Bryant 619CNQの取扱説明書

24ページ 2.11 mb
ダウンロード

ページに移動 of 24

Summary
  • Bryant 619CNQ - page 1

    Cancels: II 619C-24-3 II 619C-24-4 4/15/06 CONTENTS Page SAFETY CONSIDERA TIONS . . . . . . . . . . . . . . . . . . . . . . . . . 1 INST ALLA TION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-17 I. Step 1 — Complete Pre-Installation Checks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 II. Step ...

  • Bryant 619CNQ - page 2

    —2— T able 1 — System Matches *Units must be field reconfigured f or 1 1 / 2 ton (18,000 Btuh) operation. See Bef ore Installation section on page 3 for details. NO T E: Numbers in ( ) indicate quantities when there is more than one fan coil unit in the system. Ensure unit operation within the application guidelines shown in T able 2. When in ...

  • Bryant 619CNQ - page 3

    —3— T able 3A — Physical Data, Unde r Ceiling Cooling Onl y Units *Field reconfigured to 18,000 Btuh (1 1 / 2 tons). See Before Installation section on this page for details . †The valv e connect ion size is 7 / 8 inch. The recommended line size is 1 1 / 8 inch. I. STEP 1 — COMPLETE PRE-INST ALLA TION CHECKS A. Unpack Unit Store fan coil ...

  • Bryant 619CNQ - page 4

    —4— T able 3B — Physical Data, Under Ceiling Heat Pump Units *Field reconfigured to 18,000 Btuh (1 1 / 2 tons). See Before Installation section on page 3 for details. †The valv e connect ion size is 7 / 8 inch. The recommended line size is 1 1 / 8 inch. 3. Remove inlet grilles from in door unit by sliding for- ward. Reinstall prior to unit ...

  • Bryant 619CNQ - page 5

    —5— Fig. 3 — Base Unit Dimensions UNIT SIZE WEIGHT (lb) A B E F G Cooling Only Heat Pump ft-in. mm ft-in. mm ft-in. mm ft-in. mm ft-in. mm 024 108 110 4- 2 15 / 16 1294 3-10 1169 4- 1 5 / 8 1260 — — 1- 9 5 / 8 549 036 117 119 4-10 13 / 16 1493 4- 5 7 / 8 1368 4- 9 1 / 2 1459 — — 2- 1 1 / 2 648 048 149 151 5-11 9 / 16 1817 5- 6 5 / 8 1 ...

  • Bryant 619CNQ - page 6

    —6— 5. Run refrigerant piping as directly as possible and avoid any unnecessary turns or ben ds . 6. Condensate piping can be dir ected through the inside wall to an approved drain or straight o utside. NO TE: The piping hole for condensate line must slope at a minimum pitch of 1 / 4 in. per foot to ensure proper drainage . If proper pitch cann ...

  • Bryant 619CNQ - page 7

    —7— F . T o Install Thermostat: If there is at least 3 / 8 in. of space between the back of indoor unit and wall: 1. Route thermostat wires (fi eld-supplied) through slot in right side or rear panel of indoor unit (F ig. 3). 2. Route wires over refr igerant and drain piping as shown in Fig . 12. IMPORT ANT : Do not route wires under the piping ...

  • Bryant 619CNQ - page 8

    —8— 3. Insulate and caulk wall openings to reduce air infil- tration and refrigerant pipe vibrations on structure. 4. Evacuate piping, if necessary . If either refrigerant piping or the indoor coil is exposed to atmospheric conditions , it must be ev acua ted to 1000 microns to eliminate contamination and moisture in the system. V . STEP 5 — ...

  • Bryant 619CNQ - page 9

    —9— HEX-HEAD BOLT MOUNTING SLOT Fig. 10 — Mounting Ha nging Brackets Fig. 11 — Hangin g Fan Co il Unit *F actor y-supplied. Fig. 12 — Routing Wires Over Piping NO TE: T eflon Seal must face to ward the outdoor heat pump unit. Fig. 13 — AccuRater Meteri ng Device at Service V alve (Bypass T ype Components), Heat Pump Systems Only a40-625 ...

  • Bryant 619CNQ - page 10

    —10— VI. STEP 6 — MAKE ELECTRICAL CONNECTIONS Be sure field wiring complies with local building codes and NEC , and unit voltage is within limits shown in T ab le 5. Contact local power company for correction of improper line voltage. NO TE: Use copper wire only betw een disconnect switch(es) and unit. NO TE: Instal l branch circuit disconnec ...

  • Bryant 619CNQ - page 11

    —11— Fig. 14 — Component Location (T ypical Ceiling-Suspended System) LEGEND *Standard. †Accessory item. **Field supplied. ††Insulate for heat pump application. NO T ES: 1. All piping must f ollow standard refr igerant piping techniques. 2. All wiring must comply with the applicable local and national codes . 3. Liquid line need not be ...

  • Bryant 619CNQ - page 12

    —12— VII. STEP 7 — INST ALL THERMOST A T These systems use a 3-speed thermostat. The thermostat monitors the system operatio n and controls the operating mode. T o change settings or re fer to the thermostat Operat- ing Instructions. Mount thermostat to a wall in the occupied space using 2 field-supplied screws . Locate th e thermostat in an ...

  • Bryant 619CNQ - page 13

    —13— LEGEND ASM — Air Sweep Motor ASR — Air Sw ee p Rela y EQUIP GND — Equipment Ground FL — Fuse Link FPT — F reeze Protection Ther mostat HP — Heat Pump HR — Heater Relay HTR — Heater HTT — Heater T emp. Thermostat IFM — Indoor-F an Motor NEC — National Electrical Code PL — Plug TB — T er minal Board TRAN — T ransf ...

  • Bryant 619CNQ - page 14

    —14— AUTO COOL HEA T COOL HEA T AUTO FLA T THERMOST A T (FLA TST A T) COOLING ONL Y HEA T & COOL (53DFS250-FS-BR Y) SLIMLINE THERMOST A T HEA T PUMP COOLING ONL Y HEA T & COO L (53DFS250-SL-BR Y) 5-1-1 PROGRAMMABLE THERMOST A T COOLING ONL Y HEA T & COOL (53DFST2-NP-BR Y) Fig. 18 — Thermostats a40-1384 a40-1385 a40-1386 ...

  • Bryant 619CNQ - page 15

    —15— VIII. STEP 8 — MAKE CONNECTIONS BETWEEN INDOOR AND OUTDOOR UNITS The thermostat is wired betw een the indoor and outdoor units to make the s ystem complete. A. Check AccuRater Metering Device The correct Ac cuRater (bypass type) refrigerant con t rol is required for system capacity optimization. An AccuRater device (see Fig. 19) is suppl ...

  • Bryant 619CNQ - page 16

    —16— 5 38 A 619CNF ,CNQ 5 38 A 619CNF ,CNQ Fig. 20 — Cooling System Wiring Diagram a40-1636 ...

  • Bryant 619CNQ - page 17

    —17— 619CNQ 5 38 B 5 38 B 619CNQ Fig. 21 — Heat Pump Wiring Diagram a40-1637 ...

  • Bryant 619CNQ - page 18

    —18— ST ART -UP Make the following checks and complete the Start-Up Check- list on page CL-1 before sy stem start-up. Also refer to the condensing unit Installation, St art-Up and Service Instructions for system start-up instructions and refrigerant charging methods . 1. Check condensate drainage system: a. Remove grille and frame from the unit ...

  • Bryant 619CNQ - page 19

    —19— The DFB logic checks the 10-m inute defrost timer and the DFT . If the DFT opens in less than 10 minutes , the DFB switches the unit back to norm al heating operation. If the DFT remains closed, the DFB switches the unit back to heating operation after 10 minu tes. When the DFB changes back to heating mode , the RVR (reversing valve relay) ...

  • Bryant 619CNQ - page 20

    —20— III. CLEAN INDOOR UNIT BOTT OM P ANEL If the bottom panel of the unit becomes dirty or smudged, wipe the outside of the panel wi th a soft dry cloth. Use a mild liquid detergent and wipe off carefully with a dry cloth. IV . CLEAN INDOOR COIL T o clean the coil, remove ind oor unit bottom panel and vac- uum the coil fins, using care not to ...

  • Bryant 619CNQ - page 21

    —21— T able 7 — T roubleshooting *If fuse blo ws or circuit breaker trips again after firs t star t attempt, DO NOT attempt to start system again. Contact your local dealer f or assistance. †When outdoor temperature is approximately 55 F or bel ow , indoor coil frosting may occur when system is operated in cooling or maximum dehumidificatio ...

  • Bryant 619CNQ - page 22

    Copy right 2006 Bryant Heating & Cooling Systems Printed in U.S .A. CA T ALOG NO . 02-619C0001-II SER VICE TRAINING P ackaged Service Training programs are an excellent wa y to in crease your knowledge of the equip- ment discussed in this manual, includi ng: • Unit F amiliarization • Maintenance • Installation Overview • Operating Seque ...

  • Bryant 619CNQ - page 23

    CL-1 ST ART -UP CHECKLIST I. PRELIMINAR Y INFORMA TION OUTDOOR UNIT : MODEL NO. ___________________ INDOOR UNIT : MODEL NO . _____________________ SERIAL NO . ________________________________ ___ SERIAL NO . ________________________________ ___ ACCESSORIES: _________________________________________ _________________________________________ PISTONS: ...

  • Bryant 619CNQ - page 24

    Copy right 2006 Bryant Heating & Cooling Systems Printed in U .S.A. CL-2 6-06A CA T ALOG NO. 02-619C00 01-II CUT ALONG DO TTED LINE CUT ALONG DOTTED LINE ST ART -UP CHECKLIST (c ont) IV . ST ART -UP IF UNIT HAS A CRANKC ASE HEATER, HAS IT BEEN ON FOR 24 HOURS? ____________ MEASURE AND RECORD THE: AIR ENTERING OUTDOOR UNIT : ____________ F AIR E ...

メーカー Bryant カテゴリー Air Conditioner

Bryant 619CNQのメーカーから受け取ることができるドキュメントは、いくつかのグループに分けられます。その一部は次の通りです:
- #BRANDの図面#
- 619CNQの取扱説明書
- Bryantの製品カード
- パンフレット
- またはBryant 619CNQの消費電力シール
それらは全部重要ですが、デバイス使用の観点から最も重要な情報は、Bryant 619CNQの取扱説明書に含まれています。

取扱説明書と呼ばれる文書のグループは、Bryant 619CNQの取り付け説明書、サービスマニュアル、簡易説明書、またはBryant 619CNQのユーザーマニュアル等、より具体的なカテゴリーに分類されます。ご必要に応じてドキュメントを検索しましょう。私たちのウェブサイトでは、Bryant 619CNQの製品を使用するにあたって最も人気のある説明書を閲覧できます。

関連する取扱説明書

Bryant 619CNQデバイスの取扱説明書はどのようなものですか?
取扱説明書は、ユーザーマニュアル又は単に「マニュアル」とも呼ばれ、ユーザーがBryant 619CNQを使用するのを助ける技術的文書のことです。説明書は通常、全てのBryant 619CNQユーザーが容易に理解できる文章にて書かれており、その作成者はその分野の専門家です。

Bryantの取扱説明書には、基本的な要素が記載されているはずです。その一部は、カバー/タイトルページ、著作権ページ等、比較的重要度の低いものです。ですが、その他の部分には、ユーザーにとって重要な情報が記載されているはずです。

1. Bryant 619CNQの説明書の概要と使用方法。説明書にはまず、その閲覧方法に関する手引きが書かれているはずです。そこにははBryant 619CNQの目次に関する情報やよくある質問、最も一般的な問題に関する情報を見つけられるはずです。つまり、それらはユーザーが取扱説明書に最も期待する情報なのです。
2. 目次。Bryant 619CNQに関してこのドキュメントで見つけることができる全てのヒントの目次
3. Bryant 619CNQデバイスの基本機能を使うにあたってのヒント。 Bryant 619CNQのユーザーが使い始めるのを助けてくれるはずです。
4. トラブルシューティング。Bryant 619CNQに関する最も重要な問題を診断し、解決するために役立つ体系化された手続き
5. FAQ。よくある質問
6. 連絡先。一人では問題を解決できない場合に、その国におけるBryant 619CNQのメーカー/サービスへの連絡先に関する情報。

Bryant 619CNQについてご質問がありますか?

次のフォームを使用してください

見つけた説明書を読んでもBryant 619CNQの問題を解決できない場合、下記のフォームを使用して質問をしましょう。ユーザーのどなたかがBryant 619CNQで同様の問題を抱えていた場合、その解決方法を共有したいと考えるかもしれません。

画像のテキストを入力してください

コメント (0)