Manual New Buck Corporation 261

53 pages 1.7 mb
Download

Go to site of 53

Summary
  • New Buck Corporation 261 - page 1

    MODEL 261 NON-CA T AL YTIC UNIT FEATURES PREPARATIONS INSTALLATION OPERATION MAINTENANCE SAFETY SAFETY NOTICE IF THIS HEATER IS NOT PROPERLY IN STALLED, A HOUSE FIRE MAY RESULT . FOR YOUR SAFETY, FOLLOW THE INSTALL ATION INSTRUCTIONS. CONTACT THE AUTHORITY H AVE JURISDICTION ( SUCH AS MUNICIPAL BUILDING DEPARTMENT, FIRE DEPA RTMENT, FIRE PREVENTION ...

  • New Buck Corporation 261 - page 2

    ...

  • New Buck Corporation 261 - page 3

    T ABLE OF CONTENTS Important Instructions ……………………………………………………………………...…...2 SECTION I: Introduction………………………………………………………………………..3 Cautions…………………………………………………………………………………………. ...

  • New Buck Corporation 261 - page 4

    INST ALLA TION, OPERA TION, AND MAINTENANCE INSTRUCTIONS MODELS 261 READ THIS FIRST IMPOR T ANT INSTRUCTIONS W ARNING THESE UNITS GENERATE A LOT OF HE AT, SO TREAT THEM WITH CARE. HOT WHILE IN OPERATION! KEEP CHILDREN, CLOTHING AND FURNITURE AWAY. CONTACT MAY CAUSE S KIN BURNS. READ ALL INSTRUCTIONS BEFORE INSTALLING AND USING THE APPLIANCE. FAILUR ...

  • New Buck Corporation 261 - page 5

    CAUTION YOUR CHIMNEY OR FLUE MUST BE CO RRECTLY SIZED. A CHIMNEY OR FLUE THAT IS TOO SMALL OR LARGE IN DIAMETER, OR TOO SHORT, CAN CAUSE YOUR STOVE TO SPILL SMOKE WHEN THE DOOR IS OPENED. SECTION I INTRODUCTION Your new MODEL 261 is a non-catalytic unit de signed to meet the most stringent emissions standards without the use of a catalytic combusto ...

  • New Buck Corporation 261 - page 6

    POSSIBLE TOOLS NEEDED FOR INST ALLA TION If you decide to install your own stove, there are several hand tools you may need to do the job. If you do not already have them, they are r eadily available at mo st hardware stores. Caulking gun Large adjustable wrench (may not be needed) Drop cloths or newspapers Vacuum cleaner or whisk broom Flashlight ...

  • New Buck Corporation 261 - page 7

    CAUTION THE UNIT IS PAINTED WITH A SPECIALLY FORMULATED HIGH TEMPERATURE PAINT THAT CURE S DURING THE FIRST TWO OR THREE FIRINGS. YOU MAY NOTICE A SLIGHT SMOKING EFFECT AND AN ODOR OF BURNING PAINT WHEN YOU BUILD THE FIRST FIRES. THIS IS NORMAL AND IS NOT A CA USE FOR ALARM. IN SOME CASES, THESE FUM ES WILL ACTIVATE A SMOKE ALARM. OPENING A WINDOW ...

  • New Buck Corporation 261 - page 8

    SECTION II RESIDENTIAL FREEST ANDING VER TICAL EXIT INST ALLA TION For optional vertical exit insta llation locations r e fer back to table of contents Section II MINIMUM CLEARANCES T O FLOOR AND COMBUSTIBLES See minimum floor protector measurements ,and also for m i nimum clearances to combustibles, See Pages, and Figures below A. Vertical Exit Si ...

  • New Buck Corporation 261 - page 9

    Select an installation location that will gi ve t he best airflow from the front of t he heater to the remainder of the home. PREP ARING THE ST OVE FOR INST ALLA TION 1. Inspect the unit for any obvious physical damage. 2. Plug the power cord into a 115V A C outlet to test th e motor and fan when optional m otor is being used. “Do not run power c ...

  • New Buck Corporation 261 - page 10

    PREP ARING THE ROOM HEA TER LOCA TION 1. Select an installation location that will give th e best airflow from the front of the heater to the remainder of the home. 2. Place the protective floor pad in position. 3. Place the unit on the pad making sure the mi nimum clearance specifications are met. 4. If connecting to an existing masonry flue, fi r ...

  • New Buck Corporation 261 - page 11

    A. V ertical exit using (6" Single W all pipe minimum 24 ga. blued or black pipe and any listed 2100° UL 103 HT . TYPE Chimney). W ith standard close clearanc e shield and pipe shield. Model 261 minimum cleara nce to combustibles. NOTE: All clearances are to combustibles with low cl earance shields, and using single wall pipe and minimum floo ...

  • New Buck Corporation 261 - page 12

    HOW TO LOCA TE CHIMNEY EXIT , AND INST ALL B. Vertical Exit using (6" DVL Close Clearan ce pipe, or Shielded Single wall pipe, and any Listed 2100° UL 103 HT chimney). W ith standard close clearance shield and pipe shield. NOTE: For minimum cleara nces (See Page 11, Figure 5). 1. Suspend a plumb bob from the ceiling above th e unit so that th ...

  • New Buck Corporation 261 - page 13

    B. V ertical exit using (6" DVL Cl ose Clearance pipe or Shielded Single wall pipe, and any listed 2100° UL 103 HT . TYPE Chimney). W ith standard close clearanc e shield and pipe shield. Model 261 minimum cleara nce to combustibles. NOTE: All clearances are to combus tibles with all low clearance shields and double wall pipe or shielded sing ...

  • New Buck Corporation 261 - page 14

    HOW TO LOCA TE CHIMNEY EXIT , AND INST ALL C. Vertical Wall Exit using (6" Single Wal l pipe minimum 24 ga. blued or black w i th elbow, and any Listed 2100° UL HT chimney and Listed 2100° UL HT T-Box assembly). With standard close clearance shield and pipe shie ld NOTE: For minimum cleara nces (See Page 13, Figure 7). 1. Mark the plumb line ...

  • New Buck Corporation 261 - page 15

    NEW BUCK CAST COLLAR P art # MA6CHIMC NB C. V ertical wall exit using (6" Single W all Pipe minimum 24 ga. blued or black pipe and elbow pipe, and any listed 2100° UL 103 HT . TYPE Chimney and Listed 2100° UL HT T -Box assembly ). W i th standard close clearance shield and pipe shield. Model 261 minimum cleara nce to combustibles. C C C C NO ...

  • New Buck Corporation 261 - page 16

    HOW TO LOCA TE CHIMNEY EXIT , AND INST ALL D. Vertical Wall Exit using (6" DVL Close Cl earance Pipe and Elbow, and any Listed 2100° UL HT chimney and Listed 2100° UL HT T-Box assembly). With standard close clearance shield and pipe shield NOTE: For minimum cleara nces (See Page 15, Figure 9). 1. Mark the plumb line on the wall directly behi ...

  • New Buck Corporation 261 - page 17

    Figure 9. D. V ertical wall exit using (6" DVL Close Clearance pipe with elbow) , and any listed 2100° UL 103 HT . TYPE Chimney). With standard close clearance shield and pipe shield. Model 261 minimum cleara nce to combustibles. IN SIDE WALL Figure 10 . CEILING WALL PASS- THROUGH CONNECT OR LISTED 2100° UL 103 HT TYPE CHIMNEY REEFER TO MANU ...

  • New Buck Corporation 261 - page 18

    HOW TO LOCA TE CHIMNEY EXIT , AND INST ALL E. Vertical exit into masonry flue using (6" Single Wall pipe minimum 24 ga. blued or black pipe with Elbow). With standard close clearance shield and pipe shield. NOTE: For minimum clearances (See Page 17, Figure 11). 1. Before connecting these units to a masonry chimney, determine that the masonry f ...

  • New Buck Corporation 261 - page 19

    E. V ertical exit into masonry flue using (6" Single W all pipe minimum 24 ga blued or black pipe with elbow) W i th standard close clearance shield and pipe shield . Model 261 minimum cleara nce to combustibles. Figure 11. MASONRY C HIMNEY CLEAN OUT DOOR MASONRY FLUE LINERS CEILING MASONRY CHIM NEY Figure 12. SINGLE WALL CONNECTOR ELBOW PIPE ...

  • New Buck Corporation 261 - page 20

    HOW TO LOCA TE CHIMNEY EXIT , AND INST ALL F. Vertical exit into masonry flue using (6" DVL Close Clearance pipe with Elbow). With standard close clearance shield and pipe shield. NOTE: For minimum clearances (See Page 19, Figure 13). 1. Before connecting these units to a masonry chimney, determ ine that the masonry flue pass- through connecto ...

  • New Buck Corporation 261 - page 21

    F . V ertical exit using (6" DVL Close Clearance pipe with Elbow) into masonry flue. W i th standard close clearanc e shield and pipe shie ld. Model 261 minimum clearance to combustibles. MASONRY C HIMNEY CLEAN OUT DOOR MASONRY FLUE LINERS CEILING MASONRY CHIM NEY Figure 14. DVL CLOSE CLEARANCE PIPE Figure 13. C C C C BACK WALL A E B F D G A E ...

  • New Buck Corporation 261 - page 22

    SECTION III RESIDENTIAL FREEST ANDING REAR EXIT INST ALLA TION For optional r ear exit install ation locations r efer back to table of contents Section III MINIMUM CLEARANCES T O FLOOR AND COMBUSTIBLES See minimum floor protector measurements ,and also for m i nimum clearances to combustibles, (Pages, and Figures below) A. Rear Exit Into Masonry Fl ...

  • New Buck Corporation 261 - page 23

    Select an installation location that will gi ve t he best airflow from the front of t he heater to the remainder of the home. PREP ARING THE ST OVE FOR INST ALLA TION 1. Inspect the unit for any obvious physical damage. 2. Plug the power cord into a 115V A C outlet to test th e motor and fan when optional m otor is being used. “Do not run power c ...

  • New Buck Corporation 261 - page 24

    PREP ARING THE ROOM HEA TER LOCA TION 1. Select an installation location that will give th e best airflow from the front of the heater to the remainder of the home. 2. Place the protective floor pad in position. 3. Place the unit on the pad making sure the mi nimum clearance specifications are met. 4. If connecting to an existing masonry flue, fi r ...

  • New Buck Corporation 261 - page 25

    Figure 18. MASONRY CHIM NEY CLEAN OUT DOOR MASONRY FLUE LINERS 8" Figure 17. A. Rear exit into Masonry Flue using (6" Single W all pipe minimum 24 ga blued or black pipe). W i th standard close clearance shield and pipe shield. Model 261 minimum clea rance to combustibles . C C C C BACK WALL A E B F D G A E B F BACK WALL SIDE WALL PROTECT ...

  • New Buck Corporation 261 - page 26

    HOW TO LOCA TE CHIMNEY EXIT , AND INST ALL B. Rear exit into Masonry Flue (6" Using DVL Close Clearance Pipe). With standard close cl earance shield and pipe shiel d. NOTE: For minimum clearances (See Page 25, Figure 19). 1. Before connecting these units to a masonry chimney, determine that the masonry flue pass-through connector thimble meets ...

  • New Buck Corporation 261 - page 27

    C C C C Figure 20. MASONRY CHIM NEY CLEAN OUT DOOR MASONRY FLUE LINERS 8" Figure 19. B. Rear exit into Masonry Fl ue using (6" DVL Close Clearance pipe). W i th standard close clearance shield and pipe shield. Model 261 minimum cleara nce to combustibles. BACK WALL A E B F D G A E B F BACK WALL SIDE WALL PROTECTOR D A B C D E F G MODEL 26 ...

  • New Buck Corporation 261 - page 28

    HOW TO LOCA TE CHIMNEY EXIT , AND INST ALL C. Rear Exit to Vertical then to Horizontal into Masonry Flue using (6" DVL Close Clearance pipe and Elbow’s). With standard close clearance shield and pipe shield. NOTE: For minimum cleara nces (See Page 27, Figure 21). Before connecting these units to a masonry ch imney, determine that the m asonr ...

  • New Buck Corporation 261 - page 29

    MASONRY C HIMNEY CLEAN OUT DOOR MASONRY FLUE DVL CLOSE CLEARANCE PIPE 8" CEILING MASONRY CHIM NEY Page 25. Figure 22. C. Rear exit V ertical then to Horizontal into Mason r y Flue using (6" DVL Close Clearance pipe ,and Elbows) . W i th standard close clearance shield and pipe shield. Model 261 minimum clea rance to combustibles NOTE: All ...

  • New Buck Corporation 261 - page 30

    D. Rear exit into Masonry Firepl ace using (6" Single W a ll pipe, minimum 24 ga. blued or black pipe) . W i th standard close clearanc e shield and pipe shield NOTE: For minimum cl earances (See Figur e 23). INST ALLA TION PREP ARA TION 1. Locate furniture and other materials away fr om the front of the fireplace to allow free access to the f ...

  • New Buck Corporation 261 - page 31

    D. Rear exit in to Masonry Fir eplace using (6" single wall pipe, minimum 24 ga. blued or black) . W i th standard close clearance shield and pipe shield SEALING PLATE HEARTH SINGLE WALL PIPE WITH 2" LEGS, THE TOP OF THE REAR EXIT ON THE STOVE IS BELOW 24" FROM FLOOR OR HEARTH ENABLING TO INSERT PIPE INTO MOST MASONRY FIREPLACE NOTE: ...

  • New Buck Corporation 261 - page 32

    SECTION IV Alcove Installation V ertical or Horizontal Exit For optional V ertical exi t or Horizo ntal exit installation locations r efer back to table of contents Section IV MINIMUM CLEARANCES T O FLOOR AND COMBUSTIBLES See minimum floor protector measurements, and also for m inimum clearances to combustibles A. vertical exit (Page 33, Figure 27 ...

  • New Buck Corporation 261 - page 33

    Select an installation location that will gi ve t he best airflow from the front of t he heater to the remainder of the home. PREP ARING THE ST OVE FOR INST ALLA TION 1. Inspect the unit for any obvious physical damage. 2. Plug the power cord into a 115V A C outlet to test th e motor and fan when optional m otor is being used. “Do not run power c ...

  • New Buck Corporation 261 - page 34

    A-1. V ertical Exit Installation HOW TO LOCA TE CHIMNEY EXIT , AND INST ALL A-1. Vertical Exit using (6" DVL Close Clearan ce pipe, or Shielded Single wall pipe, and any Listed 2100° UL 103 HT chimney). W ith standard close clearance shield and p i pe shield. NOTE: For minimum clearances (See Page 33, F igure 27). 1. Suspend a plumb bob from ...

  • New Buck Corporation 261 - page 35

    ALCOVE INST ALLA TION AND CLEARANCES A-1. Alcove V ertical exit using (6" DVL Close Clearance pipe, and any listed 2100° UL 103 HT . TYPE Chimney). W ith standard close clearanc e shield and pipe shield. Model 261 minimum cleara nce to combustibles. Figure 27 NOTE: All clearances are to combus tibles with all low clearance shields and double ...

  • New Buck Corporation 261 - page 36

    A-2. V ertical Exit Installation HOW TO LOCA TE CHIMNEY EXIT , AND INST ALL A-2. Vertical Wall Exit using (6" DVL Cl ose Clearance Pipe and Elbow and any Listed 2100° UL HT chimney, and Listed 2100° UL HT T-Box assembly). With standard close cl earanc e shield and pipe shield NOTE: For minimum clearances (See Page 35, Figure 29). 1. Mark the ...

  • New Buck Corporation 261 - page 37

    NOTE: All clearances are to co mbustibles with all low clea rance shields and double wall pipe , and minimum floor protector. NOTE: Floor protector must extend length of horizontal flue pipe to wall. NOTE: Model 261 com es standard with low clearance shields. BACK WALL SIDE WALL A E B F D G Figure 29 IN SIDE WALL Figure 30 . CEILING WALL PASS- THRO ...

  • New Buck Corporation 261 - page 38

    B-1. Rear Exit Installation HOW TO LOCA TE CHIMNEY EXIT , AND INST ALL B-1. Vertical Rear Exit using (6" DVL Close Clearance Pipe and any Listed 2100° UL HT chimney, and Listed 2100° UL HT T-Box assembly). With standard close cl earanc e shield and pipe shield NOTE: For minimum clearances (See Page 37, Figure 31). 1. Measure up so there will ...

  • New Buck Corporation 261 - page 39

    NOTE: All clearances are to co mbustibles with all low clea rance shields and double wall pipe , and minimum floor protector. NOTE: Floor protector must extend length of horizontal flue pipe to wall. NOTE: Model 261 com es standard with low clearance shields. A B D E F G H I MODEL 261 14" 4" 16" 8" 3” 47" 10" 84" ...

  • New Buck Corporation 261 - page 40

    FINAL CHECK 1. Recheck the specified clearances. 2. Remove all foreign mate rial from the firebox area. 3. Open the primary air draft. 4. Plug the power cord into a 115V AC outlet when using with optional motor. 5. Place crumpled pieces of newspaper in the stove. Light it and close the doors. Ensure that the stove draws pr operly through the primar ...

  • New Buck Corporation 261 - page 41

    SECTION V FREEST ANDING MOBILE HOME INST ALLA TION MINIMUM CLEARANCES T O FLOOR AND COMBUSTIBLES See minimum floor protector measurements, and also for m inimum clearances to combustibles (See Page 42, Figure 35). Floor Protection: When installing freestanding heater, a floor protect or must be use. Floor protection must be 3/8” minimum thickness ...

  • New Buck Corporation 261 - page 42

    Select an installation location that will gi ve t he best airflow from the front of t he heater to the remainder of the home. PREP ARING THE ST OVE FOR INST ALLA TION 1. Inspect the unit for any obvious physical damage. 2. Plug the power cord into a 115V A C outlet to test th e motor and fan when optional m otor is being used. “Do not run power c ...

  • New Buck Corporation 261 - page 43

    FREEST ANDING MOBILE HOM E INST ALLA TION PREP ARING THE ROOM HEA TER LOCA TION 1. Select an installation location that will give the best airflow from the front of the heater to the remainder of the home. (See Page 42 Figure 35 m ini mum clearances to combustibles). CAUTION THE STRUCTURAL INTEGRITY OF TH E MOBILE HOME FLOOR MUST BE MAINTAINED. (MO ...

  • New Buck Corporation 261 - page 44

    NOTE: All clearances are to combus tibles with all low clearance shields and double wall pipe or shielded single wall pip eand minimum floor protector. NOTE: Model 261 comes standard with low clearance shields. A B C D E F G MODEL 261 14” 4" 14" 7" 8" 3" 16" V ertical exit using (6" DVL Cl ose Clearance pipe, an ...

  • New Buck Corporation 261 - page 45

    Take measurements from bottom of heater, and use them to locate the opening for the out side air duct, place th em onto protective pad. HOW TO LOCA TE CHIMNEY EXIT , AND INST ALL Ceiling Exit (Using Close Clearance listed chimney) 1. Suspend a plumb bob from the ceiling above the unit so that the weight is hanging in the center of the flue exit. ( ...

  • New Buck Corporation 261 - page 46

    DVL CLOSE CLEARANCE PIPE CEILING SUPPORT BO X CEILING NEW BUCK CONTEMPORARY CAP Figure 4. ROOF Figure 39. BUCK STOVE 2. After locating the center of the hole install the ceiling supp ort box, chim ney, flashing and rain cap using listed chimney only. Only use pipe listed in this manual. CAUTION REFER TO CHIMNEY MANUFACTUR ER’S INSTRUCTIONS FOR AS ...

  • New Buck Corporation 261 - page 47

    FINAL CHECK 1. Recheck the specified clearances. 2. Remove all foreign mate rial from the firebox area. 3. Open the primary air draft. 4. Plug the power cord into a 115V AC outlet when using with optional motor. 5. Place crum pled pieces of newspaper in the stove . Light it and close the doors. Ensure that the stove draws properly th rough the prim ...

  • New Buck Corporation 261 - page 48

    SECTION VI WOOD HEA TER SAFETY Certain safety hazards are inhe rent in any wood heater installa tion. You should be aware of these so that a safe and proper installation can be made. 1. FAULTY CHIMNEY: An older masonry chim ney should be thoroughly checked to be sure there are no holes or weak spots which coul d allow sparks or hot gases to escape. ...

  • New Buck Corporation 261 - page 49

    SECTION VII OPERA TION This section of the manual is to help you ge t the maximum efficiency and maximum smoke (particulate) reduction from your heater. If you should experience any difficulty or have any questions concer ning your heater, contact your dealer for assistance. The manufacturer recommends th at for m aximum performance burn seasoned h ...

  • New Buck Corporation 261 - page 50

    SECTION VIII TROUBLESHOOTING PROBLEM POSSIBLE CAUSE SOLUTION 1. Sluggish Heater 1. Obstruction in Chimney 2. Improperly sealed trim kit or direct connect kit 3. Manual damper in chimney is closed 4. Wet or unseasoned wood being burned 5. Poor chimney draft 1. Check for and remove obstruction 2. (a) Check trim kit gasketing seal to fireplace and gas ...

  • New Buck Corporation 261 - page 51

    2. High fuel consumption 3. Backpuffing 4. Smoke rollout when heater door is opened 1. (a) Close inlet air control as much as possible to maintain desired heat output. (b) Check gaskets, reinstall fiberglass gasketing round doors and glass as necessary 2. Check door gasket, check adjustment of door latch 1. (a) Smoke shelf in chimney is filled with ...

  • New Buck Corporation 261 - page 52

    NEW BUCK CORPORA TION (NBC) "LIMITED W ARRANTY" FOR THE BUCK ST OVE PLEASE READ THIS W ARRANTY CAREFULL Y PRODUCTS COVERED This warranty covers the New Buck Stove h eating unit, so long as it is owned by the original purchaser, including optional and standard accessories purchased at the same tim e, subject to terms, limitations, and cond ...

  • New Buck Corporation 261 - page 53

    If for any reason you are dissatisfied with the suggested procedures, you may contact us in writing at: New Buck Corporation Customer Service Department P. O. Box 69 Spruce Pine, NC 28777 CONDITIONS AND EXCLUSIONS A. Replacement of parts may be in the f orm of new or fully reconditioned parts, at NBC's option. B There is no other express warra ...

Manufacturer New Buck Corporation Category Stove

Documents that we receive from a manufacturer of a New Buck Corporation 261 can be divided into several groups. They are, among others:
- New Buck Corporation technical drawings
- 261 manuals
- New Buck Corporation product data sheets
- information booklets
- or energy labels New Buck Corporation 261
All of them are important, but the most important information from the point of view of use of the device are in the user manual New Buck Corporation 261.

A group of documents referred to as user manuals is also divided into more specific types, such as: Installation manuals New Buck Corporation 261, service manual, brief instructions and user manuals New Buck Corporation 261. Depending on your needs, you should look for the document you need. In our website you can view the most popular manual of the product New Buck Corporation 261.

A complete manual for the device New Buck Corporation 261, how should it look like?
A manual, also referred to as a user manual, or simply "instructions" is a technical document designed to assist in the use New Buck Corporation 261 by users. Manuals are usually written by a technical writer, but in a language understandable to all users of New Buck Corporation 261.

A complete New Buck Corporation manual, should contain several basic components. Some of them are less important, such as: cover / title page or copyright page. However, the remaining part should provide us with information that is important from the point of view of the user.

1. Preface and tips on how to use the manual New Buck Corporation 261 - At the beginning of each manual we should find clues about how to use the guidelines. It should include information about the location of the Contents of the New Buck Corporation 261, FAQ or common problems, i.e. places that are most often searched by users in each manual
2. Contents - index of all tips concerning the New Buck Corporation 261, that we can find in the current document
3. Tips how to use the basic functions of the device New Buck Corporation 261 - which should help us in our first steps of using New Buck Corporation 261
4. Troubleshooting - systematic sequence of activities that will help us diagnose and subsequently solve the most important problems with New Buck Corporation 261
5. FAQ - Frequently Asked Questions
6. Contact detailsInformation about where to look for contact to the manufacturer/service of New Buck Corporation 261 in a specific country, if it was not possible to solve the problem on our own.

Do you have a question concerning New Buck Corporation 261?

Use the form below

If you did not solve your problem by using a manual New Buck Corporation 261, ask a question using the form below. If a user had a similar problem with New Buck Corporation 261 it is likely that he will want to share the way to solve it.

Copy the text from the picture

Comments (0)