Инструкция обслуживания UTICA BOILERS Gas-fired Boiler

28 страниц 1 mb
Скачать

Перейти на страницу of 28

Summary
  • UTICA BOILERS Gas-fired Boiler - page 1

    INST INST INST INST INST ALLA ALLA ALLA ALLA ALLA TION MANU TION MANU TION MANU TION MANU TION MANU AL AL AL AL AL AND OPERA AND OPERA AND OPERA AND OPERA AND OPERA TING INSTR TING INSTR TING INSTR TING INSTR TING INSTR UCTIONS UCTIONS UCTIONS UCTIONS UCTIONS MGB MGB MGB MGB MGB GAS FIRED BOILERS FOR FORCED HOT W A TER Utica Boilers, • P .O. Box ...

  • UTICA BOILERS Gas-fired Boiler - page 2

    T T T T T ABLE OF CONTENTS ABLE OF CONTENTS ABLE OF CONTENTS ABLE OF CONTENTS ABLE OF CONTENTS Safety Symbols & Warnings ........................................................................ Page 2 Installation Procedure .................................................................................. Page 3 Ventilation and Combustion Air . ...

  • UTICA BOILERS Gas-fired Boiler - page 3

    IMPOR IMPOR IMPOR IMPOR IMPOR T T T T T ANT! ANT! ANT! ANT! ANT! READ ALL INSTRUCTIONS BEFORE INSTALLING. WARNING: WARNING: WARNING: WARNING: WARNING: 1. Keep boiler area clear and free from combustible materials, gasoline and other flammable vapors and liquids. 2. DO NOT obstruct air openings to the boiler room. 3. Modification, substitution or el ...

  • UTICA BOILERS Gas-fired Boiler - page 4

    INST INST INST INST INST ALLA ALLA ALLA ALLA ALLA TION PR TION PR TION PR TION PR TION PR OCEDURE OCEDURE OCEDURE OCEDURE OCEDURE WARNING: Improper installation, adjustment, alteration, service or maintenance can cause injury or property damage. 1. The installation must conform to the requirements of the authority having jurisdiction or, in the abs ...

  • UTICA BOILERS Gas-fired Boiler - page 5

    PAGE 4 COMB COMB COMB COMB COMB USTION USTION USTION USTION USTION AIR REQ AIR REQ AIR REQ AIR REQ AIR REQ UIREMENTS UIREMENTS UIREMENTS UIREMENTS UIREMENTS (MINIMUM SQUARE INCHES OPENING) * * * * * UNCONFINED AREA ** ** ** ** ** CONFINED AREA OUTSIDE INSIDE OUTSIDE COMBUSTION AIR MODEL COMBUSTION COMBUSTION VERTICAL HORIZONTAL NUMBER AIR 1 SQ. IN ...

  • UTICA BOILERS Gas-fired Boiler - page 6

    PAGE 5 construction, air for combustion and ventilation must be obtained from outdoors or from spaces freely communicating with the outdoors. A permanent opening or openings having a total free area of not less than 1 square inch per 5,000 BTU per hour of total input rating of all appliances shall be provided. Ducts may be used to convey makeup air ...

  • UTICA BOILERS Gas-fired Boiler - page 7

    FIGURE 3 FIGURE 4 shall be permitted where the equipment has clearances of at least 1 inch from the sides, 1 inch from the back, and 6 inches from the front of the boiler. The opening shall directly communicate with the outdoors or shall communicate through a vertical or horizontal duct to the outdoors or spaces (crawl or attic) that freely communi ...

  • UTICA BOILERS Gas-fired Boiler - page 8

    PAGE 7 FIGURE 7 FIGURE 6 BYPASS PIPING MIXING VALVE PIPING 3. Hot water boilers installed above radiation level must be provided with a low water cut- off device. 4. When a boiler is connected to a heating system that utilizes multiple zoned circulators, each circulator must be supplied with a flow control valve to prevent gravity circulation. 5. H ...

  • UTICA BOILERS Gas-fired Boiler - page 9

    PAGE 8 7. Installation using circulators is shown in figure 9 below. 8. Installation using zone valves is shown in figure 10 on page 9. 9. For further piping information refer to the I=B=R Installation and Piping Guide. FIGURE 9 FIGURE 8 PRIMARY SECONDARY PIPING WITH BY PASS ...

  • UTICA BOILERS Gas-fired Boiler - page 10

    PAGE 9 VENT INST VENT INST VENT INST VENT INST VENT INST ALLA ALLA ALLA ALLA ALLA TION TION TION TION TION WARNING: WARNING: WARNING: WARNING: WARNING: This boiler shall not be connected to any portion of a mechanical draft system operating under positive pressure. 1. The vent pipe must slope upward from the boiler not less then 1/4 inch for every ...

  • UTICA BOILERS Gas-fired Boiler - page 11

    VENT SY VENT SY VENT SY VENT SY VENT SY STEM MODIFICA STEM MODIFICA STEM MODIFICA STEM MODIFICA STEM MODIFICA TION TION TION TION TION When an existing boiler is removed from a common venting system, the common venting system is likely to be too large for the proper venting of the appliances remained connected to it. If this situation occurs, the f ...

  • UTICA BOILERS Gas-fired Boiler - page 12

    VENT D VENT D VENT D VENT D VENT D AMPER INST AMPER INST AMPER INST AMPER INST AMPER INST ALLA ALLA ALLA ALLA ALLA TION TION TION TION TION AND INSTR AND INSTR AND INSTR AND INSTR AND INSTR UCTIONS UCTIONS UCTIONS UCTIONS UCTIONS INSTALLATION INSTALLATION INSTALLATION INSTALLATION INSTALLATION NOTE: Refer to Figure 11for steps 1 - 7. 1. Place Vent ...

  • UTICA BOILERS Gas-fired Boiler - page 13

    CONNECTING GAS SERVICE CONNECTING GAS SERVICE CONNECTING GAS SERVICE CONNECTING GAS SERVICE CONNECTING GAS SERVICE 1. Connect gas service from meter to control assembly in accordance with ANSI Z223.1 and local codes or utility. A ground joint union should be installed for easy removal of gas control for servicing. A drip leg or trap must be install ...

  • UTICA BOILERS Gas-fired Boiler - page 14

    LIGHTING INSTRUCTIONS LIGHTING INSTRUCTIONS LIGHTING INSTRUCTIONS LIGHTING INSTRUCTIONS LIGHTING INSTRUCTIONS WARNING: WARNING: WARNING: WARNING: WARNING: IF YOU DO NOT FOLLOW THESE INSTRUCTIONS EXACTLY, A FIRE OR EXPLOSION MAY RESULT CAUSING PROPERTY DAMAGE, PERSONAL INJURY OR LOSS OF LIFE. Before any procedures are attempted on this appliance, it ...

  • UTICA BOILERS Gas-fired Boiler - page 15

    FIGURE 14 PAGE 14 LIGHTING PROCEDURE FOR BOILER WITH LIGHTING PROCEDURE FOR BOILER WITH LIGHTING PROCEDURE FOR BOILER WITH LIGHTING PROCEDURE FOR BOILER WITH LIGHTING PROCEDURE FOR BOILER WITH INTERMITTENT PIL INTERMITTENT PIL INTERMITTENT PIL INTERMITTENT PIL INTERMITTENT PIL O O O O O T SY T SY T SY T SY T SY STEMS STEMS STEMS STEMS STEMS . . . . ...

  • UTICA BOILERS Gas-fired Boiler - page 16

    LIGHTING PROCEDURE FOR BOILER LIGHTING PROCEDURE FOR BOILER LIGHTING PROCEDURE FOR BOILER LIGHTING PROCEDURE FOR BOILER LIGHTING PROCEDURE FOR BOILER WITH CONTINUOUS PIL WITH CONTINUOUS PIL WITH CONTINUOUS PIL WITH CONTINUOUS PIL WITH CONTINUOUS PIL O O O O O T T T T T FOR YOUR SAFETY READ BEFORE LIGHTING FOR YOUR SAFETY READ BEFORE LIGHTING FOR YO ...

  • UTICA BOILERS Gas-fired Boiler - page 17

    9. Push in gas control knob or reset button if so equipped, all the way in and hold. Immediately light the pilot with a match. Continue to hold the gas control knob or reset button in for about 1 minute after the pilot is lit. Release knob or button, and it will pop up back up. Pilot should remain lit. If it goes out, repeat steps 5 through 9. * If ...

  • UTICA BOILERS Gas-fired Boiler - page 18

    GENERAL INSTRUCTIONS GENERAL INSTRUCTIONS GENERAL INSTRUCTIONS GENERAL INSTRUCTIONS GENERAL INSTRUCTIONS Before seasonal start-up, have a competent service agency check the boiler for soot and scale in the flues, clean the burners and check the gas input rate to maintain high operating efficiency. CA CA CA CA CA UTION: UTION: UTION: UTION: UTION: L ...

  • UTICA BOILERS Gas-fired Boiler - page 19

    FIGURE 19 FIGURE 20 PAGE 18 the mirror positioned above the burners, the flue gas passageways can be checked for soot or scale. The following procedure should be followed to clean the flue gas passageways: 1. Remove the burners from the combustion chamber by raising the burners up from the manifold orifices and pulling toward the front of the boile ...

  • UTICA BOILERS Gas-fired Boiler - page 20

    The burners and pilot should be checked for signs of corrosion, rust or scale buildup. The area around the boiler must be kept clear and free of combustible materials, gasoline and other flammable vapors and liquids. The free flow of combustion and ventilating air to the boiler and boiler room must not be restricted or blocked. It is recommended th ...

  • UTICA BOILERS Gas-fired Boiler - page 21

    PAGE 20 CHECK SAFETY CONTROL CIRCUIT, after burner adjustments are made, for satisfactory operation. 1. Pilot: With main burner operating, turn the pilot gas adjusting screw clockwise until pilot gas is turned off. See figures 14, 15, & 16 on pages 14 & 15. Within 90 seconds the main gas control should close, shutting off the gas to the mai ...

  • UTICA BOILERS Gas-fired Boiler - page 22

    MGB SERIES REPLA MGB SERIES REPLA MGB SERIES REPLA MGB SERIES REPLA MGB SERIES REPLA CEMENT P CEMENT P CEMENT P CEMENT P CEMENT P AR AR AR AR AR TS - PIL TS - PIL TS - PIL TS - PIL TS - PIL O O O O O TS TS TS TS TS FIGURE 25 PAGE 21 1 1520001 THERMOCOUPLE Q309A 1 2 HW-009.01 SCREW #8-18X1/2 4 3 PB-011.03 PILOT STDG Q380 NAT 1 PB-011.04 PILOT STDG Q ...

  • UTICA BOILERS Gas-fired Boiler - page 23

    MGB SERIES REPLA MGB SERIES REPLA MGB SERIES REPLA MGB SERIES REPLA MGB SERIES REPLA CEMENT P CEMENT P CEMENT P CEMENT P CEMENT P AR AR AR AR AR TS - B TS - B TS - B TS - B TS - B ASE ASE ASE ASE ASE FIGURE 26 PAGE 22 1 3352401 BURNER TUBE 1.3/4" MGB50 (1) MGB75 (2) MGB100 (2) MGB125 (3) MGB150 (3) MGB175 (4) MGB200 (4) MGB250 (5) MGB300 (6) 2 ...

  • UTICA BOILERS Gas-fired Boiler - page 24

    MGB SERIES REPLA MGB SERIES REPLA MGB SERIES REPLA MGB SERIES REPLA MGB SERIES REPLA CEMENT P CEMENT P CEMENT P CEMENT P CEMENT P AR AR AR AR AR TS - J TS - J TS - J TS - J TS - J A A A A A CKETS CKETS CKETS CKETS CKETS FIGURE 27 PAGE 23 1 31621501 PANEL - TOP MGB50 1 31621502 PANEL - TOP MGB75 & 100 31621503 PANEL - TOP MGB125 31621504 PANEL - ...

  • UTICA BOILERS Gas-fired Boiler - page 25

    MGB SERIES REPLA MGB SERIES REPLA MGB SERIES REPLA MGB SERIES REPLA MGB SERIES REPLA CEMENT P CEMENT P CEMENT P CEMENT P CEMENT P AR AR AR AR AR TS TS TS TS TS HEA HEA HEA HEA HEA T EX T EX T EX T EX T EX CHANGER CHANGER CHANGER CHANGER CHANGER FIGURE 28 PAGE 24 ITEM NO P /N DESCRIPTION QTY. 1 100-2-2.01 B-LEFT HAND SECTION 1 2 100-2-1.01 B-CENTER ...

  • UTICA BOILERS Gas-fired Boiler - page 26

    MGB SERIES REPLA MGB SERIES REPLA MGB SERIES REPLA MGB SERIES REPLA MGB SERIES REPLA CEMENT P CEMENT P CEMENT P CEMENT P CEMENT P AR AR AR AR AR TS TS TS TS TS PIPING & CONTROLS PIPING & CONTROLS PIPING & CONTROLS PIPING & CONTROLS PIPING & CONTROLS FIGURE 29 PAGE 25 ITEM NO P/N DESCRIPTION QTY. 1 37513301 WIRE ROLLOUT/SPILL 28& ...

  • UTICA BOILERS Gas-fired Boiler - page 27

    § § § ** † ∆ ∆ ∆ ∆ ∆ Natural Propane Boiler A.G.A. Heating I=B=R NetRating No. Recommended Gas Orifice Water No. Input Capacity NetOutput S q . F t . H W of Air Cushion Orifice Drill Content Btu/Hr. Btu/Hr. Btu/Hr @ 1 70 o Burners Tank Drill Size Size (Gals.) MGB 50 50,000 42,000 37,000 24 3 1 15 30 47 2.4 MGB 75 75,000 63,000 55,000 ...

  • UTICA BOILERS Gas-fired Boiler - page 28

    * Pump size Boiler Natural Dimensions Supply & No. Ga s Return Inlet A B C D E F Tappings MGB 50 1/2" 11.1/8" 5.1/2" 4" 30.3/4" 36.1/4" 6" 1.1/4" MGB 75 1/2" 15 7.1/2" 5" 30.3/4" 37.3/4" 6" 1.1/4" MGB 100 1/2" 15 7.1/2" 6" 30.3/4" 37.1/4" 6.1/2&q ...

Производитель UTICA BOILERS Категория Boiler

Документы, которые мы получаем от производителя устройства UTICA BOILERS Gas-fired Boiler мы можем разделить на несколько групп. Это в частности:
- технические чертежи UTICA BOILERS
- инструкции обслуживания Gas-fired Boiler
- паспорта изделия UTICA BOILERS
- информационные брошюры
- энергетические этикетки UTICA BOILERS Gas-fired Boiler
Все из них важны, однако самую важную информацию с точки зрения пользователя мы найдем в инструкции обслуживания UTICA BOILERS Gas-fired Boiler.

Группа документов, определяемая как инструкции обслуживания, делится также на более подробные типы, такие как: Инструкции монтажа UTICA BOILERS Gas-fired Boiler, инструкции обслуживания, короткие инструкции или инструкции пользователя UTICA BOILERS Gas-fired Boiler. В зависимости от потребностей, Вам необходимо поискать требуемый документ. На нашем сайте Вы можете просмотреть самую популярную инструкцию использования изделия UTICA BOILERS Gas-fired Boiler.

Похожие инструкции обслуживания

Полная инструкция обслуживания устройства UTICA BOILERS Gas-fired Boiler, как должна выглядеть?
Инструкция обслуживания, определяемая также как пособие пользователя, или просто "руководство" - это технический документ, цель которого заключается в использовании UTICA BOILERS Gas-fired Boiler пользователями. Инструкции пишет, как правило технический писатель, языком, доступным для всех пользователей UTICA BOILERS Gas-fired Boiler.

Полная инструкция обслуживания UTICA BOILERS, должна заключать несколько основных элементов. Часть из них менее важная, как например: обложка / титульный лист или авторские страницы. Однако остальная часть, должна дать нам важную с точки зрения пользователя информацию.

1. Вступление и рекомендации, как пользоваться инструкцией UTICA BOILERS Gas-fired Boiler - В начале каждой инструкции, необходимо найти указания, как пользоваться данным пособием. Здесь должна находится информация, касающаяся местонахождения содержания UTICA BOILERS Gas-fired Boiler, FAQ и самых распространенных проблем - то есть мест, которые чаще всего ищут пользователи в каждой инструкции обслуживания
2. Содержание - индекс всех советов, касающихся UTICA BOILERS Gas-fired Boiler, которое найдем в данном документе
3. Советы по использованию основных функций устройства UTICA BOILERS Gas-fired Boiler - которые должны облегчить нам первые шаги во время использования UTICA BOILERS Gas-fired Boiler
4. Troubleshooting - систематизированный ряд действия, который поможет нам диагностировать а в дальнейшем очередность решения важнейших проблем UTICA BOILERS Gas-fired Boiler
5. FAQ - чаще всего задаваемые вопросы
6. Контактные данные Информация о том, где искать контактные данные производителя / сервисного центра UTICA BOILERS Gas-fired Boiler в данной стране, если самостоятельно не получится решить проблему.

У вас вопрос, касающийся UTICA BOILERS Gas-fired Boiler?

Воспользуйтесь формуляром, находящимся ниже

Если с помощью найденной инструкции Вы не решили свою проблему с UTICA BOILERS Gas-fired Boiler, задайте вопрос, заполнив следующий формуляр. Если у какого то из пользователей была похожая проблема с UTICA BOILERS Gas-fired Boiler со всей вероятностью он захочет поделиться методом ее решения.

Перепишите текст с картинки

Комментарии (0)