplate, or be inserted through a cut-out in a standard 2' x 2' suspended ceiling tile. Handl ...

  • Pelco SB1900 - page 7

    Pelco Manual C467M-D (5/95) 5 7. Slide the back box through the ceiling tile and mounting plate and replace the four (4) 1/4-20 bolts and tighten to secure the back box to the mounting plate. 8. Check the alignment of the back box to the ceiling tile by attaching the 12.5" round faceplate trim to the bottom of the back box, aligning the two st ...

  • Pelco SB1900 - page 8

    6 Pelco Manual C467M-D (5/95) 13. Attach the dome to the pan/tilt by aligning the two ball studs protruding through the flange of the dome with the two holes in the dome attachment brack- ets and engaging the studs. 14. Attach the safety chain on the side of the back box to the short 4-40 threaded screw in the 12.5" round faceplate trim with t ...

  • Pelco SB1900 - page 9

    Pelco Manual C467M-D (5/95) 7 4.3.1.2 Suspended Ceiling Tile Replacement Mounting T o mount the enclosure into a suspended ceiling grid where the tile is replaced, perform the following steps. 1. Determine the location for mounting the enclosure and remove the appropriate ceiling tile. IMPORT ANT : When installing the enclo- sure in a 2' x 4&a ...

  • Pelco SB1900 - page 10

    8 Pelco Manual C467M-D (5/95) 12. Attach the safety chain on the side of the back box to the short 4-40 threaded screw in the 12.5" round faceplate trim with the provided hardware. 13. Attach the faceplate trim to the back box by align- ing the two serrated studs with two of the holes in the edges of the back box and engaging the studs. 14. Op ...

  • Pelco SB1900 - page 11

    Pelco Manual C467M-D (5/95) 9 12. Attach the faceplate trim to the back box by align- ing the two serrated studs with two of the holes in the edges of the back box and engaging the studs. 13. Operate the pan/tilt to verify that there are no ob- structions or dragging cables within the back box or dome. 4.4 CONNECTOR ASSEMBL Y T o install and test t ...

  • Pelco SB1900 - page 12

    10 Pelco Manual C467M-D (5/95) 5.0 CARE AND MAINTENANCE Regularly scheduled maintenance will prolong the op- erational life and appearance of the equipment. IMPORT ANT : The lower dome of the en- closure is an optical surface. When cleaning the inner surface of the dome and viewing window , treat as carefully as you would a fine camera lens. Do not ...

  • Pelco SB1900 - page 13

    Pelco Manual C467M-D (5/95) 11 6.0 EXPLODED ASSEMBL Y DIAGRAM Refer to Figure 7 for an exploded assembly diagram of the SB19 enclosure. Figure 7. SB19 Exploded Assembly Diagram PP ONL Y NON SL ONL Y * ** EXP ASB1900 EXP ASB1900PP ...

  • Pelco SB1900 - page 14

    12 Pelco Manual C467M-D (5/95) 7.0 EXPLODED ASSEMBL Y MECHANICAL PARTS LIST Item Qty Description Pelco Part Number 1 1 UL, Pad, camera, black .062" thick EH200010004 2 1 PCB assembly , pan/tilt PCB3000100ASSY 3 1 Bushing, 3/8" tilt shaft PT180010001 4 1 Shaft, tilt table PT18004002COMP 5 1 Sprocket .25" bore with pin and SS PT1800400 ...

  • Pelco SB1900 - page 15

    Pelco Manual C467M-D (5/95) 13 7.0 EXPLODED ASSEMBL Y MECHANICAL PARTS LIST (continued) Item Qty Description Pelco Part Number 48 Not used 49 Not used 50 Not used 51 1 Slip ring, 24 circuit for presets 250010000 52 Not used 53 Not used 54 Not used 55 1 Bracket, tilt pot PT18044012COMP 56 1 Bracket, LPP lens connector PT18044013COMP 57 1 Gear , 1.87 ...

  • Pelco SB1900 - page 16

    14 Pelco Manual C467M-D (5/95) 8.0 MODELS DD1900 Dome drive unit for SB1900. (UL) DD1900-PP Dome drive unit for SB1900-PP . DD1900-SL Dome drive unit for SB1900-SL. (UL) DD1900SL-PP Dome drive unit for SB1900SL-PP . SB19 Drop ceiling discreet surveillance enclosure with black opaque lower dome with less than 1 f-stop light at- tenuation and all alu ...

  • Pelco SB1900 - page 17

    Pelco Manual C467M-D (5/95) 15 9.2 MODELS SB1900, SB1900-SL, SB1900-PP AND SB1900SL-PP CM7500 Series Coaxitron Matrix Switcher/Control System rack mount card cage with CPU and power supply . Capable of up to 64 inputs and up to 4 monitor outputs. (See C584 product specifi- cation sheet for details). CM8500 Series Matrix Switcher/Control System ca- ...

  • Pelco SB1900 - page 18

    16 Pelco Manual C467M-D (5/95) Pan Speed: 24 ° /sec ± 1 ° T ilt: -9 0 ° movement from horizontal plane T ilt Speed: 12 ° /sec ± .5 ° Maximum Load: 10 lbs (4.6 kg) Gearing: Chain drive Bearings: Pan Heavy duty ball bearing and Oilite bronze bushing T ilt Oilite bronze bushing Braking: Friction ELECTRICAL Input V oltage: 24 V AC required for p ...

  • Pelco SB1900 - page 19

    Pelco Manual C467M-D (5/95) 17 12.0 W ARRANTY AND RETURN INFORMA TION This equipment contains electrical or electronic components that must be recycled properly to comply with Directive 2002/96/EC of the European Union regarding the disposal of waste electrical and electronic equipment (WEEE). Contact your local dealer for procedures for recycling ...

  • Pelco SB1900 - page 20

    18 Pelco Manual C467M-D (5/95) Pelco 3500 Pelco Way • Clovis, CA 93612-5699 (559) 292-1981 • (800) 289-9100 FAX (800) 289-9150 or (559) 292-3827 International customers call 1-559-292-1981 or FAX 1-559-348-1120 (Product specifications subject to change without notice.) ...

Manufacturer Pelco Category Home Security System

Documents that we receive from a manufacturer of a Pelco SB1900 can be divided into several groups. They are, among others:
- Pelco technical drawings
- SB1900 manuals
- Pelco product data sheets
- information booklets
- or energy labels Pelco SB1900
All of them are important, but the most important information from the point of view of use of the device are in the user manual Pelco SB1900.

A group of documents referred to as user manuals is also divided into more specific types, such as: Installation manuals Pelco SB1900, service manual, brief instructions and user manuals Pelco SB1900. Depending on your needs, you should look for the document you need. In our website you can view the most popular manual of the product Pelco SB1900.

Similar manuals

A complete manual for the device Pelco SB1900, how should it look like?
A manual, also referred to as a user manual, or simply "instructions" is a technical document designed to assist in the use Pelco SB1900 by users. Manuals are usually written by a technical writer, but in a language understandable to all users of Pelco SB1900.

A complete Pelco manual, should contain several basic components. Some of them are less important, such as: cover / title page or copyright page. However, the remaining part should provide us with information that is important from the point of view of the user.

1. Preface and tips on how to use the manual Pelco SB1900 - At the beginning of each manual we should find clues about how to use the guidelines. It should include information about the location of the Contents of the Pelco SB1900, FAQ or common problems, i.e. places that are most often searched by users in each manual
2. Contents - index of all tips concerning the Pelco SB1900, that we can find in the current document
3. Tips how to use the basic functions of the device Pelco SB1900 - which should help us in our first steps of using Pelco SB1900
4. Troubleshooting - systematic sequence of activities that will help us diagnose and subsequently solve the most important problems with Pelco SB1900
5. FAQ - Frequently Asked Questions
6. Contact detailsInformation about where to look for contact to the manufacturer/service of Pelco SB1900 in a specific country, if it was not possible to solve the problem on our own.

Do you have a question concerning Pelco SB1900?

Use the form below

If you did not solve your problem by using a manual Pelco SB1900, ask a question using the form below. If a user had a similar problem with Pelco SB1900 it is likely that he will want to share the way to solve it.

Copy the text from the picture

Comments (0)