Manual de instrucciones Allied Air Enterprises 4PGE

16 de páginas 0.46 mb
Descargar

Pasar a la página of 16

Summary
  • Allied Air Enterprises 4PGE - page 1

    506488-01 Page 1 Issue 1008 T ABLE OF CONTENTS SAFETY ............................................................... 2 INST ALLA TION .................................................... 2 ST AR T -UP .......................................................... 10 OPERA TION ...................................................... 1 1 MAINTENANCE .... ...

  • Allied Air Enterprises 4PGE - page 2

    Page 2 506488-01 Issue 1008 INST ALLA TION These instructions must be hung on or near the furnace in a conspicuous place. These units are single p ackage air conditioners with gas heat designed for outdoor inst allation on a rooftop or a slab. The units are completely assembled. All piping, refrigerant charge, and electrical wiring are factory inst ...

  • Allied Air Enterprises 4PGE - page 3

    506488-01 Page 3 Issue 1008 Location Use the following guidelines to select a suitable location for the unit. 1. Unit is designed for outdoor installation only . Unit must be installed so all electrical component s are protected from water . 2. Condenser coils must have an unlimited supply of air . 3. For ground level installation, use a level pref ...

  • Allied Air Enterprises 4PGE - page 4

    Page 4 506488-01 Issue 1008 Roof Curb Inst allation If a roof curb is used, follow the manufacturer ’s Inst allation Instructions and be sure that all required clearances are observed (see following Clearances section). Clearances All units require certain clearances for proper operation and service. Refer to T able 1 for the minimum clearances t ...

  • Allied Air Enterprises 4PGE - page 5

    506488-01 Page 5 Issue 1008 a sidewalk, patio, or other walkway where the condensate could cause the surface to become slippery . The products of combustion must not be allowed to accumulate within a confined space and recirculate. V ent Hood The unit is shipped with the vent hood, screen, and sheet metal screws packed in the plastic bag cont ainin ...

  • Allied Air Enterprises 4PGE - page 6

    Page 6 506488-01 Issue 1008 Condensate Drain The PGE/SG package unit is equipped with a 3/4" FPT coupling for condensate line connection. Plumbing must conform to local codes. Use a sealing compound on male pipe threads. The condensate drain line must be properly trapped and routed to a suitable drain. See Figure 5 for proper drain arrangement ...

  • Allied Air Enterprises 4PGE - page 7

    506488-01 Page 7 Issue 1008 The gas supply line should be routed through the grommet on the side of the unit. Refer to Figure 7 to locate this access opening. If local codes allow the use of a flexible gas appliance connector , always use a new listed connector . Do not use a connector which has previously serviced another gas appliance. The furnac ...

  • Allied Air Enterprises 4PGE - page 8

    Page 8 506488-01 Issue 1008 Check all connections for leaks when piping is completed, using a soapy solution. Some soaps used for leak detection are corrosive to cert ain metals. Carefully rinse piping thoroughly after completing leak detection. Electrical Wiring All wiring should be done in accordance with the National Electrical Code, ANSI/NFP A ...

  • Allied Air Enterprises 4PGE - page 9

    506488-01 Page 9 Issue 1008 T ypical Wiring Connections Figure 8 RR C C Y Y W THERMOST A T OUTDOOR UNIT G G WITH ECONOMIZER C R R Y1 THERMOST A T OUTDOOR UNIT ECONOMIZER YELLOW W G G GREEN Y2 BLACK BLUE W W ORANGE (Not Used) WITHOUT ECONOMIZER L2 L1 POWER WIRING 208/230-1-60 (75°C MIN. WIRE) POWER WIRING 24V CONTROL WIRING (NEC CLASS 2) GROUND SCR ...

  • Allied Air Enterprises 4PGE - page 10

    Page 10 506488-01 Issue 1008 ST ART -UP Pre-Start Check List Complete the following checks before starting the unit: 1. Check the type of gas being supplied. Be sure it is the same as listed on the unit nameplate. 2. Make sure that the vent hood has been properly installed. T o Light Burners: 1. T urn off electrical power to unit. 2. T urn the ther ...

  • Allied Air Enterprises 4PGE - page 11

    506488-01 Page 11 Issue 1008 x 3600 x = Cubic Feet Per Revolution BTU/HR INPUT # Seconds Per Revolution Heating V alue For Natural Gas: Check the gas input rate by observing the gas meter , when available, making sure all other gas appliances are turned off. The test hand on the meter should be timed for at least one revolution. Note the number of ...

  • Allied Air Enterprises 4PGE - page 12

    Page 12 506488-01 Issue 1008 in the 10-second interval, then the ignition control will de-energize the gas valve. 4. The ignition control is designed to repeat this “trial for ignition” a total of three times. If, at the end of the third trial, a flame still has not been established, the ignition control will repeat the trial for ignition seque ...

  • Allied Air Enterprises 4PGE - page 13

    506488-01 Page 13 Issue 1008 V ariable Speed Motor Units equipped with a variable speed circulation air blower motor will deliver a constant airflow within a wide range of external static pressures. Other features of this variable speed motor include: Sof t S t art/S top – The variable speed motor will slowly ramp up to normal operating speed. Th ...

  • Allied Air Enterprises 4PGE - page 14

    Page 14 506488-01 Issue 1008 CONTROL SYSTEM DIAGNOSTICS Fault Codes T able 5 Out door Coil Dirt and debris should not be allowed to accumulate on the outdoor coil surface or other part s in the air circuit. Cleaning should be as often as necessary to keep coil clean. Use a brush, vacuum cleaner attachment, or other suitable means. If water is used ...

  • Allied Air Enterprises 4PGE - page 15

    506488-01 Page 15 Issue 1008 Figure 1 1 Connection Diagram Single Phase – PSC Motor ...

  • Allied Air Enterprises 4PGE - page 16

    Page 16 506488-01 Issue 1008 Figure 12 208/230V -1-60 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Y G W1 R C Y G W R C BLU GRN YEL WHT RED Y R C DIAGNOSTIC MODULE G Y1 Y2 O W1 EM C1 R HUM INDOOR BLOWER MO TOR ICM BOARD BLU RED 24V A C 1 625 4 3 FLAME FLAME SENSE GR Y BRN BLU ORN RED YEL GRN BLK WHT PUR BLK GRN PUR ...

Fabricante Allied Air Enterprises Categoría Air Conditioner

Los documentos del dispositivo Allied Air Enterprises 4PGE que obtenemos del fabricante se pueden dividir en varios grupos. Entre ellos están::
- dibujos técnicos Allied Air Enterprises
- manuales de instrucciones 4PGE
- hojas de producto Allied Air Enterprises
- folletos informativos
- o etiquetas energéticas Allied Air Enterprises 4PGE
Todos son importantes, pero lo más importante desde el punto de vista del usuario de un dispositivo lo encontraremos en el manual de instrucciones Allied Air Enterprises 4PGE.

Un conjunto de documentos determinado como manual de instrucciones se divide también en tipos más detallados, tales como: instrucciones de montaje Allied Air Enterprises 4PGE, instrucciones de servicio, instrucciones cortas o instrucciones de usuario Allied Air Enterprises 4PGE. Dependiendo de la situación debes buscar el documento que necesitas. En nuestra página puedes consultar el manual de instrucciones más popular del producto Allied Air Enterprises 4PGE.

Manuales de instrucciones parecidos

El manual de instrucciones del dispositivo Allied Air Enterprises 4PGE, ¿cómo debería ser?
El manual de instrucciones, también determinado como el manual de usuario o simplemente instrucciones, es un documento técnico que tiene como objetivo ayudar a los usuarios a utilizar Allied Air Enterprises 4PGE. Las instrucciones normalmente las realiza un escritor técnico pero en un lenguaje comprensible para todos los usuarios de Allied Air Enterprises 4PGE.

El manual de instrucciones completo de Allied Air Enterprises debe contener unos elementos básicos. Una parte de ellos es menos importante, como por ejemplo: la portada / la página principal o las páginas de autor. Sin embargo, lo demás debe facilitarnos la información más importante desde el punto de vista del usuario.

1. Introducción y pistas sobre cómo orientarse con el manual Allied Air Enterprises 4PGE - Al principio de cada manual se deben encontrar las indicaciones acerca de la manera de usar un manual de instrucciones. Debe contener información sobre dónde encontrar el índice Allied Air Enterprises 4PGE, preguntas frecuentes o problemas más comunes – son los apartados más buscados por los usuarios de cada manual de instrucciones.
2. Índice - listados de todos los consejos acerca de Allied Air Enterprises 4PGE que encontraremos en el documento
3. Consejos de uso de las funciones básicas del dispositivo Allied Air Enterprises 4PGE - que deben facilitarnos los primeros pasos durante el uso de Allied Air Enterprises 4PGE
4. Troubleshooting - una secuencia sistematizada de acciones que nos ayudará a diagnosticar los problemas más importantes con Allied Air Enterprises 4PGE
5. FAQ - las preguntas frecuentes
6. Datos de contacto Información acerca de cómo encontrar los datos de contacto del fabricante / servicio de Allied Air Enterprises 4PGE en cada país si no somos capaces de solucionar el problema por nuestra cuenta.

¿Tienes una pregunta acerca de Allied Air Enterprises 4PGE?

Utiliza el formulario que se encuentra abajo

Si con la ayuda del manual de instrucciones encontrado no has podido solucionar tu problema con Allied Air Enterprises 4PGE, haz una pregunta utilizando el formulario que se encuentra abajo. Si alguno de los usuarios ha tenido un problema parecido con Allied Air Enterprises 4PGE probablemente compartirá una forma de solucionarlo.

Copia el texto de la imagen

Comentarios (0)