Инструкция обслуживания Allied Air Enterprises 4PGE

16 страниц 0.46 mb
Скачать

Перейти на страницу of 16

Summary
  • Allied Air Enterprises 4PGE - page 1

    506488-01 Page 1 Issue 1008 T ABLE OF CONTENTS SAFETY ............................................................... 2 INST ALLA TION .................................................... 2 ST AR T -UP .......................................................... 10 OPERA TION ...................................................... 1 1 MAINTENANCE .... ...

  • Allied Air Enterprises 4PGE - page 2

    Page 2 506488-01 Issue 1008 INST ALLA TION These instructions must be hung on or near the furnace in a conspicuous place. These units are single p ackage air conditioners with gas heat designed for outdoor inst allation on a rooftop or a slab. The units are completely assembled. All piping, refrigerant charge, and electrical wiring are factory inst ...

  • Allied Air Enterprises 4PGE - page 3

    506488-01 Page 3 Issue 1008 Location Use the following guidelines to select a suitable location for the unit. 1. Unit is designed for outdoor installation only . Unit must be installed so all electrical component s are protected from water . 2. Condenser coils must have an unlimited supply of air . 3. For ground level installation, use a level pref ...

  • Allied Air Enterprises 4PGE - page 4

    Page 4 506488-01 Issue 1008 Roof Curb Inst allation If a roof curb is used, follow the manufacturer ’s Inst allation Instructions and be sure that all required clearances are observed (see following Clearances section). Clearances All units require certain clearances for proper operation and service. Refer to T able 1 for the minimum clearances t ...

  • Allied Air Enterprises 4PGE - page 5

    506488-01 Page 5 Issue 1008 a sidewalk, patio, or other walkway where the condensate could cause the surface to become slippery . The products of combustion must not be allowed to accumulate within a confined space and recirculate. V ent Hood The unit is shipped with the vent hood, screen, and sheet metal screws packed in the plastic bag cont ainin ...

  • Allied Air Enterprises 4PGE - page 6

    Page 6 506488-01 Issue 1008 Condensate Drain The PGE/SG package unit is equipped with a 3/4" FPT coupling for condensate line connection. Plumbing must conform to local codes. Use a sealing compound on male pipe threads. The condensate drain line must be properly trapped and routed to a suitable drain. See Figure 5 for proper drain arrangement ...

  • Allied Air Enterprises 4PGE - page 7

    506488-01 Page 7 Issue 1008 The gas supply line should be routed through the grommet on the side of the unit. Refer to Figure 7 to locate this access opening. If local codes allow the use of a flexible gas appliance connector , always use a new listed connector . Do not use a connector which has previously serviced another gas appliance. The furnac ...

  • Allied Air Enterprises 4PGE - page 8

    Page 8 506488-01 Issue 1008 Check all connections for leaks when piping is completed, using a soapy solution. Some soaps used for leak detection are corrosive to cert ain metals. Carefully rinse piping thoroughly after completing leak detection. Electrical Wiring All wiring should be done in accordance with the National Electrical Code, ANSI/NFP A ...

  • Allied Air Enterprises 4PGE - page 9

    506488-01 Page 9 Issue 1008 T ypical Wiring Connections Figure 8 RR C C Y Y W THERMOST A T OUTDOOR UNIT G G WITH ECONOMIZER C R R Y1 THERMOST A T OUTDOOR UNIT ECONOMIZER YELLOW W G G GREEN Y2 BLACK BLUE W W ORANGE (Not Used) WITHOUT ECONOMIZER L2 L1 POWER WIRING 208/230-1-60 (75°C MIN. WIRE) POWER WIRING 24V CONTROL WIRING (NEC CLASS 2) GROUND SCR ...

  • Allied Air Enterprises 4PGE - page 10

    Page 10 506488-01 Issue 1008 ST ART -UP Pre-Start Check List Complete the following checks before starting the unit: 1. Check the type of gas being supplied. Be sure it is the same as listed on the unit nameplate. 2. Make sure that the vent hood has been properly installed. T o Light Burners: 1. T urn off electrical power to unit. 2. T urn the ther ...

  • Allied Air Enterprises 4PGE - page 11

    506488-01 Page 11 Issue 1008 x 3600 x = Cubic Feet Per Revolution BTU/HR INPUT # Seconds Per Revolution Heating V alue For Natural Gas: Check the gas input rate by observing the gas meter , when available, making sure all other gas appliances are turned off. The test hand on the meter should be timed for at least one revolution. Note the number of ...

  • Allied Air Enterprises 4PGE - page 12

    Page 12 506488-01 Issue 1008 in the 10-second interval, then the ignition control will de-energize the gas valve. 4. The ignition control is designed to repeat this “trial for ignition” a total of three times. If, at the end of the third trial, a flame still has not been established, the ignition control will repeat the trial for ignition seque ...

  • Allied Air Enterprises 4PGE - page 13

    506488-01 Page 13 Issue 1008 V ariable Speed Motor Units equipped with a variable speed circulation air blower motor will deliver a constant airflow within a wide range of external static pressures. Other features of this variable speed motor include: Sof t S t art/S top – The variable speed motor will slowly ramp up to normal operating speed. Th ...

  • Allied Air Enterprises 4PGE - page 14

    Page 14 506488-01 Issue 1008 CONTROL SYSTEM DIAGNOSTICS Fault Codes T able 5 Out door Coil Dirt and debris should not be allowed to accumulate on the outdoor coil surface or other part s in the air circuit. Cleaning should be as often as necessary to keep coil clean. Use a brush, vacuum cleaner attachment, or other suitable means. If water is used ...

  • Allied Air Enterprises 4PGE - page 15

    506488-01 Page 15 Issue 1008 Figure 1 1 Connection Diagram Single Phase – PSC Motor ...

  • Allied Air Enterprises 4PGE - page 16

    Page 16 506488-01 Issue 1008 Figure 12 208/230V -1-60 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Y G W1 R C Y G W R C BLU GRN YEL WHT RED Y R C DIAGNOSTIC MODULE G Y1 Y2 O W1 EM C1 R HUM INDOOR BLOWER MO TOR ICM BOARD BLU RED 24V A C 1 625 4 3 FLAME FLAME SENSE GR Y BRN BLU ORN RED YEL GRN BLK WHT PUR BLK GRN PUR ...

Производитель Allied Air Enterprises Категория Air Conditioner

Документы, которые мы получаем от производителя устройства Allied Air Enterprises 4PGE мы можем разделить на несколько групп. Это в частности:
- технические чертежи Allied Air Enterprises
- инструкции обслуживания 4PGE
- паспорта изделия Allied Air Enterprises
- информационные брошюры
- энергетические этикетки Allied Air Enterprises 4PGE
Все из них важны, однако самую важную информацию с точки зрения пользователя мы найдем в инструкции обслуживания Allied Air Enterprises 4PGE.

Группа документов, определяемая как инструкции обслуживания, делится также на более подробные типы, такие как: Инструкции монтажа Allied Air Enterprises 4PGE, инструкции обслуживания, короткие инструкции или инструкции пользователя Allied Air Enterprises 4PGE. В зависимости от потребностей, Вам необходимо поискать требуемый документ. На нашем сайте Вы можете просмотреть самую популярную инструкцию использования изделия Allied Air Enterprises 4PGE.

Похожие инструкции обслуживания

Полная инструкция обслуживания устройства Allied Air Enterprises 4PGE, как должна выглядеть?
Инструкция обслуживания, определяемая также как пособие пользователя, или просто "руководство" - это технический документ, цель которого заключается в использовании Allied Air Enterprises 4PGE пользователями. Инструкции пишет, как правило технический писатель, языком, доступным для всех пользователей Allied Air Enterprises 4PGE.

Полная инструкция обслуживания Allied Air Enterprises, должна заключать несколько основных элементов. Часть из них менее важная, как например: обложка / титульный лист или авторские страницы. Однако остальная часть, должна дать нам важную с точки зрения пользователя информацию.

1. Вступление и рекомендации, как пользоваться инструкцией Allied Air Enterprises 4PGE - В начале каждой инструкции, необходимо найти указания, как пользоваться данным пособием. Здесь должна находится информация, касающаяся местонахождения содержания Allied Air Enterprises 4PGE, FAQ и самых распространенных проблем - то есть мест, которые чаще всего ищут пользователи в каждой инструкции обслуживания
2. Содержание - индекс всех советов, касающихся Allied Air Enterprises 4PGE, которое найдем в данном документе
3. Советы по использованию основных функций устройства Allied Air Enterprises 4PGE - которые должны облегчить нам первые шаги во время использования Allied Air Enterprises 4PGE
4. Troubleshooting - систематизированный ряд действия, который поможет нам диагностировать а в дальнейшем очередность решения важнейших проблем Allied Air Enterprises 4PGE
5. FAQ - чаще всего задаваемые вопросы
6. Контактные данные Информация о том, где искать контактные данные производителя / сервисного центра Allied Air Enterprises 4PGE в данной стране, если самостоятельно не получится решить проблему.

У вас вопрос, касающийся Allied Air Enterprises 4PGE?

Воспользуйтесь формуляром, находящимся ниже

Если с помощью найденной инструкции Вы не решили свою проблему с Allied Air Enterprises 4PGE, задайте вопрос, заполнив следующий формуляр. Если у какого то из пользователей была похожая проблема с Allied Air Enterprises 4PGE со всей вероятностью он захочет поделиться методом ее решения.

Перепишите текст с картинки

Комментарии (0)