    506271-01 Page 1 of 14 Issue 0921 Save these instructions for future reference INST ALLA TION INSTRUCTIONS RPGE/RGE Series Gas Heating/Electric Cooling Package Unit Do not store combustible materials, including gasoline and other flammable vapors and liquids, near the furnace, vent pipe, or warm air ducts. Such actions could cause property damage, ...

  • Allied Air Enterprises 506271-01 - page 2

    Page 2 of 14 506271-01 Issue 0921 INST ALLA TION T hese instructions must be hung on or near the furnace in a conspicuous place. These furnace units are single package air conditioners with gas heat designed for outdoor installation on a roof top or a slab. The units are completely assembled. All piping, refrigerant charge, and electrical wiring ar ...

  • Allied Air Enterprises 506271-01 - page 3

    506271-01 Page 3 of 14 Issue 0921 In the U.S., units may be installed on combustible floors made from wood or class A, B, or C roof covering material. In Canada, units may be installed on combustible floors. Units must be installed out doors. Service Access Access to all serviceable components is provided by four removable panels: blower comp artme ...

  • Allied Air Enterprises 506271-01 - page 4

    Page 4 of 14 506271-01 Issue 0921 Minimum horizontal clearance of 4' from electric meters, gas meters, regulator , and relief equipment is required. In addition to the above requirements, consideration must be given to prevent unwanted ice buildup from the vent condensate. The vent should not be located on the side of a building where the prev ...

  • Allied Air Enterprises 506271-01 - page 5

    506271-01 Page 5 of 14 Issue 0921 The supply and return air duct systems should be designed for the CFM and static requirement s of the job. They should not be sized by matching the dimensions of the duct connections on the unit. Filters Filters are not supplied with the unit. Filters must always be installed ahead of the evaporator coil and must b ...

  • Allied Air Enterprises 506271-01 - page 6

    Page 6 of 14 506271-01 Issue 0921 Gas piping recommendations: • A drip leg and a ground joint union must be installed in the gas piping. A ground joint union is recommended by the manifold/valve. • When required by local codes, a manual shutoff valve may have to be installed outside of the unit. • Use pipe thread sealing compound resistant to ...

  • Allied Air Enterprises 506271-01 - page 7

    506271-01 Page 7 of 14 Issue 0921 All wiring should be done in accordance with the National Electrical Code, ANSI/NFP A No. 70 (latest edition); Canadian Electrical Code Part 1, CSA C22.1 (latest edition); or local codes where they prevail. Use wiring with a temperature limitation of 75°C minimum. Run the 208 or 230 volt, 60 hertz electric power s ...

  • Allied Air Enterprises 506271-01 - page 8

    Page 8 of 14 506271-01 Issue 0921 ST ART -UP Pre-St art Check List Complete the following checks before starting the unit: 1. Check the type of gas being supplied. Be sure it is the same as listed on the unit nameplate. 2 . Make sure that the vent cover has been properly installed. For Y our Safety Read Before Lighting T o Light Main Burners: 1. T ...

  • Allied Air Enterprises 506271-01 - page 9

    506271-01 Page 9 of 14 Issue 0921 Manifold Gas Pressure Adjustment Regulator – Natural Gas For purpose of input adjustment, the minimum permissible gas supply pressure is 5" w .c. for natural gas. Gas input must never exceed the input capacity shown on the rating plate. The furnace is equipped for natural gas rated input s with manifold pres ...

  • Allied Air Enterprises 506271-01 - page 10

    Page 10 of 14 506271-01 Issue 0921 7. After reassembly of all p arts is complete and all wires are reconnected, open the main manual gas shutoff valve; check for and correct any gas leaks. T urn electrical power on, initiate a call for heat, and check for proper burner operation. 8. Install burner access panel. Heat Anticipator The heat anticipator ...

  • Allied Air Enterprises 506271-01 - page 11

    506271-01 Page 11 of 14 Issue 0921 10-second interval, then the ignition control will de- energize the gas valve. 6. The ignition control is designed to repeat this “trial for ignition” a total of three times. If, at the end of the third trial, flame still has not been established, then the ignition control will try to light again 1 hour later ...

  • Allied Air Enterprises 506271-01 - page 12

    Page 12 of 14 506271-01 Issue 0921 Burners T o clean the burners, first remove them from the furnace as explained in Burner Instructions on page 9. V acuum and/or brush as required. V ent Outlet Visually inspect vent outlet periodically to make sure that there is no buildup of soot or dirt. If necessary , clean to maintain adequate opening to disch ...

  • Allied Air Enterprises 506271-01 - page 13

    506271-01 Page 13 of 14 Issue 0921 Wiring Diagram – Single Phase Figure 8 ...

  • Allied Air Enterprises 506271-01 - page 14

    Page 14 of 14 506271-01 Issue 0921 NOTES ...

Производитель Allied Air Enterprises Категория Gas Heater

Документы, которые мы получаем от производителя устройства Allied Air Enterprises 506271-01 мы можем разделить на несколько групп. Это в частности:
- технические чертежи Allied Air Enterprises
- инструкции обслуживания 506271-01
- паспорта изделия Allied Air Enterprises
- информационные брошюры
- энергетические этикетки Allied Air Enterprises 506271-01
Все из них важны, однако самую важную информацию с точки зрения пользователя мы найдем в инструкции обслуживания Allied Air Enterprises 506271-01.

Группа документов, определяемая как инструкции обслуживания, делится также на более подробные типы, такие как: Инструкции монтажа Allied Air Enterprises 506271-01, инструкции обслуживания, короткие инструкции или инструкции пользователя Allied Air Enterprises 506271-01. В зависимости от потребностей, Вам необходимо поискать требуемый документ. На нашем сайте Вы можете просмотреть самую популярную инструкцию использования изделия Allied Air Enterprises 506271-01.

Похожие инструкции обслуживания

Полная инструкция обслуживания устройства Allied Air Enterprises 506271-01, как должна выглядеть?
Инструкция обслуживания, определяемая также как пособие пользователя, или просто "руководство" - это технический документ, цель которого заключается в использовании Allied Air Enterprises 506271-01 пользователями. Инструкции пишет, как правило технический писатель, языком, доступным для всех пользователей Allied Air Enterprises 506271-01.

Полная инструкция обслуживания Allied Air Enterprises, должна заключать несколько основных элементов. Часть из них менее важная, как например: обложка / титульный лист или авторские страницы. Однако остальная часть, должна дать нам важную с точки зрения пользователя информацию.

1. Вступление и рекомендации, как пользоваться инструкцией Allied Air Enterprises 506271-01 - В начале каждой инструкции, необходимо найти указания, как пользоваться данным пособием. Здесь должна находится информация, касающаяся местонахождения содержания Allied Air Enterprises 506271-01, FAQ и самых распространенных проблем - то есть мест, которые чаще всего ищут пользователи в каждой инструкции обслуживания
2. Содержание - индекс всех советов, касающихся Allied Air Enterprises 506271-01, которое найдем в данном документе
3. Советы по использованию основных функций устройства Allied Air Enterprises 506271-01 - которые должны облегчить нам первые шаги во время использования Allied Air Enterprises 506271-01
4. Troubleshooting - систематизированный ряд действия, который поможет нам диагностировать а в дальнейшем очередность решения важнейших проблем Allied Air Enterprises 506271-01
5. FAQ - чаще всего задаваемые вопросы
6. Контактные данные Информация о том, где искать контактные данные производителя / сервисного центра Allied Air Enterprises 506271-01 в данной стране, если самостоятельно не получится решить проблему.

У вас вопрос, касающийся Allied Air Enterprises 506271-01?

Воспользуйтесь формуляром, находящимся ниже

Если с помощью найденной инструкции Вы не решили свою проблему с Allied Air Enterprises 506271-01, задайте вопрос, заполнив следующий формуляр. Если у какого то из пользователей была похожая проблема с Allied Air Enterprises 506271-01 со всей вероятностью он захочет поделиться методом ее решения.

Перепишите текст с картинки

Комментарии (0)