Manual UTICA BOILERS Gas-fired Boiler

28 pages 1 mb
Download

Go to site of 28

Summary
  • UTICA BOILERS Gas-fired Boiler - page 1

    INST INST INST INST INST ALLA ALLA ALLA ALLA ALLA TION MANU TION MANU TION MANU TION MANU TION MANU AL AL AL AL AL AND OPERA AND OPERA AND OPERA AND OPERA AND OPERA TING INSTR TING INSTR TING INSTR TING INSTR TING INSTR UCTIONS UCTIONS UCTIONS UCTIONS UCTIONS MGB MGB MGB MGB MGB GAS FIRED BOILERS FOR FORCED HOT W A TER Utica Boilers, • P .O. Box ...

  • UTICA BOILERS Gas-fired Boiler - page 2

    T T T T T ABLE OF CONTENTS ABLE OF CONTENTS ABLE OF CONTENTS ABLE OF CONTENTS ABLE OF CONTENTS Safety Symbols & Warnings ........................................................................ Page 2 Installation Procedure .................................................................................. Page 3 Ventilation and Combustion Air . ...

  • UTICA BOILERS Gas-fired Boiler - page 3

    IMPOR IMPOR IMPOR IMPOR IMPOR T T T T T ANT! ANT! ANT! ANT! ANT! READ ALL INSTRUCTIONS BEFORE INSTALLING. WARNING: WARNING: WARNING: WARNING: WARNING: 1. Keep boiler area clear and free from combustible materials, gasoline and other flammable vapors and liquids. 2. DO NOT obstruct air openings to the boiler room. 3. Modification, substitution or el ...

  • UTICA BOILERS Gas-fired Boiler - page 4

    INST INST INST INST INST ALLA ALLA ALLA ALLA ALLA TION PR TION PR TION PR TION PR TION PR OCEDURE OCEDURE OCEDURE OCEDURE OCEDURE WARNING: Improper installation, adjustment, alteration, service or maintenance can cause injury or property damage. 1. The installation must conform to the requirements of the authority having jurisdiction or, in the abs ...

  • UTICA BOILERS Gas-fired Boiler - page 5

    PAGE 4 COMB COMB COMB COMB COMB USTION USTION USTION USTION USTION AIR REQ AIR REQ AIR REQ AIR REQ AIR REQ UIREMENTS UIREMENTS UIREMENTS UIREMENTS UIREMENTS (MINIMUM SQUARE INCHES OPENING) * * * * * UNCONFINED AREA ** ** ** ** ** CONFINED AREA OUTSIDE INSIDE OUTSIDE COMBUSTION AIR MODEL COMBUSTION COMBUSTION VERTICAL HORIZONTAL NUMBER AIR 1 SQ. IN ...

  • UTICA BOILERS Gas-fired Boiler - page 6

    PAGE 5 construction, air for combustion and ventilation must be obtained from outdoors or from spaces freely communicating with the outdoors. A permanent opening or openings having a total free area of not less than 1 square inch per 5,000 BTU per hour of total input rating of all appliances shall be provided. Ducts may be used to convey makeup air ...

  • UTICA BOILERS Gas-fired Boiler - page 7

    FIGURE 3 FIGURE 4 shall be permitted where the equipment has clearances of at least 1 inch from the sides, 1 inch from the back, and 6 inches from the front of the boiler. The opening shall directly communicate with the outdoors or shall communicate through a vertical or horizontal duct to the outdoors or spaces (crawl or attic) that freely communi ...

  • UTICA BOILERS Gas-fired Boiler - page 8

    PAGE 7 FIGURE 7 FIGURE 6 BYPASS PIPING MIXING VALVE PIPING 3. Hot water boilers installed above radiation level must be provided with a low water cut- off device. 4. When a boiler is connected to a heating system that utilizes multiple zoned circulators, each circulator must be supplied with a flow control valve to prevent gravity circulation. 5. H ...

  • UTICA BOILERS Gas-fired Boiler - page 9

    PAGE 8 7. Installation using circulators is shown in figure 9 below. 8. Installation using zone valves is shown in figure 10 on page 9. 9. For further piping information refer to the I=B=R Installation and Piping Guide. FIGURE 9 FIGURE 8 PRIMARY SECONDARY PIPING WITH BY PASS ...

  • UTICA BOILERS Gas-fired Boiler - page 10

    PAGE 9 VENT INST VENT INST VENT INST VENT INST VENT INST ALLA ALLA ALLA ALLA ALLA TION TION TION TION TION WARNING: WARNING: WARNING: WARNING: WARNING: This boiler shall not be connected to any portion of a mechanical draft system operating under positive pressure. 1. The vent pipe must slope upward from the boiler not less then 1/4 inch for every ...

  • UTICA BOILERS Gas-fired Boiler - page 11

    VENT SY VENT SY VENT SY VENT SY VENT SY STEM MODIFICA STEM MODIFICA STEM MODIFICA STEM MODIFICA STEM MODIFICA TION TION TION TION TION When an existing boiler is removed from a common venting system, the common venting system is likely to be too large for the proper venting of the appliances remained connected to it. If this situation occurs, the f ...

  • UTICA BOILERS Gas-fired Boiler - page 12

    VENT D VENT D VENT D VENT D VENT D AMPER INST AMPER INST AMPER INST AMPER INST AMPER INST ALLA ALLA ALLA ALLA ALLA TION TION TION TION TION AND INSTR AND INSTR AND INSTR AND INSTR AND INSTR UCTIONS UCTIONS UCTIONS UCTIONS UCTIONS INSTALLATION INSTALLATION INSTALLATION INSTALLATION INSTALLATION NOTE: Refer to Figure 11for steps 1 - 7. 1. Place Vent ...

  • UTICA BOILERS Gas-fired Boiler - page 13

    CONNECTING GAS SERVICE CONNECTING GAS SERVICE CONNECTING GAS SERVICE CONNECTING GAS SERVICE CONNECTING GAS SERVICE 1. Connect gas service from meter to control assembly in accordance with ANSI Z223.1 and local codes or utility. A ground joint union should be installed for easy removal of gas control for servicing. A drip leg or trap must be install ...

  • UTICA BOILERS Gas-fired Boiler - page 14

    LIGHTING INSTRUCTIONS LIGHTING INSTRUCTIONS LIGHTING INSTRUCTIONS LIGHTING INSTRUCTIONS LIGHTING INSTRUCTIONS WARNING: WARNING: WARNING: WARNING: WARNING: IF YOU DO NOT FOLLOW THESE INSTRUCTIONS EXACTLY, A FIRE OR EXPLOSION MAY RESULT CAUSING PROPERTY DAMAGE, PERSONAL INJURY OR LOSS OF LIFE. Before any procedures are attempted on this appliance, it ...

  • UTICA BOILERS Gas-fired Boiler - page 15

    FIGURE 14 PAGE 14 LIGHTING PROCEDURE FOR BOILER WITH LIGHTING PROCEDURE FOR BOILER WITH LIGHTING PROCEDURE FOR BOILER WITH LIGHTING PROCEDURE FOR BOILER WITH LIGHTING PROCEDURE FOR BOILER WITH INTERMITTENT PIL INTERMITTENT PIL INTERMITTENT PIL INTERMITTENT PIL INTERMITTENT PIL O O O O O T SY T SY T SY T SY T SY STEMS STEMS STEMS STEMS STEMS . . . . ...

  • UTICA BOILERS Gas-fired Boiler - page 16

    LIGHTING PROCEDURE FOR BOILER LIGHTING PROCEDURE FOR BOILER LIGHTING PROCEDURE FOR BOILER LIGHTING PROCEDURE FOR BOILER LIGHTING PROCEDURE FOR BOILER WITH CONTINUOUS PIL WITH CONTINUOUS PIL WITH CONTINUOUS PIL WITH CONTINUOUS PIL WITH CONTINUOUS PIL O O O O O T T T T T FOR YOUR SAFETY READ BEFORE LIGHTING FOR YOUR SAFETY READ BEFORE LIGHTING FOR YO ...

  • UTICA BOILERS Gas-fired Boiler - page 17

    9. Push in gas control knob or reset button if so equipped, all the way in and hold. Immediately light the pilot with a match. Continue to hold the gas control knob or reset button in for about 1 minute after the pilot is lit. Release knob or button, and it will pop up back up. Pilot should remain lit. If it goes out, repeat steps 5 through 9. * If ...

  • UTICA BOILERS Gas-fired Boiler - page 18

    GENERAL INSTRUCTIONS GENERAL INSTRUCTIONS GENERAL INSTRUCTIONS GENERAL INSTRUCTIONS GENERAL INSTRUCTIONS Before seasonal start-up, have a competent service agency check the boiler for soot and scale in the flues, clean the burners and check the gas input rate to maintain high operating efficiency. CA CA CA CA CA UTION: UTION: UTION: UTION: UTION: L ...

  • UTICA BOILERS Gas-fired Boiler - page 19

    FIGURE 19 FIGURE 20 PAGE 18 the mirror positioned above the burners, the flue gas passageways can be checked for soot or scale. The following procedure should be followed to clean the flue gas passageways: 1. Remove the burners from the combustion chamber by raising the burners up from the manifold orifices and pulling toward the front of the boile ...

  • UTICA BOILERS Gas-fired Boiler - page 20

    The burners and pilot should be checked for signs of corrosion, rust or scale buildup. The area around the boiler must be kept clear and free of combustible materials, gasoline and other flammable vapors and liquids. The free flow of combustion and ventilating air to the boiler and boiler room must not be restricted or blocked. It is recommended th ...

  • UTICA BOILERS Gas-fired Boiler - page 21

    PAGE 20 CHECK SAFETY CONTROL CIRCUIT, after burner adjustments are made, for satisfactory operation. 1. Pilot: With main burner operating, turn the pilot gas adjusting screw clockwise until pilot gas is turned off. See figures 14, 15, & 16 on pages 14 & 15. Within 90 seconds the main gas control should close, shutting off the gas to the mai ...

  • UTICA BOILERS Gas-fired Boiler - page 22

    MGB SERIES REPLA MGB SERIES REPLA MGB SERIES REPLA MGB SERIES REPLA MGB SERIES REPLA CEMENT P CEMENT P CEMENT P CEMENT P CEMENT P AR AR AR AR AR TS - PIL TS - PIL TS - PIL TS - PIL TS - PIL O O O O O TS TS TS TS TS FIGURE 25 PAGE 21 1 1520001 THERMOCOUPLE Q309A 1 2 HW-009.01 SCREW #8-18X1/2 4 3 PB-011.03 PILOT STDG Q380 NAT 1 PB-011.04 PILOT STDG Q ...

  • UTICA BOILERS Gas-fired Boiler - page 23

    MGB SERIES REPLA MGB SERIES REPLA MGB SERIES REPLA MGB SERIES REPLA MGB SERIES REPLA CEMENT P CEMENT P CEMENT P CEMENT P CEMENT P AR AR AR AR AR TS - B TS - B TS - B TS - B TS - B ASE ASE ASE ASE ASE FIGURE 26 PAGE 22 1 3352401 BURNER TUBE 1.3/4" MGB50 (1) MGB75 (2) MGB100 (2) MGB125 (3) MGB150 (3) MGB175 (4) MGB200 (4) MGB250 (5) MGB300 (6) 2 ...

  • UTICA BOILERS Gas-fired Boiler - page 24

    MGB SERIES REPLA MGB SERIES REPLA MGB SERIES REPLA MGB SERIES REPLA MGB SERIES REPLA CEMENT P CEMENT P CEMENT P CEMENT P CEMENT P AR AR AR AR AR TS - J TS - J TS - J TS - J TS - J A A A A A CKETS CKETS CKETS CKETS CKETS FIGURE 27 PAGE 23 1 31621501 PANEL - TOP MGB50 1 31621502 PANEL - TOP MGB75 & 100 31621503 PANEL - TOP MGB125 31621504 PANEL - ...

  • UTICA BOILERS Gas-fired Boiler - page 25

    MGB SERIES REPLA MGB SERIES REPLA MGB SERIES REPLA MGB SERIES REPLA MGB SERIES REPLA CEMENT P CEMENT P CEMENT P CEMENT P CEMENT P AR AR AR AR AR TS TS TS TS TS HEA HEA HEA HEA HEA T EX T EX T EX T EX T EX CHANGER CHANGER CHANGER CHANGER CHANGER FIGURE 28 PAGE 24 ITEM NO P /N DESCRIPTION QTY. 1 100-2-2.01 B-LEFT HAND SECTION 1 2 100-2-1.01 B-CENTER ...

  • UTICA BOILERS Gas-fired Boiler - page 26

    MGB SERIES REPLA MGB SERIES REPLA MGB SERIES REPLA MGB SERIES REPLA MGB SERIES REPLA CEMENT P CEMENT P CEMENT P CEMENT P CEMENT P AR AR AR AR AR TS TS TS TS TS PIPING & CONTROLS PIPING & CONTROLS PIPING & CONTROLS PIPING & CONTROLS PIPING & CONTROLS FIGURE 29 PAGE 25 ITEM NO P/N DESCRIPTION QTY. 1 37513301 WIRE ROLLOUT/SPILL 28& ...

  • UTICA BOILERS Gas-fired Boiler - page 27

    § § § ** † ∆ ∆ ∆ ∆ ∆ Natural Propane Boiler A.G.A. Heating I=B=R NetRating No. Recommended Gas Orifice Water No. Input Capacity NetOutput S q . F t . H W of Air Cushion Orifice Drill Content Btu/Hr. Btu/Hr. Btu/Hr @ 1 70 o Burners Tank Drill Size Size (Gals.) MGB 50 50,000 42,000 37,000 24 3 1 15 30 47 2.4 MGB 75 75,000 63,000 55,000 ...

  • UTICA BOILERS Gas-fired Boiler - page 28

    * Pump size Boiler Natural Dimensions Supply & No. Ga s Return Inlet A B C D E F Tappings MGB 50 1/2" 11.1/8" 5.1/2" 4" 30.3/4" 36.1/4" 6" 1.1/4" MGB 75 1/2" 15 7.1/2" 5" 30.3/4" 37.3/4" 6" 1.1/4" MGB 100 1/2" 15 7.1/2" 6" 30.3/4" 37.1/4" 6.1/2&q ...

Manufacturer UTICA BOILERS Category Boiler

Documents that we receive from a manufacturer of a UTICA BOILERS Gas-fired Boiler can be divided into several groups. They are, among others:
- UTICA BOILERS technical drawings
- Gas-fired Boiler manuals
- UTICA BOILERS product data sheets
- information booklets
- or energy labels UTICA BOILERS Gas-fired Boiler
All of them are important, but the most important information from the point of view of use of the device are in the user manual UTICA BOILERS Gas-fired Boiler.

A group of documents referred to as user manuals is also divided into more specific types, such as: Installation manuals UTICA BOILERS Gas-fired Boiler, service manual, brief instructions and user manuals UTICA BOILERS Gas-fired Boiler. Depending on your needs, you should look for the document you need. In our website you can view the most popular manual of the product UTICA BOILERS Gas-fired Boiler.

Similar manuals

A complete manual for the device UTICA BOILERS Gas-fired Boiler, how should it look like?
A manual, also referred to as a user manual, or simply "instructions" is a technical document designed to assist in the use UTICA BOILERS Gas-fired Boiler by users. Manuals are usually written by a technical writer, but in a language understandable to all users of UTICA BOILERS Gas-fired Boiler.

A complete UTICA BOILERS manual, should contain several basic components. Some of them are less important, such as: cover / title page or copyright page. However, the remaining part should provide us with information that is important from the point of view of the user.

1. Preface and tips on how to use the manual UTICA BOILERS Gas-fired Boiler - At the beginning of each manual we should find clues about how to use the guidelines. It should include information about the location of the Contents of the UTICA BOILERS Gas-fired Boiler, FAQ or common problems, i.e. places that are most often searched by users in each manual
2. Contents - index of all tips concerning the UTICA BOILERS Gas-fired Boiler, that we can find in the current document
3. Tips how to use the basic functions of the device UTICA BOILERS Gas-fired Boiler - which should help us in our first steps of using UTICA BOILERS Gas-fired Boiler
4. Troubleshooting - systematic sequence of activities that will help us diagnose and subsequently solve the most important problems with UTICA BOILERS Gas-fired Boiler
5. FAQ - Frequently Asked Questions
6. Contact detailsInformation about where to look for contact to the manufacturer/service of UTICA BOILERS Gas-fired Boiler in a specific country, if it was not possible to solve the problem on our own.

Do you have a question concerning UTICA BOILERS Gas-fired Boiler?

Use the form below

If you did not solve your problem by using a manual UTICA BOILERS Gas-fired Boiler, ask a question using the form below. If a user had a similar problem with UTICA BOILERS Gas-fired Boiler it is likely that he will want to share the way to solve it.

Copy the text from the picture

Comments (0)