Manuale per l’uso UTICA BOILERS Gas-fired Boiler

28 pagine 1 mb
Scarica

Vai alla pagina of 28

Summary
  • UTICA BOILERS Gas-fired Boiler - page 1

    INST INST INST INST INST ALLA ALLA ALLA ALLA ALLA TION MANU TION MANU TION MANU TION MANU TION MANU AL AL AL AL AL AND OPERA AND OPERA AND OPERA AND OPERA AND OPERA TING INSTR TING INSTR TING INSTR TING INSTR TING INSTR UCTIONS UCTIONS UCTIONS UCTIONS UCTIONS MGB MGB MGB MGB MGB GAS FIRED BOILERS FOR FORCED HOT W A TER Utica Boilers, • P .O. Box ...

  • UTICA BOILERS Gas-fired Boiler - page 2

    T T T T T ABLE OF CONTENTS ABLE OF CONTENTS ABLE OF CONTENTS ABLE OF CONTENTS ABLE OF CONTENTS Safety Symbols & Warnings ........................................................................ Page 2 Installation Procedure .................................................................................. Page 3 Ventilation and Combustion Air . ...

  • UTICA BOILERS Gas-fired Boiler - page 3

    IMPOR IMPOR IMPOR IMPOR IMPOR T T T T T ANT! ANT! ANT! ANT! ANT! READ ALL INSTRUCTIONS BEFORE INSTALLING. WARNING: WARNING: WARNING: WARNING: WARNING: 1. Keep boiler area clear and free from combustible materials, gasoline and other flammable vapors and liquids. 2. DO NOT obstruct air openings to the boiler room. 3. Modification, substitution or el ...

  • UTICA BOILERS Gas-fired Boiler - page 4

    INST INST INST INST INST ALLA ALLA ALLA ALLA ALLA TION PR TION PR TION PR TION PR TION PR OCEDURE OCEDURE OCEDURE OCEDURE OCEDURE WARNING: Improper installation, adjustment, alteration, service or maintenance can cause injury or property damage. 1. The installation must conform to the requirements of the authority having jurisdiction or, in the abs ...

  • UTICA BOILERS Gas-fired Boiler - page 5

    PAGE 4 COMB COMB COMB COMB COMB USTION USTION USTION USTION USTION AIR REQ AIR REQ AIR REQ AIR REQ AIR REQ UIREMENTS UIREMENTS UIREMENTS UIREMENTS UIREMENTS (MINIMUM SQUARE INCHES OPENING) * * * * * UNCONFINED AREA ** ** ** ** ** CONFINED AREA OUTSIDE INSIDE OUTSIDE COMBUSTION AIR MODEL COMBUSTION COMBUSTION VERTICAL HORIZONTAL NUMBER AIR 1 SQ. IN ...

  • UTICA BOILERS Gas-fired Boiler - page 6

    PAGE 5 construction, air for combustion and ventilation must be obtained from outdoors or from spaces freely communicating with the outdoors. A permanent opening or openings having a total free area of not less than 1 square inch per 5,000 BTU per hour of total input rating of all appliances shall be provided. Ducts may be used to convey makeup air ...

  • UTICA BOILERS Gas-fired Boiler - page 7

    FIGURE 3 FIGURE 4 shall be permitted where the equipment has clearances of at least 1 inch from the sides, 1 inch from the back, and 6 inches from the front of the boiler. The opening shall directly communicate with the outdoors or shall communicate through a vertical or horizontal duct to the outdoors or spaces (crawl or attic) that freely communi ...

  • UTICA BOILERS Gas-fired Boiler - page 8

    PAGE 7 FIGURE 7 FIGURE 6 BYPASS PIPING MIXING VALVE PIPING 3. Hot water boilers installed above radiation level must be provided with a low water cut- off device. 4. When a boiler is connected to a heating system that utilizes multiple zoned circulators, each circulator must be supplied with a flow control valve to prevent gravity circulation. 5. H ...

  • UTICA BOILERS Gas-fired Boiler - page 9

    PAGE 8 7. Installation using circulators is shown in figure 9 below. 8. Installation using zone valves is shown in figure 10 on page 9. 9. For further piping information refer to the I=B=R Installation and Piping Guide. FIGURE 9 FIGURE 8 PRIMARY SECONDARY PIPING WITH BY PASS ...

  • UTICA BOILERS Gas-fired Boiler - page 10

    PAGE 9 VENT INST VENT INST VENT INST VENT INST VENT INST ALLA ALLA ALLA ALLA ALLA TION TION TION TION TION WARNING: WARNING: WARNING: WARNING: WARNING: This boiler shall not be connected to any portion of a mechanical draft system operating under positive pressure. 1. The vent pipe must slope upward from the boiler not less then 1/4 inch for every ...

  • UTICA BOILERS Gas-fired Boiler - page 11

    VENT SY VENT SY VENT SY VENT SY VENT SY STEM MODIFICA STEM MODIFICA STEM MODIFICA STEM MODIFICA STEM MODIFICA TION TION TION TION TION When an existing boiler is removed from a common venting system, the common venting system is likely to be too large for the proper venting of the appliances remained connected to it. If this situation occurs, the f ...

  • UTICA BOILERS Gas-fired Boiler - page 12

    VENT D VENT D VENT D VENT D VENT D AMPER INST AMPER INST AMPER INST AMPER INST AMPER INST ALLA ALLA ALLA ALLA ALLA TION TION TION TION TION AND INSTR AND INSTR AND INSTR AND INSTR AND INSTR UCTIONS UCTIONS UCTIONS UCTIONS UCTIONS INSTALLATION INSTALLATION INSTALLATION INSTALLATION INSTALLATION NOTE: Refer to Figure 11for steps 1 - 7. 1. Place Vent ...

  • UTICA BOILERS Gas-fired Boiler - page 13

    CONNECTING GAS SERVICE CONNECTING GAS SERVICE CONNECTING GAS SERVICE CONNECTING GAS SERVICE CONNECTING GAS SERVICE 1. Connect gas service from meter to control assembly in accordance with ANSI Z223.1 and local codes or utility. A ground joint union should be installed for easy removal of gas control for servicing. A drip leg or trap must be install ...

  • UTICA BOILERS Gas-fired Boiler - page 14

    LIGHTING INSTRUCTIONS LIGHTING INSTRUCTIONS LIGHTING INSTRUCTIONS LIGHTING INSTRUCTIONS LIGHTING INSTRUCTIONS WARNING: WARNING: WARNING: WARNING: WARNING: IF YOU DO NOT FOLLOW THESE INSTRUCTIONS EXACTLY, A FIRE OR EXPLOSION MAY RESULT CAUSING PROPERTY DAMAGE, PERSONAL INJURY OR LOSS OF LIFE. Before any procedures are attempted on this appliance, it ...

  • UTICA BOILERS Gas-fired Boiler - page 15

    FIGURE 14 PAGE 14 LIGHTING PROCEDURE FOR BOILER WITH LIGHTING PROCEDURE FOR BOILER WITH LIGHTING PROCEDURE FOR BOILER WITH LIGHTING PROCEDURE FOR BOILER WITH LIGHTING PROCEDURE FOR BOILER WITH INTERMITTENT PIL INTERMITTENT PIL INTERMITTENT PIL INTERMITTENT PIL INTERMITTENT PIL O O O O O T SY T SY T SY T SY T SY STEMS STEMS STEMS STEMS STEMS . . . . ...

  • UTICA BOILERS Gas-fired Boiler - page 16

    LIGHTING PROCEDURE FOR BOILER LIGHTING PROCEDURE FOR BOILER LIGHTING PROCEDURE FOR BOILER LIGHTING PROCEDURE FOR BOILER LIGHTING PROCEDURE FOR BOILER WITH CONTINUOUS PIL WITH CONTINUOUS PIL WITH CONTINUOUS PIL WITH CONTINUOUS PIL WITH CONTINUOUS PIL O O O O O T T T T T FOR YOUR SAFETY READ BEFORE LIGHTING FOR YOUR SAFETY READ BEFORE LIGHTING FOR YO ...

  • UTICA BOILERS Gas-fired Boiler - page 17

    9. Push in gas control knob or reset button if so equipped, all the way in and hold. Immediately light the pilot with a match. Continue to hold the gas control knob or reset button in for about 1 minute after the pilot is lit. Release knob or button, and it will pop up back up. Pilot should remain lit. If it goes out, repeat steps 5 through 9. * If ...

  • UTICA BOILERS Gas-fired Boiler - page 18

    GENERAL INSTRUCTIONS GENERAL INSTRUCTIONS GENERAL INSTRUCTIONS GENERAL INSTRUCTIONS GENERAL INSTRUCTIONS Before seasonal start-up, have a competent service agency check the boiler for soot and scale in the flues, clean the burners and check the gas input rate to maintain high operating efficiency. CA CA CA CA CA UTION: UTION: UTION: UTION: UTION: L ...

  • UTICA BOILERS Gas-fired Boiler - page 19

    FIGURE 19 FIGURE 20 PAGE 18 the mirror positioned above the burners, the flue gas passageways can be checked for soot or scale. The following procedure should be followed to clean the flue gas passageways: 1. Remove the burners from the combustion chamber by raising the burners up from the manifold orifices and pulling toward the front of the boile ...

  • UTICA BOILERS Gas-fired Boiler - page 20

    The burners and pilot should be checked for signs of corrosion, rust or scale buildup. The area around the boiler must be kept clear and free of combustible materials, gasoline and other flammable vapors and liquids. The free flow of combustion and ventilating air to the boiler and boiler room must not be restricted or blocked. It is recommended th ...

  • UTICA BOILERS Gas-fired Boiler - page 21

    PAGE 20 CHECK SAFETY CONTROL CIRCUIT, after burner adjustments are made, for satisfactory operation. 1. Pilot: With main burner operating, turn the pilot gas adjusting screw clockwise until pilot gas is turned off. See figures 14, 15, & 16 on pages 14 & 15. Within 90 seconds the main gas control should close, shutting off the gas to the mai ...

  • UTICA BOILERS Gas-fired Boiler - page 22

    MGB SERIES REPLA MGB SERIES REPLA MGB SERIES REPLA MGB SERIES REPLA MGB SERIES REPLA CEMENT P CEMENT P CEMENT P CEMENT P CEMENT P AR AR AR AR AR TS - PIL TS - PIL TS - PIL TS - PIL TS - PIL O O O O O TS TS TS TS TS FIGURE 25 PAGE 21 1 1520001 THERMOCOUPLE Q309A 1 2 HW-009.01 SCREW #8-18X1/2 4 3 PB-011.03 PILOT STDG Q380 NAT 1 PB-011.04 PILOT STDG Q ...

  • UTICA BOILERS Gas-fired Boiler - page 23

    MGB SERIES REPLA MGB SERIES REPLA MGB SERIES REPLA MGB SERIES REPLA MGB SERIES REPLA CEMENT P CEMENT P CEMENT P CEMENT P CEMENT P AR AR AR AR AR TS - B TS - B TS - B TS - B TS - B ASE ASE ASE ASE ASE FIGURE 26 PAGE 22 1 3352401 BURNER TUBE 1.3/4" MGB50 (1) MGB75 (2) MGB100 (2) MGB125 (3) MGB150 (3) MGB175 (4) MGB200 (4) MGB250 (5) MGB300 (6) 2 ...

  • UTICA BOILERS Gas-fired Boiler - page 24

    MGB SERIES REPLA MGB SERIES REPLA MGB SERIES REPLA MGB SERIES REPLA MGB SERIES REPLA CEMENT P CEMENT P CEMENT P CEMENT P CEMENT P AR AR AR AR AR TS - J TS - J TS - J TS - J TS - J A A A A A CKETS CKETS CKETS CKETS CKETS FIGURE 27 PAGE 23 1 31621501 PANEL - TOP MGB50 1 31621502 PANEL - TOP MGB75 & 100 31621503 PANEL - TOP MGB125 31621504 PANEL - ...

  • UTICA BOILERS Gas-fired Boiler - page 25

    MGB SERIES REPLA MGB SERIES REPLA MGB SERIES REPLA MGB SERIES REPLA MGB SERIES REPLA CEMENT P CEMENT P CEMENT P CEMENT P CEMENT P AR AR AR AR AR TS TS TS TS TS HEA HEA HEA HEA HEA T EX T EX T EX T EX T EX CHANGER CHANGER CHANGER CHANGER CHANGER FIGURE 28 PAGE 24 ITEM NO P /N DESCRIPTION QTY. 1 100-2-2.01 B-LEFT HAND SECTION 1 2 100-2-1.01 B-CENTER ...

  • UTICA BOILERS Gas-fired Boiler - page 26

    MGB SERIES REPLA MGB SERIES REPLA MGB SERIES REPLA MGB SERIES REPLA MGB SERIES REPLA CEMENT P CEMENT P CEMENT P CEMENT P CEMENT P AR AR AR AR AR TS TS TS TS TS PIPING & CONTROLS PIPING & CONTROLS PIPING & CONTROLS PIPING & CONTROLS PIPING & CONTROLS FIGURE 29 PAGE 25 ITEM NO P/N DESCRIPTION QTY. 1 37513301 WIRE ROLLOUT/SPILL 28& ...

  • UTICA BOILERS Gas-fired Boiler - page 27

    § § § ** † ∆ ∆ ∆ ∆ ∆ Natural Propane Boiler A.G.A. Heating I=B=R NetRating No. Recommended Gas Orifice Water No. Input Capacity NetOutput S q . F t . H W of Air Cushion Orifice Drill Content Btu/Hr. Btu/Hr. Btu/Hr @ 1 70 o Burners Tank Drill Size Size (Gals.) MGB 50 50,000 42,000 37,000 24 3 1 15 30 47 2.4 MGB 75 75,000 63,000 55,000 ...

  • UTICA BOILERS Gas-fired Boiler - page 28

    * Pump size Boiler Natural Dimensions Supply & No. Ga s Return Inlet A B C D E F Tappings MGB 50 1/2" 11.1/8" 5.1/2" 4" 30.3/4" 36.1/4" 6" 1.1/4" MGB 75 1/2" 15 7.1/2" 5" 30.3/4" 37.3/4" 6" 1.1/4" MGB 100 1/2" 15 7.1/2" 6" 30.3/4" 37.1/4" 6.1/2&q ...

Fabbricante UTICA BOILERS Categoria Boiler

I documenti che otteniamo dal fabbricante del dispositivoUTICA BOILERS Gas-fired Boiler possono essere suddivisi in diversi gruppi. Questi sono tra gli altri:
- disegni tecnici UTICA BOILERS
- manuali per l’uso Gas-fired Boiler
- schede prodotto UTICA BOILERS
- opuscoli
- o etichette energetiche UTICA BOILERS Gas-fired Boiler
Tutti sono importanti, ma le informazioni più importanti dal punto di vista di utilizzo del dispositivo possono essere trovate nel manuale per l’uso UTICA BOILERS Gas-fired Boiler.

Un gruppo di documenti denominato manuali per l’uso, è anche suddiviso in tipi più specifici, come: Manuali di installazione UTICA BOILERS Gas-fired Boiler, manuali di manutenzione, brevi manuali o manuali utente UTICA BOILERS Gas-fired Boiler. A seconda delle esigenze, si dovrebbe cercare il documento necessario. Nel nostro sito web, puoi visualizzare il manuale più popolare per l'uso del prodotto UTICA BOILERS Gas-fired Boiler.

Manuali per l’uso simili

Manuale completo del dispositivo UTICA BOILERS Gas-fired Boiler, come deve essere?
Il manuale per l’uso, denominato anche istruzioni per l’uso, o semplicemente il manuale è un documento tecnico progettato per aiutare ad utilizzare UTICA BOILERS Gas-fired Boiler dagli utenti. I manuali sono di solito scritti da uno scrittore tecnico, ma in un linguaggio accessibile a tutti gli utenti UTICA BOILERS Gas-fired Boiler.

Il manuale per l’uso completo UTICA BOILERS, dovrebbe includere vari elementi di base. Alcuni di loro sono meno importanti, come ad esempio: copertina / pagina del titolo o pagina di autore. Tuttavia, la parte rimanente, dovrebbe fornire informazioni importanti dal punto di vista dell'utente.

1. Introduzione e la guida su come utilizzare il manuale UTICA BOILERS Gas-fired Boiler - All'inizio di ogni manuale, dovremmo trovare indizi su come utilizzare il documento. Dovrebbe contenere informazioni sulla posizione dell’indice UTICA BOILERS Gas-fired Boiler, FAQ o i problemi più comuni : i punti che sono più spesso cercati dagli utenti di ogni manuale
2. Indice - elenco di tutti i suggerimenti per UTICA BOILERS Gas-fired Boiler che possono essere trovati nel documento corrente
3. Suggerimenti su come utilizzare le funzioni di base del dispositivo UTICA BOILERS Gas-fired Boiler - che ci dovrebbe aiutare nei primi passi durante l'uso UTICA BOILERS Gas-fired Boiler
4. Troubleshooting - sequenza sistematica delle attività che vi aiuterà a diagnosticare e, successivamente, risolvere i problemi più importanti del UTICA BOILERS Gas-fired Boiler
5. FAQ - domande più frequenti
6. Dettagli di contatto Informazioni su dove cercare il contatto con il fabbricante / servizio UTICA BOILERS Gas-fired Boiler in un dato paese, se il problema non può essere risolto da noi stessi.

Hai una domanda su UTICA BOILERS Gas-fired Boiler?

Utilizza il modulo sottostante

Se non hai risolto il problema con UTICA BOILERS Gas-fired Boiler con l'aiuto del manuale che hai trovato, fai una domanda utilizzando il modulo sottostante. Se un utente ha avuto un problema simile con UTICA BOILERS Gas-fired Boiler è probabile che voglia condividere il modo di risolverlo.

Riscrivi il testo dall’immagine

Commenti (0)